UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 lItAR 1V 1982 Docket Nos.
50-275 and 50-323 Ms. Lois M. Barber, President LMB Hand Rehab Products, Inc.
P.O.
Box 1181 San Luis Obispo, CA 93406 RECB>SEQ MAR2 3]98Ps
. I'I ~4Nramen earn g@ImtI QQttg ag rIOC
Dear Ms.Barber:
This is in response to your recent message to President Reagan expressing your opposition to the licensing of the Diablo Canyon Nuclear Power'lant.
NRC has a mandate to assure adequate protection of the public.health and safety and the implementation of this mandate is our principal concern.
- Indeed, we issued no licenses, following the TMI accident until we were assured that the lessons learned could be suitably incorporated into the plant designs.
Similarly, no full-power licenses are issued without the Federal Emergency Management Agency's review and evaluation of the applicants'mergency preparedness plans.
Extensive public hearings have been held before an Atomic Safety and Licensing Board (ASLB) on various matters concerning the status of Diablo Canyon.
The Hosgri Fault, which is located 2< miles offshore from the Diablo Canyon
- plants, was discovered in 1971 and has been the subject of intensive investigation by the Pacific Gas 8 Electric Company (PG&E), the U.S.
g Geological Survey (USGS) and the Nuclear Regulatory Commission.
As a
-principal geological advisor for the Commission, the USGS in 1975 suggested t'I)at a magnitude of 7.5 be assigned as a potential seismic value for the
. Hosgri Fault.
On September
-26, -1979, the ASLB assigned to conduct the
~licbnsing hearings issued its partial initial decision which found that a 7.5 magnitude earthquake is reasonable
'and meets regulatory requirements.
On July 17, 1981, the Board issued its findings, concluding that operation of the Diablo facility at power levels not to exceed 5X rated power would not pose an un'due risk to the health and safety of the general public.
The NRC issued a
low power license on 'September 22, 1981.
On September 28; 1981, PG8E notified the NRC staff that incorrect verticaf response spectra were used in the design of seismic restraints for certain piping and components.
The Commission suspended the low power operating license on November 19, 1981, and requested that additional information be submitted to assure that the piping and components restraints have been properly designed prior to a decision on re-instating the low power license; I
820330007B 8203i7 tPDR ADOCK 05000275 PDR OFFICE/
SURNAME/
DATEQ
~ ~ 0 ~ 0 ~ Ot ~ OtOtttO ~ F 0'
~ ~ ~ 0 ~ ~ ~ 0 ~
~ ~ 0 ~ ~\\ ~ ~ ~ ~ 0
~
~ ~ ~ ~ ~
~ ~ ~ ~ ~
~
~ 0 ~
~ 0 ~ ~ 0 ~
~ ~ ~ ~
~ ~ 0 ~ ~ ~
0
~ ~ ~
~
~ ~ ~
~
~ ~
~
~ 0 ~ 0 NRG FORM 318 {1040) NRCM 0240 OFFICIAL RECORD,COPY USGPO: 1$S1~960
(++]
( ff I
I
/
ff
(
The thoroughness with which these matters are being considered should reassure you that every effort is being made to protect the public health and safety in the event that the Nuclear Regulatory Commission reinstates the -low-power operating license to Diablo Canyon.
Your comments and interest in this matter are appreciated.
Sincerely, Ogiginai Signed by Riohard C..Brady Herbert N. Berkow, Chief Management Analysis Branch Planning and Program Analysis Staff Office of Nuclear Reactor Regulation OFFICEI SURNAME/
DATE0
~ ~ ~ ~ ~ ~ ~
~ 0
~
~
~
3/ /1 /82
~ ~ ~ ~ ~ ~ ~ ~ I ~ ~
~ ~ ~ ~ ooo ~ o ~ ~
M ow
/J
/82
~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~
~
~
~ ~ I~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ 0 NRC FOAM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY U$QPQ 198'I-$M960
Oi D
,IDENTICAL LETTE SENT TO:
Ms. Rois M. Sarber, President LMB Hand Rehab Products, Xnc.
P.O.
Sox 1181 San louis Obispo, CA 93406 Bear Hs. Sarber:
Hs. Virginia P.
Sruno Pecho Ranch Sox 6289 Yos Osos, CA 93401
Dear Ms. Sruno:
DISTRIBUTION:
Docket Files 50:-2.7.5~/
50-323 W LPDR (2)
NRC PDR (2)
TERA/DCS HBerkow PPAS NAB R/F VWilson Ms. Nancy X,angert 6504.Raymond Street
- Oakland, CA 94609 Bear Hs.
