ML16340A577
| ML16340A577 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/21/1979 |
| From: | Gossick L NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Lagomarsino R HOUSE OF REP. |
| Shared Package | |
| ML16340A578 | List: |
| References | |
| NUDOCS 7909280291 | |
| Download: ML16340A577 (10) | |
Text
Distr ibution Docket File NRC PDR Local PDR EDO Reading NRR Reading LWR 1 File H. Denton E.
Gase Attorney,'LD CA (3)
B. Buckley ifiImfj/jjIjL'tjIj"jj!'!!l'I",'
PUG 2 l 1979 Dear Congressman Lagoqarsfno:
I The Honorable Robert J. Lagomarsino Uqfted States House of Representatives Washington, D. C.
20515 E. Hylton J.
SECY Mail Facility(3)
(79-2208)
G. Ertter (06957)
M. Groff E.
Hughes B. floore J. Stolz
'I am pleased to respond to your July 24, 1979 referral of a letter from your constituents, Mr. and Mrs. Leroy Saruwatari.
Since rulings and decisions related to the Diablo Canyon Nuclear Power Plant could be subject to review by the Cormission, it would not be appropriate under current rules for the Commissioner to comment on your constituents'oncerns regarding Diablo Canyon at this time.
Therefore, your lettet was referred to me for reply.
Your constituents expressed concerns over the number of pounds of "white rain" and radioactive dust that would be emitted from Diablo Canyon during optimum and actual.operating conditions and what, minerals this dust would contain.
Sincerely,
~fGNT.A. Rehg While your constituents'etter.
does not specifically define "white rain,".we assume that the term refers to the precipitation of water in the areas around plants that have cooling towers'.
This precipit4tion is not radioactive
~IIxcept for possible trace amounts 'that would result from it mixing with normal hir-borne radioactive effluents from the plant.
Although Diablo Canyon, Uni'tsl ]
5 2 do not have cooling towers, we have eval.uated stations that do use I
cooling towers and have found that their impact on 'the environment from ]he "white rain" effect to be-negligible.
ln regard to the number of pounds of radioactive dust per de released:fr)m
'Diablo Canyon, we assume that your constituents were referring to the radioactive particulate that is not removed by filters and is released
- toI,
'the envir'onment.
Based on the expected gaseous effluents from both units)"
during normal plant operation, we calculate that the total release from both unfts would be less than 10 grams per year or 0.00006 pounds per day)
The increase in radiation exposure due to the operation of Diablo Canyon'nits 1
8 2 wi 11 be a very small fraction of that received from natural background radiation.
Based on actual operating experience from operating,'uclear
- reactors, we conclude that there will be no discernible radfolbgical, impact on the general public as a result of normal operation of the Dfa6lo
'anyon Station.
I trust that the above information has been 'responsive to your constitu9nts'oncerns.
'F 9092 SEE PREVIOUS YELLOW FOR CONCURRENCES*
fc5 v
~ I Ors 1Oa~
CIIRNAMa W OATa~
LWR 1
Buckley/red*
JS.to.lz."........,....
8/10/79
~ ~
~
~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ I ~
~ ~
~
~ ~ ~
~ ~ ~ v ~ ~ ~ ~ v ~
Lee V.
oss ick
""- --EXi'.ciiti v'e-OYr'ector"7
~ ~ ~
~ ~
~
~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
'1
...sj gIfig RELIC PKHf O'IS
($476) NRChK 024) 6 Uem OOVRRNMCNT mRINTINO OIvmICCI 1444 444 Se ~
"4 Qf ll P
o~-Z0~
G. Ertter (06957) f1. Groff E.
Hughes B. Moore J. Stolz Distributi Docket File NRC PDR Local PDR EDO Reading NRR. Reading LWR 1 File H.
R.
Denton E-. g.
Case
- Attorney, ELD CA (3)
B., Buckley E. Hylton
The Honora le Robert J. Lagomarsino United Stat House of Representatives Washington, D. C:
20515
()
SECY, Hail Facility (3)
Dear Congressman agomarsino:
(7g-220S)
I am pleased to resp gd to your July 24, 1979 reft.rral.,of a letter from your constituents, Nr. and ttrs. Leroy Sauruwatari.
Since rulings and decisions related to the Diablo Canyon Nuclear Power Plant could be subject to review, by the Cormission, it would not be appropriate under current rules for the Commissioner to comment on $qur constituents'oncerns regarding Diablo.
Canyon at this time.
Therefore, your letter was'eferred to me.for reply.
Your constituents expressed concerns over the number of pounds of "white rain" and radioactive dust that Gould be emitted from Diablo Canyon during optimum and actual operating condign ons and what minerals this dust would contain.
While your constituents'etter does not ecifically de'fine "white rain," we assume that the term refers to the precipi tion of water in the areas around plants that have cooling towers.
This.precipi~tation is not radioactive except for possible trace amounts that would result frog it mixing with normal air-borne radioactive effluents from the plant.
Although Diablo Canyon, Units 1
5 2 do not have cooling towers, we have evaluated stations that do use cooling towers and have found that their impact on th environment from the "white rain" effect to be negligible.
