Affidavit Re Contention 11.Technical Bases for Safety Evaluation Derived from & Supported by Applicant 810126 Submittal.Parties Do Not Technically Disagree on Listed Technical Points.Prof Qualifications Encl
ML16340B571
Person / Time
Site: Diablo Canyon  
Issue date: 03/31/1981
From: Fitzpatrick R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML16340B572 List:
References
ISSUANCES-OL, NUDOCS 8104070499
Download: ML16340B571 (32)


Text

, AFFIDAVIT OF ROBERT FITZPATRICK AND SUPPORTING DOCUMENTS

It is an inaccurate characterization to state that the pressurizer heaters are

~sim 1

added to the onsite emergency power supplies.

Item II.E.3.1 of NUREG-0737 contains four positions and seven clarifications which specifically detail the manner in which this connection must be accomplished'he thrust of these positions and clarifications is to assure that the capacity, capability and reliability of the onsite emergency power suppleis will not be degraded below'n acceptable level.

The staff safety evaluation on this item was prepared by me and is attached.

The technical bases for the attached safety evaluation are derived from and supported by the applicant's submittal of January 26, 1981.

This submittal is a letter from P.

Crane (PGSE) to F. Miraglia (NRC) concerning full power license requirements.

Pages II.E-12 thru II.E-19 address the pressurizer heaters and a copy is attached to this affidavit.

In addition, there is no technical disagreement between the parties on the following technical points based upon the response to our proposed admissions:

1)

The pressurizer heaters are a resistive load.

2) If the heaters are energized by the diesel generators (i.e. connected to the emergency bus), they will be automatically tripped upon occurence of an SIAS (safety injection actuation signal).

3)

The circuit breakers used to interface the motive and con-trol power to the heaters from the emergency buses are safety grade.

4)

These same safety grade circuit breakers (52-1G-72 and 52-1H-74) are the devices used to trip the heaters upon SIAS.

Based upon my review of this aspect of the Diablo Canyon design, I have not identified anything that would degrade the capacity, capability and/or reliability of the onsite emergency power system below an acceptable level.

Robert G. Fitzpatrick Subscribed and sworn to,before me

this, day ofr9g,'/1981

/

Notary Public:

My Commission expires: ~-'--'

ATTACHMENT I EDUCATIONAL AND PROFESSIONAL QUALIFICATIONS OF RCB ERT G.

FITZPATRICK EDUCATION B.S. Electrical Engineering 1971; Northeastern University, Boston, Mass.

I M.S. Electrical Engineering,'1972; Northeastern University, Boston, Mass.

Ma'or:

Electrical Power Sys.ems Engineering PROFESSIONAL UALIFI CATIONS I

am presently Section Leader of the Electrical Section of the Power Sys.ems Branch.

In this position, I provide technical supervision and review of the work 'of reac.or systems engineers conducting evaluations of operating reactor

problems, license amandments for operating reactors, license applications, generic assessments and special project assignments, I joined the NRC (ACE) in 1974 as a member of the Electrical, Instrumentation and Controls System Branch and in January 1977 I was assigned to the newly formed Power Systems Branch.

My duties during the above periods involved the technical review of electrical systems (onsite and offsite power, and instrumentation and control).

For approximately fifteen months following the March 1979 accident at Three Mile Island, I was detailed to the special Three Mile Island Support Group.

From 1R72 - 1974 I worked for Yankee Atomic Electrical Company-in Westboro, Massachusetts.

I was assigned to the Electrical and Control Engineering Group and my duties included work on the Yankee operating nuclear plants and the Seabrook Project.

(Prior to this I spent 3 years with Yankee as a cooperative education student while attending Northeastern University.)

I am a member of the IEEE and also represent the NRC as a member of IEEE Nuclear Power Engineering Committee Subcommittee 4 "Auxiliary Power Systems."

This Committee is charged with developing standards for onsite and offsite power systems.

t

ATTACH>1ENT 2 II.E.3.1 Emer enc Power Su 1

for Pressurizer Heaters Position Consistent with satisfying the requirements of General Oesign Criteria 10, 14, 15, 17, and 20 of Appendix A to 10 CFR Part 50 for the event of loss of offsite

power, the following positions shall be implemented:

(1)

The pressurizer heater power supply design shall provide the capability to supply, from either the offsite power source or the emergency power source (when offsite power is not available),

a predetermined number of pressurizer heaters and associated controls necessary to establish and maintain natural circulation at hot standby conditions.

The required heaters and their control,s shall be connected to the emergency buses in a manner that will provide redundant power supply capability.

