Text
QlY
i b80
U. S.
NUCLEAR REGULATORY COMMISSION
OFFICE
OF
INSPECTION AND ENFORCEMENT
REGION
V
Report
No.
50-275/80-11
Docket No.
License
No.
Safeguards
Group
Licensee:
Pacific Gas
and Electric Company
77 Scale Street
San Francisco,
California 94106
'I'! <<!<<!
!
!
<< lpga
--
<<!'
<<
Facility Name:
Inspection at:
Inspection
condu
ed:
Ap
Inspectors:
Tolbert Young Jr.
esident
r Inspector
Dat
Signed
gate Signed
Diablo Canyon Unit 1
Diablo Canyon Si.te,
San Luis Obispo County, California
<<!
Approved by:
Summary:
D. H. Sternberg, Chi~~c or Projects Section t
Date Signed
<<
!"VP
<<
!
Ins ection of A ril 1-25
1980
Re ort 50-275/80-11
Areas Ins ected:
Routine inspection of preoperational
testing, plant
tour, fire protection/prevention,
operator training and witnessing of
testing in progress.
This inspection involved 101 inspector<<hours
onsite by one
NRC resident inspector.
Results:
No items of noncompliance or deviations were identified.
soosos~>sg
IE:Y Form 219 (2)
0
r
l
DETAII.S
1.
Persons
Contacted
- R. D, Ramsay,
Plant Superintendent
R.
D. Etzler, Project Superintendent
N. Norem, Resident
Startup Engineer
- C. M. Seward,
Acting QA Supervisor
+J.
S.
Diamonon,
QC Supervisor
"<J. M. Gisclon,
Power Plant Engineer
- D. A. Backons,
Supervisor of Maintenance
- R. Patterson,
Supervisor of Operations
The inspector also talked with and interviewed
a number of other licensee
employees
including members of general construction,
the operations staff
and
QA personnel.
- Denotes those attending
the exit interview.
2.
Fire Protection/Prevention
The control room and the cable spreading
rooms were inspected.
The fire
alarm, extinguishing equipment,
actuating controls
and fire fighting
equipment were verified to be operable
in the cable spreading
rooms
and
25%
of the balance of the plant.
The new cable penetration
seal material
was
verified not to be flammable.
No items of noncompliance
or deviations
were identified.
3.
Plant Tour
The inspector walked through various areas of the plant on a weekly
basis
to observe activities in progress;
to inspect
the general state of
cleanliness,
housekeeping
and adherence
to fire protection rules; to check
the proper approval of "man on the line, caution and clearance"
tags
on
equipment,
and to review with operation personnel
the status of various
systems
in the plant.
The inspector noted that the status of the systems
and the housekeeping
appeared
consistent with construction activities.
The reactor cavity is
still being maintained as a clean area and extra personnel
are still assigned
to
cleanup
crews.
Cleanliness
and housekeeping
of the plant is still improving.
No items of noncompliance
or deviations
were identified.
0
-2-
4.
Operator Trainin
The operations division is continuing their intensive retraining program for
the operators
to include two weeks at the Westinghouse
simulator.
The inspector
has monitored
some of these
classes
and will monitor more
classes
throughout the training program.
No items of noncompliance or deviations
were identified.
5.
Preo erational Testin
a.
Portions of the followingtests were witnessed
by the inspector:
17.2A1
34.1
18.1A6
Reflush intake cooler pumps
Fuel transfer
system functional test
Reflush parts of firewater system
b.
While witnessing the above testing (in some tests only parts of the tests
were being performed or redone),
the inspector verified that the
procedures
were technically adequate;
the latest revt,sions
were available
and approved;
the overall crew performance
was adequate
and, in the case
of completed tests,
the acceptance criteria were met.
Administrative
controls for design change
and documentation
were .followed.
No items of noncompliance
or deviations
were identified.
6.
Administrative Procedure
AP No. Cl "Design Changes"
was
examined to determine its conformance with
the FSAR, ANSI N45.2.11-1974,
and the proposed 'technical
specifications.
No items of noncompliance or deviations
were identified.
7.
Exit Interview
The inspector met with a senior licensee
representative
on a weekly basis
and with the representatives
denoted in Paragraph
1 on April 25,
1980.
The scope
and findings of the inspection were
summarized
by the inspector.
C