In regard to the number of pounds of radioactive dust per d y released from Diablo Canyon, we assume that your constituents were referrin+to the radioactive particulate that is not removed by filters and is released to" the environment.
Based on the expected gaseous effluents from b%th unIits~
during normal plant operation, we calculate that the total releaseyfrom both units would be less than 10 grams per year or 0.00006 pounds p~t.q day.,
The increase in radiation exposure due to the operation of Diablo Canyon,
"'nits 1
8 2 will be a very small fraction of that received from natura~l
(
background radiation.
Based on actual operating experience from opera'tiqg>>
nuclear
- reactors, we conclude that there will be no discernible radiologi'ca~1 impact on the general public as a result of normal operation of the Diably I,
Canyon Station.
I OfrICC~
C>>IRNAIICW DATN3f
~
~ ~ ~ ~ ~
~
~ ~ I
~ ~ ~ ~
~ ~ ~ ~
I WO ~ ~ ~ 0
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~
~
~
~
~ ~ ~ I ~
~ ~
~ ~
~
~
~ PORK 318 (976) NKCM 0240 Q U 4 OOVRRNINCNT fRINTINOOIIfICIII >>IT ~
444 10 ~
~
'A III
'Ef
The Honorable Robert J. Lagomarsino I trust that the above information has been responsive to your constituents'oncerns.
Sincerely, Lee V. Gossick, Executive Director for Operations EB L
e Barrett 8/~p /79 a ga i nt g)"
orrIoo~
e r
OVAIIAMCW OATS~
LWR 8IIeeckl
,J,Sto 8/ 5
~ ~
~
e e ie ~ ~ ~
~ ~ ~
0/DPI'1 DVassallo
~
~
~
~ ~e
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
S/(5/79 DD/NRR
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ e ~ e ~ ~ ~ ~ ~ ~
ECase 8/ /79
~
~ ~ ~
~ ~ ~ ~ e ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~
~
~ ~ ~ ~ ~ ~
HD on 8/ i(179
~ ~ ~
~
Ye ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~
~
~
~ e ~ ~
~
LGoss ick 8/ /79 OCA
~ ~ e e
~ ~
~ ~ ~
~ ~ ~ ~ I'
~
e ~
~ ~ ~ ~
8/ /79 lC?C POLKA 318 (9 76) NRCM 0240 5 V,I OOVICANNNNTPAINTINO OPPICIZI Ittt Nt t ~ 0
J'll I
h I
'I j)")
FROM:
R+rP>> f~s uF~
'4J c 4i4~%$ i 'Q.
TO:
C Milk'M91'C;I<gh~
ACTIONCONTROL DATES COMPI DEADLINE I +!!4 ACKNOWLEDGMENT INTERIM REPLY FINALREPLY FILE LOCATION CONTROL NO.06957 DATE OF DOCUMENT NZCPi PREPARE FOR SIGNATURE OF:
Q CHAIRMAN
[g EXECUTIVE DIRECTOR OTHER-'ESCRIPTION P LETTER P MEMO Q REPORT P OTHER K'it'~PM kt"
~~ 'J"i-I.I-"WJt ~>~
".->~~1
)"-'YQgw&C4)Vw CG$ &t$Q~'M IIk&U<<~~4M~+ 6 ~~
SPECIAL INSTRUCTIONS OR REMARKS DOCUMENT/COPY NO.
NUMBER OF PAGES POSTAL REGISTRY NO.
ASSIGNED TO:
CLASSIFIED DATA C LASS IFICATION CATEGORY P
NSI QRD Q FRD DATE INFORMATIONROUTING
.4 7 7=a,~~3 LEGALREVIEW Q. FINAL Q
COPY ASSIGNED TD:
DATE NO LEGAL OBJECTIONS NOTIFY:
COMMENTS, NOTIFY:
EXT.
JCAE NOTIFICATIONRECOMMENDED:
P YES,Q NO" NRC FORM 232 (11-75)
EXECUTIVEDIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL OO NOT RE/t/IOI/E THIS COPY
ll I'
i*'V
+
1 1I
)
I
79 -2208 Logo ng Oere ~r
~ NRC SECRETARIAT TO:
P Commissioner Xg( Exec. Dir./Oper.
CI Cong. Liaison O Public Affairs
.Date Q Gen. Counsel Q Solicitor O, Secretary fncoming:
From; ~+
ral To:
Subject:
Date Q
Prepare reply forsignature of:
Q-Chairman Q Commissioneg;
, Q EDO, GC, CL, SOL, PA, SECY Q-"Signature block omitted Q Return original of incoming with response XX)Q Fordirectreply' For appropriate action Q
For information Q
For recommendation Suspense:
Aug.
9 Sac'd Off. FOP Date.....7/>7
.~t1~
/
Time..<.....
h. t. t =rx~~ti Remarks.
For the Commission~
Send three (3) copies of reply to Secy Mail Facility NACA ACTION SLIP
A
~
%(l I r t'l
~
4 I