Report
No.
50-275 79-10
Docket
No.
50-275
U ~
S ~
NUCLEAR REGULATORY COMMISSION
OFFICE
OF INSPECTION AND ENFORCEMENT
REGION V
License
No.
CPPR-3
Safeguards
Group
Pacific Gas
and Electric Company
77 Beale Street.
San Francisco,
94106
Facility Name:
Diablo Can
on Unit
1
Inspection at'an
Luis Obispo County. California
Inspection conducted:
May 2-3 and 7,
1979
Inspectors:
H.
. North, Radiation Specialist
D te Signed
Date Signed
Approved By:
Sunmary:
H. E. Book, Chief, Fuel Facility arid Materials
Safety
Branch
Date Signed
7
D te
Si. ned
Ins ection
on
Ma
2-3 and 7,
1979
Re ort No. 50-275/79-10
A~Id:
E
g
ypl
i g.
di >>ih tfd
g
tests
and drills; radiation protection, staffing and training, instruments
and equipment;
radioactive'waste
and solid waste activity estimation.
The inspection
involved 15-1/2 inspector-hours
onsite
by one
HRC inspector.
Results:
No items of noncompliance
or deviations
were identified.
RV Form
219 (2)
e
DETAILS
1.
Persons
Contacted
a
~
Pacific Gas
and Electric
Com an
- R. Ramsay,
Plant Superintendent
- R. Patterson,
Super visor of Opera tions
=
~J. Shiffer, Technical Assistant to the Plant Superintendent
- J. Giscoln,
Power Plant Engineer
- J. Boots, Senior Chemical
and Radiation Protection
Engineer
M. O'ara,
Chemical
and Radiation Prot"ction Engineer
M. Kaefer, Senior
Power Production
Engineer
T. l1artin, Shift Foreman, Training Coordinator
B. Dettman, Security Supervisor
- J. Diamonon,
g.C. Supervisor
- H. Leppke, g.A. Supervisor
D. Miklush, Power Production
Engineer
b.
French
Hos ital and Clinic, San Luis Obis o, California
R. Danielson,
H.D., Surgeon-Coordinator
- Denotes
those present at the exit interview.
2.
Emer enc
Plannin
- Coordination with Offsite A encies
On Hay 7,, 1979, the licensee's
agreement with French Hospital to
accept possibly contaminated
patients
was confirmed by telephone.
The licensee
has coordinated
emergency
planning with the hospital
as described
in the emergency
plan.
On Hay 2, 1979, the hospital
participated in the licensee's
emergency
plan drill which included
the arrival of a simulated injured and contaminated
patient at the
hospital.
Ho items of noncompliance
or deviations
were identified.
3.
Emer enc
Plannin
- Tests
and Drills
P
On Hay 2,
1979,
the licensee
conducted
an emergency
plan drill.
The drill consisted of a series of radio messages
transmitted
from
the control
room to the San Luis Obispo County Sheriff's office as
a test of the communications
system
and to provide information to
local offsite agencies
to permit a test of the local offsite
agencies'mergency
response
plan.
This portion of the drill began
at 0800. consisted of nine messages
and terminated at 1230.
At
0900 the site emergency
signal
was
sounded
and nonessential
personnel
-2-
onsite
assembled
at designated
areas.
A single vehicle was
used to
simulate
a site evacuation.
At 1000 the San Luis Ambulance Service
was called to evacuate
a simulated
contaminated
victim from the-
site to French Hospital.
The notification concerning
the evacu-
ation of the victim included the Sheriff's office and French Hospital.
The victim was accompanied
by a member of the licensee's
radiation
protection staff.
At the conclusion of the drill, a critique was
conducted
by drill participants
and observers.
Problems identified
during the drill and discussed
at the critique included the following
items:
a.
The initial radio message
to the Sheriff's office conflicted
with the 0800 security force radio check schedule.
The licensee
confirmed receipt of the radio message
by the Sheriff's office
communications
center
by telephone.
b.
The normal radio traffic received
by the Sheriff's office
communications
center during the drill on some occasions
delayed
the transmission of messages
from the control
room.
c ~
The plant evacuation
was complete
and plant staff personnel.
were accounted for within ten minutes.
As a result of con-
fusion as to the proper handling of badges,
the accounting of
contractor
and general
construction
personnel
was not completed
f'r approximately fiftyminutes.
The actual
evacuation
occurred
in less
time but accounting for personnel
was
based
on empty
badge
board positions
and not all those individuals that
evacuated
turned in their badges
when they went to the assembly
area.
The drill was conducted
and the licensee organization
responded
in
accordance
with the licensee's
procedures.
The response
was co-
ordinated,
order ly and timely, with the exception of the personnel
accounting
problem previously noted.
The licensee
used specifically
designated
individuals; who participated in the post drill critique,
to evaluate
the licensee's
response.
It was noted that although
one of the drill messages
specifically
stated that the
HRC and California State
had
been notified,
these notifications were deliberately
not made.
No items of noncompliance or deviations
were identified.
4.
Radiation Protection - Or anization
The licensee's staff of Radiation
and Process llonitors (RPM)
now
totals nine with two other technicians
to be added in the near
future.
Eight of the RPH's
have completed training.
The three
additions to the staff will be trained
as
a group.
No items of noncompliance
or deviations
were identified.
~
~
5.
Radiation Protection - Instruments
and
E ui ment
The inspector
examined
the following licensee instt ument calibration
schedules
and procedures:
Instrument
and Controls Procedure
6.1-1
Calibration of Yictoreen
Rad
Gun
Instrument
and Controls Procedure
6.2-1
Calibration of Eberline
Rad
Owl
Instrument
and Controls Procedure
6.3-1
Calibration of Health Pllsics Instruments
1010 Serve
lister
The following Surveillance Test Procedures
were examined:
I 18Gl, Hiscellaneous
Area Honitors Functional
Test
Required. monthly on the following area monitors; RH-l, Control
Room;
RH-2, Containment;
RH-4 Charging
Pump
Room;
RH-6, Primary
Sampling
Room;
RH-7, Incore Seal
Table
Room;
RH-8,
Drumming
Station;
RH-10, Auxiliary Building Control Board.
I 18G2,
Area Nonitor Calibration
Required at
18 month intervals
on" area monitors;
1R5, Spent
Fuel
Pool Area;
1R9,
New Fuel Storage
Area.
I 18Il, Nuclear Fuel Stora
e Area Nonitors Functional
Test
Required monthly; verification of response.
to check source,
high voltage with limits, annunciator
and Fuel Handling
Building ventilation response
to higP alarm.
I 35A, Control
Room Chlorine Honitors Functional
Test
Required monthly; acceptance
requires
Node
3 operation with
loss of power to sensors,
in presence
of chlorine and instrument
fault or loss of flow.
No items of noncompliance
or deviations
were identified.
6.
Radioactive
Haste. - Solid Waste Activit Estimation
The inspector
examined
the licensee's
procedure,
not yet approved,
Rdi
i
C
1P
d
0.5.E
i 8"
f~Rdi
i!
Solid Radwaste
~Packa
es from Dose Rate Heasurements.
No items of noncompliance
or deviations
were identified.
e
'/
= V ~
(J, WJTl
~
t ssl,
4
7.
Exit Interview
The inspector
met with licensee
representatives
(denoted in Para-
graph
1) at the conclusion of the inspection
on tray 3, 1979.
The
licensee
was informed that
no items of noncompliance
had
been
identified.
The inspector
summarized
the scope
and findings of
the inspection.
t
.C