(2)

Procedures and training shall be established to make the operator aware of when and how the required pressurizer heaters shall be connected to the emergency buses.

If required, the procedures shall identify under what conditions selected emergency loads can be shed from the emergency power source to provide sufficient capacity for the connection of the pressurizer heaters.

(3)

The time required to accomplish the connection of the preselected pressurizer heater to the emergency buses shall be consistent with the timely initiation and maintenance of natural circulation conditions.

(4)

Pressurizer heater motive and control power interfaces with the emergency buses shall be accomplished through devices that have been qualified in accordance with safety-grade requirements.

Clarification (1)

Redundant heater capacity must be provided, and each redundant heater or group of heaters should have access to only one Class IE division power supply.

Oiablo Canyon Full Power SER 2 26

'I

(2)

The number of heaters required to have access to each emergency power source is that number required to maintain natural circulation in the hot standby condition.

(3)

The power sources needed not necessarily have the capacity to provide power to the heaters concurrently with the loads required for loss-of-coolant accident.

(4)

Any changeover of the heaters from normal offiste power to emergency onsite power is to be accomplished manually in the control room.

(5)

In establishing procedure to manually load the pressurizer heaters onto the emergency power sources, careful consideration must be given to:

(a) which ESF loads may be appropriately shed for a given situation; (b) reset of the safety injection.actuation signal to permit the operation of the heaters; and (c) instrumentation and criteria for operator use to prevent over loading a diesel generator.

(6)

The Class IE interfaces for main power and control power are to be protected by safety-grade circuit breakers (see also Regulatory Guide 1. 75).

(7)

Being non-Class IE loads, the pressurizer heaters must be automatically shed from the emergency power sources upon the occurrence of a safety injection actuation signal (see item S.b above).

Discussion All four pressurizer heater groups in the Diablo Canyon design can be supplied from the offsite power sources when they are availab'le, and two of the four groups can be transferred to the emergency power sources when the offsite sources are not available.

Each of the two selected groups (12 8 13) has access ta only one Class IE diesel generator and their controls are likewise supplied from separate safety grade dc power supplies.

Each heater group Diablo Canyon Full Power SER 2~ 27'

I I ~

I 1

I

(12 8 13) is comprised of seven 69 kW heaters (483 kW total).

Therefore, energizing three of the seven heaters (207 kW) will be more than adequate to fulfill the calculated minimum heater requirement of 150 kW.

This is in accordance with NRC position 1 and clarification items 1 and 2.

In accordance with position 4 and clarification 6, the connection of the pressurizer heater elements and controls to the Class IE buses is=through safety'grade circuit breakers, and th'e heaters are automatically tripped off of the emergency buses upon occurrence of a safety injection (SI) signal in accordance with clarification 7.

PGEE has developed procedures and implemented the training of their operators to make them aware of when and how the required heaters should be connected to the emergency buses.

The procedures identify under what conditions selected loads can be shed from the emergency bus to prevent overloading the diesel generator when the pressurizer heaters are connected and also include provisions to reset the SI signal to permit the operation of the heaters.

Diesel generator and pressurizer heater loading 'information is displayed in the control room.

This covers position 2 and clarifications 3 and 5.

In order to align the pressurizer heaters to the emergency power source, an operator must be dispatched to the 100 ft level of the Auxiliary Building, three floors directly below the main control

room, and manually throw a transfer switch.

This action in itself does not connect the heaters to the emergency buses but allows subsequent operation'f the heaters from the emergency buses using the normal control devices provided on the main control console.

Although not in strict accordance with clarification item 4, this is considered an acceptable alternative since the heaters can be supp'lied with emergency power well within the one hour limit recommended by Westinghouse and therefore meets the criteria of position 3.

Conclusion Based on our review, we conclude that the design for providing emergency power to the pressurizer heaters at Diablo'Canyon Nuclear Generating Station Units 1 and 2 is consistent with the NRC positions and clarifications in NUREG-0737 and is acceptable.

Diablo Canyon Full Power SER 2-28

ATTACHIIENT 3 PGandE Res onse Res onse to Staff Position 1

All of the four pressurizer heater groups can be supplied with power from offsite power sources when they are available.

In addition, power can be provided to two out of four heater groups from the emergency power source through the Engineered safety Features (ESF) buses when offsite power is not available (see Figure II.E.3.1-1).

This arrangement is adequate for establishing and maintaining natural circulation during hot standby conditions.

Redundancy is provided by supplying each of the two groups of heaters from a different ESF bus.

The requirements as stated by the NRC staff relating to minimum capacity and time duration of the emergency power supply for the pressu'rizer heaters are well within current heater and power source design.

