IE Insp Rept 50-275/79-10 on 790502-03 & 07.No Noncompliance Noted.Major Areas Inspected:Emergency Planning & Coordination W/Offsite Agencies,Radiation Protection, Staffing & Training & Instruments & Equipment
ML16340A495
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 05/25/1979
From: Book H, North H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML16340A496 List:
References
50-275-79-10, NUDOCS 7907260549
Download: ML16340A495 (10)


See also: IR 05000275/1979010

Text

Report

No.

50-275 79-10

Docket

No.

50-275

U ~

S ~

NUCLEAR REGULATORY COMMISSION

OFFICE

OF INSPECTION AND ENFORCEMENT

REGION V

License

No.

CPPR-3

Safeguards

Group

Pacific Gas

and Electric Company

77 Beale Street.

San Francisco,

California

94106

Facility Name:

Diablo Can

on Unit

1

Inspection at'an

Luis Obispo County. California

Inspection conducted:

May 2-3 and 7,

1979

Inspectors:

H.

. North, Radiation Specialist

D te Signed

Date Signed

Approved By:

Sunmary:

H. E. Book, Chief, Fuel Facility arid Materials

Safety

Branch

Date Signed

7

D te

Si. ned

Ins ection

on

Ma

2-3 and 7,

1979

Re ort No. 50-275/79-10

A~Id:

E

g

ypl

i g.

di >>ih tfd

g

tests

and drills; radiation protection, staffing and training, instruments

and equipment;

radioactive'waste

and solid waste activity estimation.

The inspection

involved 15-1/2 inspector-hours

onsite

by one

HRC inspector.

Results:

No items of noncompliance

or deviations

were identified.

RV Form

219 (2)

e

DETAILS

1.

Persons

Contacted

a

~

Pacific Gas

and Electric

Com an

  • R. Ramsay,

Plant Superintendent

  • R. Patterson,

Super visor of Opera tions

=

~J. Shiffer, Technical Assistant to the Plant Superintendent

  • J. Giscoln,

Power Plant Engineer

  • J. Boots, Senior Chemical

and Radiation Protection

Engineer

M. O'ara,

Chemical

and Radiation Prot"ction Engineer

M. Kaefer, Senior

Power Production

Engineer

T. l1artin, Shift Foreman, Training Coordinator

B. Dettman, Security Supervisor

  • J. Diamonon,

g.C. Supervisor

  • H. Leppke, g.A. Supervisor

D. Miklush, Power Production

Engineer

b.

French

Hos ital and Clinic, San Luis Obis o, California

R. Danielson,

H.D., Surgeon-Coordinator

  • Denotes

those present at the exit interview.

2.

Emer enc

Plannin

- Coordination with Offsite A encies

On Hay 7,, 1979, the licensee's

agreement with French Hospital to

accept possibly contaminated

patients

was confirmed by telephone.

The licensee

has coordinated

emergency

planning with the hospital

as described

in the emergency

plan.

On Hay 2, 1979, the hospital

participated in the licensee's

emergency

plan drill which included

the arrival of a simulated injured and contaminated

patient at the

hospital.

Ho items of noncompliance

or deviations

were identified.

3.

Emer enc

Plannin

- Tests

and Drills

P

On Hay 2,

1979,

the licensee

conducted

an emergency

plan drill.

The drill consisted of a series of radio messages

transmitted

from

the control

room to the San Luis Obispo County Sheriff's office as

a test of the communications

system

and to provide information to

local offsite agencies

to permit a test of the local offsite

agencies'mergency

response

plan.

This portion of the drill began

at 0800. consisted of nine messages

and terminated at 1230.

At

0900 the site emergency

signal

was

sounded

and nonessential

personnel

-2-

onsite

assembled

at designated

areas.

A single vehicle was

used to

simulate

a site evacuation.

At 1000 the San Luis Ambulance Service

was called to evacuate

a simulated

contaminated

victim from the-

site to French Hospital.

The notification concerning

the evacu-

ation of the victim included the Sheriff's office and French Hospital.