7 angert:
Ms. Rlizabeth Burke 2000 Xas Canoas Road Santa Sarbara, CA 93105
Dear Ms. Surke:
Hr. Joey Hutchinson 3103 Maplethorpe Lane
- Sorel, CA 95073
Dear Hr. Hutchinson':
- .Mr. Cris Rggers
'7662 Old Redwood Highway
- Cotatx, CA 94928
Dear Hr. Eggers:
Mr. Jesse Almanza 6100 Stow Canyon Road
- Goleta, CA 93017
Dear Mr. Almanza:
.0
Ms. Rebecca J.
Goetze 925 Roble T,ane Santa Barbara, CA 93103
Dear Ms. Goetze:
Hs. Xinda Hespole 6743 Del Playa'8
- Goleta, CA 93117 Bear Ms. Hespole:
Hr. Gerald A. Crawford 6640 3 Pasado Road
- Goleta, CA 93117
Dear Hr. Crawford:
Mr. Terry Cummings 6650 Picasso Road
- Goleta, CA 93117
Dear Hr. Cummings:
Hr. Edward H. Rehberg 225 X,os Amazes Santa Sarbara, CA 93101
Dear Hr. Rehberg:
- ,Mr. Todd Spillman
'.0.
Box 5099 Tahoe City, CA 95730 Bear Mr. Spillman:
Hr. Paul Chen 30521 Canwood Drive
- Agoura, CA 91301
Dear Mr. Chen:
0
Hs. Lisa posada 5210 Y.os Coyotes Diag Iong Beach, CA 90815
Dear Ms. posada:
Hs. Suellen Hose 28970 Sherwood Road Mill,its, CA 95490
Dear Hs. Hose:
Ms. 'teresa Bertsch 260 Santa Honica Henlo Park, CA 94025
Dear Ms. Bertsch:
Mrs. Francis P. Howley 1582 North Hill Avenue
- Pasadena, CA 91104
Dear Mrs. Howley:
Ms. Xynn Greenberg 766 Zingman Road Santa Honica, CA 90402
'ear Hs. Greenberg:
ifs. Catherine Rooney 2600 Ridge Road
- Berkeley, CA 94709
Dear Hs. Rooney:
Hr. and Hrs. Hick Carra Box 189 C See Canyon Road San Luis Obispo, CA 93401
Dear Hr. and Hrs. Carra:
Ms. Jean T. Day 6448'oiby Street
- Oakland, CA 94618
Dear Hs. Day:
Ms. Diane Suck).ey Griffin 104 De). Norte Way San Luis Obispo, CA 93401
Dear Hs. Griffin:
Hs. Erika Hazen Route 1, Box 172 San Luis Obispo, CA 93401
Dear Ms. Hazen:
Hr. and Hrs.
Paul. J. Smith 103 Park View Avenue Grover City, CA 93433
Dear Hr. and Hrs. Smith:
Hs. Robin Ranker 512 H. Hicho3.son i/3 Honterey Park, CA 91754
Dear Hs. Ranker:
/.:Hr. Rh.i Atkins 3131 Hawes Drive Santa
- Cruz, CA. 95062
Dear Mr. Atkins:
Mr. and Hrs.
James P. Bruzenak 257 Travis Drive Los Osos, CA 93402
Dear Mr. and Mrs. Bruzenak:
Dr. and Mrs. Dugald D. Chisholm 10420 Rl Camino Real Atascadero, CA 93422
Dear Dr. and Mrs. Chisholm:
Hs. Nancy Mi3.lison 230 Catalina San Luis Obispo, CA 93401
Dear Ms. Millison:
Ms. Hiki Sanders 3017 South Conyer
- Visalia, CA 93277
Dear Hs. Sanders:
Mr. and Hrs. 3'ack R. Siesek 193 See Canyon Road San Luis Obispo, CA 93401
Dear Mr. and Mrs. Siesek:
Hr. Ruben Havarro 3702 Harriman Avenue Los Angeles, CA 90032
Dear Hr. Havarro:
<. Ms. Lucia DiPietro 16407 Rinaldi Street Granada Hills, CA 91344
Dear Hs. DiPietro:
Ms. Hary Olofson 4068 Rio Road
- Carmel, CA 93923
Dear Ms. Olofson:
0
Ms. Donnie Oakley 1165 5th Place.