One bank of backup heaters will be available to each emergency power train within 60 minutes after loss of offsite power.

Pressurizer heat loss calculations show a minimum heater requirement of 150 kW without offsite power.

4 This minimum capacity is more than adequate to offset the heat lost from the pressurizer at or below normal operating pressure with no allowance for continuous spray.

With continuous

spray, loss of subcooling would occur in five to six hours.

Ability to supply emergency power to the heaters within four hours following a loss of offsite power will prevent loss of subcooling in the primary loop.

All of the equipment associated with pressurizer heater supply described in this response are seismically qualified for the Hosgri event except for those devices specifically noted as non-safety grade (see Figure II.E.3.1-,1).

l E '

Circuit breakers 52-G-72 and 52-1H-74 have been added to 480 volt ESF buses 1G and 1H, respectively (see Figure II.E.1-2).

These breakers have been installed and are seismically qualified to meet, safety-grade requi.rements; The seismic qualification is based on PGandE's testing experience on similar equipment which has previously demonstrated that electromechanical equipment can withstand numerous high seismic events without damage, and that the equipment will be available to perform its safety function when called upon after the seismic event.

The heater banks will be automatically tripped off of the ESF buses upon occurrence of a safety injection (Sl) actuation signal.

Res onse to Staff Position 2

PGandE has developed procedures and implemented the training of the operators to make the operator aware of when and how the required pressurizer heaters sho'uld be connected to the emergency buses.

Loading of each ESF bus can be accomplished from the main control board (see Staff Position 3 below).

Procedures have been established to identify under what conditions selected loads can be shed from the ESF bus to prevent overloading when the pressurizer heaters are connected.

The procedures include provisions to ensure that the heaters are transferred to the ESF power source as described in

Response

to Staff Position 3 below.

The procedures also include provisions to reset the Safety Injection Actuation Signal to permit the operation of the heaters.

The time required to transfer the power supplies is estimated to be less than 10 minutes and is expected to expose the operator to no more than 10 mRem.

I I. E-13

II

The procedures have been written and approved and have been incorporated into the Operating Procedures of the Plant Manual.

Most of the operators were trained on these procedures in October 1980.

One group of operators remains to be trained on these procedures.

They will be trained prior to full power operation.

Res onse to Staff Position 3 The design (see Figures II.E.3.1-3 and II.E.3.1-4) provides for simple and rapid transfer of the heater groups to the ESF power source.

The procedure for transfer of the heater groups to the ESF power source is described briefly below.

When it is'determined that the pressurizer heaters are required, the Shift Foreman needs only to dispatch an operator to the

'I 100 foot elevation in the Auxiliary Building, which is just three floors directly below the main control room (two separate stairwells are available).

Once in the area, the operator simply verifies that the source breakers (52-1H-74, 52-13D-6, 52-13E-2, 52-1G-72) are open (white "Power on" lights indicate if either source is energized),

and manually throws the deener-gized transfer switches.

This action in itself will not connect the pressurizer heaters.,onto the ESF buses.

Only when the Shift Foreman is informed that the transfers have been

made, will the heaters again be controlled using the normal control devices provided on the main control console (see Figure II.E.3.1-1).

Even with manual transfer, the heaters can be supplied with

', emergency power well within the one hour limit recommended by Westinghouse.

PGandE will provide control room indication of actual wattage being supplied to each heater group that has been transferred to the emergency power sources.

Diesel generator loading parameters are also displayed in the control doom.

I I. E-14

I 1

1

Res onse to Staff Position 4

As described in the Response to Staff Position 1, qualification in accordance with safety-grade requirements has been performed for devices which supply the pressurizer heaters with motive and control power from the emergency buses.

Specifically, the recently installed cir'cuit breakers, 52-1G-72 and 52-1H-74, in the 480 volt ESF buses 1G and 1H have been seismically qualified for the Hosgri event; ln addition, all of the equipment associated with the pressurizer heater power supply described above have been seismically qualified for the Hosgri event, except for those devices specifically noted as non-safety grade (Figure I I. E.3.1-1).'

l. E-15

il

6 10 iass BATTERY I2(I3)

'SF 84 TT.

CHCR.

VOY=S:

/. SHVNI'I TYPICA'LY FCR VVS BACA'-'i'SVVRA'EVVVVAV7GA'JVP SIII/IILAREXCEPT S=rAR'ATE-EQUIP/UIEIIT USED. NUMB 8'S ZN PARENTHESIS AR FOF RE'DUNQdhlT EQUIPklENT ESF BUS I2(a) ~

50P LC4fCLf I

I CS ON l

CS aue AUTO lPlTLff CS DFF CS QA' OFF IJ DNH1N6 CWrirOL SWTCh'f~($

I.ISIS/ATION/)

I I

I I

I I

I Ngl4-SAFE'lY SPADE'LOSE COIL 5z-l3E-29M&)

IPCOIL-r I

I I

I I

J I.

