|
---|
Category:License-Operator
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A0162021-05-14014 May 2021 Initial License Exam Forms ES-301-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22216A1892021-05-14014 May 2021 April 2021 Proposed Scenarios 2024-09-16
[Table view] |
Text
Control Room/In-Plant Systems Outline Dresden Generating Station Date of Examination:
Form ES-301-2 08/08/2016 Exam Level: RO x SRO-I D SRO-U D Operating Test No. : 2016-301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System I JPM Title Type Code* Safety Function
- a. 211 OOO.A4.08 4.2/4.2 SBLC - Injection with Pump and RWCU Failures A, D, EN, P, S I
- b. 259002.A4.03 3.8/3.6 FW - Transfer FWLC to Main FRV during SU D, L, S 2
- c. 241000.A4.06 3.9/3.9 DEHC- Establish RPV Cooldown with Bypass Valves D,L, S 3
- d. 203000.A1 .04 3.6/3.6 LPCI - Mitigate high Suction Pressure While Lining Up CST A, D, P, S 4 Suction For Injection
- e. 223001.M.07 4.2/4.1 Containment - Vent Containment with APCV A, L, N, S 5
- f. 262001.M.01 3.4/3.7 AUX POWER - Restore Normal Feed to 28-7/29-7 from Bus D, S 6 29
- g. 215004.A4.04 3.2/3.2 SRM - Withdraw SRM Detectors with Stuck Detector
- h. 261000.A4.09 2.7/2.7 SBGT- Start SBGT with RB Vent Failure to Isolate In-Plant Systems* (3 for RO); (3 for SRO-I}; (3 or 2 for SRO-U)
A, D, L, S A, EN,M, S 7
9
- i. 295019.AA.1.02 3.3/3.1 Inst. Air - Lineup IACs to Unit 2 Instrument Air Header N, R 8
- j. 295028.EA1 .03 3.9/3.9 Containment - Bypass Drywell Cooler Trip D, E 5
- k. 201001 .A4.03 2.9/2.8 CRD - Swap CRD FCVs D, R I
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO I SRO-I / SRO-U A)ltemate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank S9/S8/S4 (E)mergency or abnormal in-plant C:::1/C:::1/C:::1 (EN)gineered safety feature c:::1 I c:::1 I c:: 1 (control room system)
(L)ow-Power I Shutdown C:::1/C:::1/C:::1 (N)ew or (M)odified from bank including 1(A) C:::2/C:::2/C:::1 (P)revious 2 exams s 3 I s 3 I s 2 (randomly selected)
(R)CA C:::1/C:::1/C:::1 (S)imulator
Control Room/In-Plant Systems Outline Dresden Generating Station Date of Examination :
Form ES-301-2 08/08/2016 Exam Level : RO D SRO-I x SRO-U D Operating Test No. : 2016-301 Control Room Systems:* 8 for RO; 7 for SRO-I ; 2 or 3 for SRO-U System I JPM Title Type Code* Safety Function
- a. 211 OOO.A4.08 4.2/4.2 SBLC - Injection with Pump and RWCU Failures A, D, EN, P, S I b.
- c. 241000.M.06 3.9/3.9 DEHC- Establish RPV Cooldown with Bypass Valves D,L,S 3
- d. 203000.A1 .04 3.6/3.6 LPCI - Mitigate high Suction Pressure While Lining Up CST A, D, P, S 4 Suction For Injection
- e. 223001 .A4.07 4.2/4.1 Containment - Vent Containment with APCV A,L, N, S 5
- f. 262001 .M .01 3.4/3.7 AUX POWER - Restore Normal Feed to 28-7/29-7 from Bus D,S 6 29
- g. 215004.M.04 3.2/3.2 SRM - Withdraw SRM Detectors with Stuck Detector
- h. 261000.M.09 2.7/2.7 SBGT - Start SBGT with RB Vent Failure to Isolate In-Plant Systems. (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
A, D,L,S A, EN, M, S 7
9
- i. 295019.AA.1.02 3.3/3.1 Inst. Air - Lineup IACs to Unit 2 Instrument Air Header N, R 8
- j. 295028.EA 1.03 3.9/3.9 Containment - Bypass Drywell Cooler Trip D,E 5
- k. 201001 .A4.03 2.9/2.8 CRD - Swap CRD FCVs D, R I
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions ; in-plant systems and functions may overlap those tested in the control room.
Criteria for RO I SRO-I / SRO-U I *Type Codes I I A)ltemate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank S9/S8/S4 (E)mergency or abnormal in-plant <!:1/<!:1/<!:1 (EN)gineered safety feature <!:1 I <!:1 I<!:: 1 (control room system)
(L)ow-Power I Shutdown <!: 1 /<!:1/<!:1 (N)ew or (M)odified from bank including 1(A) <!:2/<!:2/<!:1 (P)revious 2 exams s 3 I s 3 I s 2 (randomly selected)
(R)CA <!:1/<!:1/<!:1 (S)imulator