Port Hueneme, CA 93041
Dear Hs. Oakley:
Hs. Linda Sorensen 2737 Southview Arroyo Grand, CA 93420
Dear Hs. Sorensen:
Hr. Marty Caspe 2115 Alice Street Santa
- Cruz, CA 95062
Dear Hr. Caspe:
Hr. Hike Sokoloff 30782 Hain Hast Drive
- Agoura, CA 91301
Dear Hr. Sokoloff:
Hs. Haya H. Ashworth 113 Del Sur May San louis Obispo, CA 93401
Dear.Hs. Ashworth:
~ Hs. Vicky A. Peterson 4317 Abbington Court Mestlake Village, CA 91361
Dear Ms. Peterson:
Hs'. B. Bonita Shaiken, 2788 Crockett Circle Y.os Osos, CA 93402
Dear Hs. Shaiken:
4
Hs. Mary L. Basch 1517 Dutton Avenue Santa Barbara, CA 93101
Dear Hs. Basch:
Mr. Hichael D. Peck 28738 M. Pisces
- Agoura, CA 91301
Dear Hr. Peck:
Hr. Charles S.
Chapman P.O.
Box 2026
- Ventura, CA 93002
Dear Hr. Chapman:
Hs. Kori Sutton 2559 Harbor Boulevard g3
- Ventura, CA 93001
Dear Hs. Sutton:
Hs.
Susan Yeida 1402 Palm Street San louis Obispo, CA 93401
'ear Ms. Zelda:
~ )1s.
Dan Hg 729 M. 19th Street
- Chico, CA 95926
Dear Hs. Hg:
Hs. Kdris Hsi 5519 H. Ember Court
- Agoura, CA 91301
Dear Hs. Hsi:
0 0
\\
~
~
Ms. Jennifer Johnson 1812 A3.ice Street Santa
- Cruz, CA 95062
Dear Ms. Johnson:
Mr. Say Crosby P.O.
Box 392 Port Hueneme, CA 93041
Dear Mr. Crosby:
Ms. Marian G. Abrecht 1178 Pinewood Drive
- Cambria, CA 93428
Dear Ms. Abrecht:
Ms. Mary Athanasiou 122 Toyon Avenue So.
San Francisco, CA 94080
Dear Ms. Athanasiou:
't e+
'<< REg<
0
~
~c JP <<y*~4 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MAR 1V 1982 Docket Nos.
50-275 and
'0-323 l<~CPV.20 Hs.
Lois H. Barber, President LMB Hand Rehab Products, Inc.
P.O.
Box 1181 San Luis Obispo, CA 93406 rO b
Dear Ms. Barber:
g4'g
/&4 /.W P'l'his is in response to your recent message to President Reagan expressing your opposition to the licensing of the Diablo Canyon Nuclear Power Plant.
NRC has a mandate to assure adequate protection of the public,health and safety and the implementation of this mandate is our principal concern.
- Indeed, we issued no licenses following the TMI accident until we were assured that the lessons learned could be suitably incorporated into the plant designs.
Similarly, no full-power licenses are issued without the Federal Emergency Management Agency's review and evaluation of the applicants'mergency preparedness plans.
Extensive public hearings have been,held"before an Atomic Safety and Licensing Board (ASLB) on various matters concerning the status of Diablo Canyon.
The Hosgri Fault, which is located 2< miles offshore from the Diablo Canyon
- plants, was discovered iri 1971 and has been the subject of intensive investigation by the Pacific Gas 8 Electric Company (PG8E), the U.S..
Geological Survey (USGS) and the Nuclear Regulatory Commission.
As a principal geological advisor for the Commission, the USGS in 1975 suggested that a magnitude of 7. 5 be assigned as a potential seismic value for the Hosgr i Fault.
On September
-26, 1979, the ASLB assigned to conduct the lic'ensing hearings issued its partial initial decision which found that a 7.5 magnitude earthquake is reasonable and meets regulatory requirements.
On July 17, 1981, the Board issued its findings, concluding that operation of the Diablo 'facility at power levels not to exceed 5X rated power would not pose an undue risk. to the health and safety of the general public.
The NRC issued a
low power license on September 22, 1981.-
On September 28, 1981, PGEE notified the NRC staff that incorrect verticat'esponse spectra were used in the design of seismic restraints for certain'iping and components.
The Commission suspended the low power operating license on November 19, 1981, and requested that additioaal information 5e submitted to assure that the piping and components restraints have been properly designed prior to a decision on re-instating the low power license..
8203300078 8203i7 PDR
- DOCK 05000275 H
PDR OFFICE/
SURNAME/
DATEg ssnr
< apaa non ten nns Ill< <) <<n4<<
OFFICIAL RECORD COPY USGPO< <MI-%5-N
I>>
I'he thoroughness with which these matters are being considered should reassure you that every effo'rt is being made to protect the public health and safety in the event that the Nuclear Regulatory Commission reinstates 'the low-power operating license to Diablo Canyon.
Your comments and interest in this matter are appreciated. -'incerely, Oii."- n-." Hi~ned b7 Richard C. Brady Herbert N. Berkow, Chief Management Analysis Branch Planning and Program Analysis Staff Office of Nuclear Reactor Regulation r r r