QNF CO'-IG-7I 524H"H)

HEW

't SAFEPI'BRADE P COILI CIRCUIT 8RE'AKER I

ON OPERgliK COAITROL COWS' hIAINCONTROL RAW IKL OAM 1EV I 5 IO H S U

SZ II.

CHIIO.

PRE J5URIZER HFATER5 SIHPLIFIFP CONlRDI. P/AGRAIV RartrIoo 0 1/1%/IO PACIFIC GAS AND KLECTRIC COMPANY SAN YIIANCISCO, CALIPOIINIA 0

~

1 LIICROFILM SILL OF MATERIAL.

ORAWIHO LIST SUPERSEOES SUPERSEOEO SY SHEET HO.

ill - B -15 SHEETS EV.

I

ON SITE EHERDEK'I'Ov/ER 5V5TEH 5AFDT'RAPE 4LCiKV SU5 H OTHER E5F LOAP5 i.l&KV/440V gOO KVA

~VR68 OTIICR ESF LOAN I

I

~ C)

I I

Ig~

I 4g,V 5W6IL 5U5 5ECT I3P C

405 400 I

EXETTOENCK I I

Pa5EI.

6ENEMTOP, I

.I I

I l~

L MANUAL TRAN5FKR5v/II' CONTAINII98 ELECTRICAI.

PENETRATION

~>PICAL)

I I

I I

I I

I I

NSI EQUIPMENT 5CR W I, 0

I pthQ'I.?~~'"

5PARE i o

HKATDL

>so ~'

I 5etO 3eI I

I 3tIJO I~

HEATER PNI LDC.

3e~

iP g %h'Q1 I

I IMIIoI's 559 3 I/O ~I~

I I

5igO 3o ~ r g

PI5'TR.

FutMl2 lt~ F 3gg)

I I

I AI3'Il I

I Inane

~o 5PARE LL. RDL>~ 11 41~

CONTROL MQgCg

@lilac

~ROUP~$ 5 KW 5ACX. UP REVISIONS

I 3

OH 5ITF. EIIER(IENC)'OWER 5TI5TKN 5AKll'RAPE 4I(jKV 505 5

(~cr p) kbOV 54fbR 5U5 5E{T.ISE

~A

)

25OOAMP (5~P) 4tr.xv/abov loooxvA r

~4gVouoh I

I I~

I OTIIER ESF LOAPS OTHER E5F LOAP5 IICW EOWPMENTS HAIIOAL TXl85FER 5WIIEII I

EHEIL5ENCI'OEH CILATOl 5'0'o~

~e4 PI5TIL.

PNA<A IttH4+I, >e HEATH PNLIX.

sp.g %tl 4<

I I

gt% Ittt >>5 I

I

'qrx>>t I

~I5eI/O I

I I

IW+&

I51IQ I

I

-aI I 5PAICE Ig~~'7 PHt 5FATLE I

I I

I I

I I

W W I t

MRT~

LIEF QRouPIF 4'W 5A('.K'UP HEATER PNL.UL I

I y

5>> 0 IttfNhh I

5~0 5 OH' 5e OI5TR.

~PIIFM

"'>t to I

I t

I3lI 0 3bb I

3 0

3$(o I

I I

o I 5PARE 6ROuP 0 4IBXW SA(K.N'RE.5SJRItt ER HEATERS SINGLE LINE PIA6RAH Fig. II.E.3.1-2 eiu. Or mTI.

Revision 2

~/3V'8o PACIFIC GAS AND ELECTRIC COMl ANY SAt4 rltAHCI4CO, CALlrCtlWIA e

e 1

ZI.E-17 4

(1 J

th) AYIL5t Soo hV INfS SIAIOBI-SIARIIS'RANSI HO lt I-30 4VIO/I)MVA IIIt)0 hv T ~ LVIthv4 t)0hV BUS.I SIANRF~ SIARI UP IRANSF NO II I AI AS/Io/hMVA SINIf

) )ehhv HO I 3IA.IOIA~L S hhv-JLA IOIAL Ithv SIARI.U'ttS IAAIIo I

I Qhv.

E SIARIW

)

) ILI

~)0 hV~WTO P.....

LPSOUABf RANPORM(R IRIIJ 1-3 S 31 IS/AS/$4 tS LIYA.