The victim was accompanied

by a member of the licensee's

radiation

protection staff.

At the conclusion of the drill, a critique was

conducted

by drill participants

and observers.

Problems identified

during the drill and discussed

at the critique included the following

items:

a.

The initial radio message

to the Sheriff's office conflicted

with the 0800 security force radio check schedule.

The licensee

confirmed receipt of the radio message

by the Sheriff's office

communications

center

by telephone.

b.

The normal radio traffic received

by the Sheriff's office

communications

center during the drill on some occasions

delayed

the transmission of messages

from the control

room.

c ~

The plant evacuation

was complete

and plant staff personnel.

were accounted for within ten minutes.

As a result of con-

fusion as to the proper handling of badges,

the accounting of

contractor

and general

construction

personnel

was not completed

f'r approximately fiftyminutes.

The actual

evacuation

occurred

in less

time but accounting for personnel

was

based

on empty

badge

board positions

and not all those individuals that

evacuated

turned in their badges

when they went to the assembly

area.

The drill was conducted

and the licensee organization

responded

in

accordance

with the licensee's

procedures.

The response

was co-

ordinated,

order ly and timely, with the exception of the personnel

accounting

problem previously noted.

The licensee

used specifically

designated

individuals; who participated in the post drill critique,

to evaluate

the licensee's

response.

It was noted that although

one of the drill messages

specifically

stated that the

HRC and California State

OES

had

been notified,

these notifications were deliberately

not made.

No items of noncompliance or deviations

were identified.

4.

Radiation Protection - Or anization

The licensee's staff of Radiation

and Process llonitors (RPM)

now

totals nine with two other technicians

to be added in the near

future.

Eight of the RPH's

have completed training.

The three

additions to the staff will be trained

as

a group.

No items of noncompliance

or deviations

were identified.

~

~

5.

Radiation Protection - Instruments

and

E ui ment

The inspector

examined

the following licensee instt ument calibration

schedules

and procedures:

Instrument

and Controls Procedure

6.1-1

Calibration of Yictoreen

Rad

Gun

Instrument

and Controls Procedure

6.2-1

Calibration of Eberline

Rad

Owl

Instrument

and Controls Procedure

6.3-1

Calibration of Health Pllsics Instruments

1010 Serve

lister

The following Surveillance Test Procedures

were examined:

I 18Gl, Hiscellaneous

Area Honitors Functional

Test

Required. monthly on the following area monitors; RH-l, Control

Room;

RH-2, Containment;

RH-4 Charging

Pump

Room;

RH-6, Primary

Sampling

Room;

RH-7, Incore Seal

Table

Room;

RH-8,

Drumming

Station;

RH-10, Auxiliary Building Control Board.

I 18G2,

Area Nonitor Calibration

Required at

18 month intervals

on" area monitors;

1R5, Spent

Fuel

Pool Area;

1R9,

New Fuel Storage

Area.

I 18Il, Nuclear Fuel Stora

e Area Nonitors Functional

Test

Required monthly; verification of response.

to check source,

high voltage with limits, annunciator

and Fuel Handling

Building ventilation response

to higP alarm.

I 35A, Control

Room Chlorine Honitors Functional

Test

Required monthly; acceptance

requires

Node

3 operation with

loss of power to sensors,

in presence

of chlorine and instrument

fault or loss of flow.

No items of noncompliance

or deviations

were identified.

6.

Radioactive

Haste. - Solid Waste Activit Estimation

The inspector

examined

the licensee's

procedure,

not yet approved,

Rdi

i

C

1P

d

0.5.E

i 8"

f~Rdi

i!

Solid Radwaste

~Packa

es from Dose Rate Heasurements.

No items of noncompliance

or deviations

were identified.

e

'/

= V ~

(J, WJTl

~

t ssl,

4

7.

Exit Interview

The inspector

met with licensee

representatives

(denoted in Para-

graph

1) at the conclusion of the inspection

on tray 3, 1979.

The

licensee

was informed that

no items of noncompliance

had

been

identified.

The inspector

summarized

the scope

and findings of

the inspection.