IHtS hV b Lvlt hvar

$1AIO Pf $)A+RJP

)RAHP+5lfR a+I I)iet4/)tko uvA.

t Hvlt hvb Lv AIIY/tAhv SoohV BUS I 4 le 44I/HNICuV IIVSOOV>/tbbShv LvtS hvd IAAIt lfALP/AIRE IINh MO'IOR NfRAI ID hfMovABLE Lelh P'----

AU11+IART RAHSI RMLR 14)I los>4/)t/)DLfk.

R HvtS hvo LV414 Y /t4 RV R

T V I

~QIRHARN

)

QHIUIRAL IRANSF MARI IRAN)fDRMEQ 10

)

)

lthv IIIS D

)

)

lthv ILIS'V 414 hv BUS 0

41) hv. BUS E

IlAWGflliR~A 1300 MVA HVISHÃlv LVIto/tlov a5 Pig 5~

hr

.4 v

DE5fl~

GfIe RAIOR~IA)I St)0RVA

)

4 IS hv.

BUS H

St ) g IAESEL DRIVfH GIIRRANII~l 3)SO hVA

)

4 ll RV BUS 0

4 4

PFP tI RfNOVA)RE LSAIS>>

fhfSff DRIVEN GINIRA10R IAII)

)tSO ilVA

)

41L hv BUS F"

BUS'O'Ih'L SIAHO:Bf

)

MIAMI-IjP tRAH'XIIIIfh "Ho@

HVlthvh LV4ROmthOI I

UHIQj I

I I

I I

I yl 4'II giL g 4 gg

-KlQk$5

~ RESISIOR

~ COIIAvelfH 1 PfHfIRAICtl

~ RIINVAILE IASCI)off)

LIHR SINGIE LINE DIAGRAM AUXILIARY POWfh SVSIEII DIABLOCAHINI NUCLEAR PLAN)

UNI1 I

k6~

4g y4 g4 C

Will 4ill V~ 9$ 9%

)A

~.=.- h~

Fig. II.E.3.1-3

1 I

1

'l80 VOLT TRANSFORHER F

looo/l333KVA AA/FA 4I60-480Y/277 VOLTS ESF bUS IP TRANSFORHER 0 IOOO/l333KVA AA/FA 4I60-480Y/277 VOLTS 480 VOLT ESF BUS 1G TRANSFORHER H

looo/1333KVA AA/FA

'il60-480Y/277 VOLTS 480 VOLT ESF BUS AH

)

)

To INSTR Ac bacK-UP TRANSF BATT.

No.

I

)

)

To N I.AC 1NVERTER I BATTERY CHARGER BATTERY BATTERY CHARGER CHARGER

~~ UNIT 2

)

) l25V DC 250y Pc )--9 Bus 2 eus

- l BATT>

Ho.

2

)

)

TO 7N.X.AC INVERTER 2

)

).

bATTERY CHARGER 32 BATTERY CHARGER 3I bATT Ho+ 3 To N+I dC To N I d INVERTER I INVERTER 3 l25V Dc Bus I

l25

)

V DC DISTR.f PANELS NOH-ESF $

J Dc NON-ESF ESF DP3 L -J 250V DC IICC ESF To 480V To 480V BUS F

euS 0 HON-ESF To 480V BUS H

l25V Dc BUS 2 V Dc

. DISTR.

PANELS 125 DISTR.

V DC, PANEls 0 PLAHT ONPUTER NON-ESF ESF IHVERTER PlANT COHPUTER INVERIER To 480V bus F

NUCLEAR IHSTR.

d COHIROL IHVERTER I HUCLEAR

INSTR, d

CONTROL INVERLER 2 NUCLEAR INSTR d

CONTROL IIYERTER 4 480-2OBY/I2OV N.I dc.

eacr-up QRANSF TURBINE D.E.H.

CONTROLLER INVERTER NUCLEAR INSTR d

CONTROL IHVERTER 3

'480V-208Y/120V INSTR. Ac eacr-up TRANSI

-'+.'.I.

dc.

DIST PANEL I H.I.dc.

DIST PANEI. 2 N.I dc.

DIST PANEL 4 480-208Y/l20V INSTR Ac TRANSF d PANEL

"+

N.I.AC.

D1ST.-PAHEL 3 4eo-2obv/I2ov INSTR Ac TRAHSF d PANEl BREAKERS IIECHANICALLY lblERLOCKED DIABLO CANYON SITE,.UNIT I SINGLE LINE DIAGRAII 480V ESF A 250/l25 OC Fig. II;E.3. 1-4

I