Category:License-Operator
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A0162021-05-14014 May 2021 Initial License Exam Forms ES-301-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22216A1892021-05-14014 May 2021 April 2021 Proposed Scenarios 2024-09-16
[Table view] |
Text
ES-301 Transient and Event Checklist Form ES-301-5 IFacility: Dresden Station Date of Exam: 8/8/16 Operating Test No.: 2016-301 I
A E Scenarios p v 1 2 3 4 T M p E 0 I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
c s A B s A B s A B s A B A
M A T L N y R T 0 R T 0 R T 0 R T 0 u T p 0 c p 0 c p 0 c p 0 c p M(*)
E R I u RO RX 2 2 2 1 1 0 D
SR0-11 NOR 1 1 1 1 1 x l/C 3,4 4,5 6 4 4 2 SRO-U 5,6 D MAJ 7,8 7, 8 4 2 2 1 TS 3,6 2 0 2 2 RO 1 RX 2 1 1 1 0 x NOR 1 1 1 1 1 SRO-I D l/C 3, 6 3,6 4 4 4 2 SRO-U MAJ 7,8 7,8 4 2 2 1 D
TS 0 0 2 2 RO RX 1 1 0 D
SRO-I NOR 1 1 1 D
SRO-U l/C SURROGATE 4 4 2 MAJ 2 2 1 D TS 0 2 2 RO RX 1 1 0 D
SRO-I NOR 1 1 1 D
SRO-U l/C 4 4 2 MAJ 2 2 1 D TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls" (ATC) and "balance-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (1/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*)Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I aoolicants in either the ATC or BOP position to best evaluate the SRO-I in manioulatina olant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Station Date of Exam: 8/8/16 Operating Test No.: 2016-301 A E Scenarios p v 1 2 3 4 T M p E 0 I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
c s A B s A B s A B s A B A
M A T L N y R T 0 R T 0 R T 0 R T 0 u T p 0 c p 0 c p 0 c p 0 c p M(*)
E R I u RO RX 2 2 2 1 1 0 D
SR0-12 NOR 1 1 1 1 1 x l/C 3,4 4,5 6 4 4 2 SRO-U 5,6 D MAJ 7,8 7,8 4 2 2 1 TS 3,6 2 0 2 2 R02 RX 2 1 1 1 0 x NOR 1 1 1 1 1 SRO-I D 1/C 3,6 3,6 4 4 4 2 SRO-U MAJ 7,8 7,8 4 2 2 1 D
TS 0 0 2 2 RO RX 1 1 0 D
SRO-I NOR 1 1 1 D
SRO-U 1/C SURROGATE 4 4 2 MAJ 2 2 1 D TS 0 2 2 RO RX 1 1 0 D
SRO-I NOR 1 1 1 D
SRO-U l/C 4 4 2 MAJ 2 2 1 D TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls" (ATC) and "balance-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (1/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*)Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I aoolicants in either the ATC or BOP oosition to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Station Date of Exam: 8/8/16 Operating Test No. : 2016-301 A E Scenarios p v 1 2 3 4 T M p E 0 I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
c s A B s A B s A B s A B A M
A T L N y R T 0 R T 0 R T 0 R T 0 u T p 0 c p 0 c p 0 c p 0 c p M(*)
E R I u RO RX 2 1 1 1 0 D
SR0-13 NOR 1 1 2 1 1 1 x l/C 3, 4 3,6 2, 6 8 4 4 2 SRO-U 5, 6 D MAJ 7,8 7, 8 7,8 6 2 2 1 TS 3,6 2 0 2 2 RX 2 2 2 1 1 0 RO 1 2 1 1 D
SR0-14 NOR 1 1 1/C 3,4 3, 4, x 3,6 9 4 4 2 5, 6 5 SRO-U MAJ 7,8 7,8 7, 8 6 2 2 1 D
SR0-15 x
SRO-U TS RX NOR 1/C 1
4,5 3,4 2
4, 5 1
2, 3 4,5 6
2 1
2 9
0 1
1 4
2 1
1 4
2 0
1 2
D MAJ 7, 8 7, 8 7, 8 6 2 2 1 TS 3, 6 2 0 2 2 RO RX 1 1 0 D
SRO-I NOR 1 1 1 D
SRO-U l/C 4 4 2 MAJ 2 2 1 D TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls" (ATC) and "balance-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (1/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*)Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulatino plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Station Date of Exam: 8/8/16 Operating Test No.: 2016-301 A E Scenarios p v 1 2 3 4 T M p E 0 I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
c s A B s A B s A B s A B A
M A T L N y R T 0 R T 0 R T 0 R T 0 u T p 0 c p 0 c p 0 c p 0 c p M(*)
E R I u RO RX 2 1 1 1 0 D
SR0-16 NOR 1 1 2 1 1 1 x l/C 3, 4 3,6 2,6 8 4 4 2 SRO-U 5,6 D MAJ 7,8 7,8 7, 8 6 2 2 1 TS 3, 6 2 0 2 2 RX 2 2 2 1 1 0 RO D
SR0-17 NOR 1 1 2 1 1 1 l/C 3, 4 3, 4, x 3,6 9 4 4 2 5,6 5 SRO-U MAJ 7, 8 7,8 7,8 6 2 2 1 D TS 3, 4 2 0 2 2 RO RX 2 1 1 1 0 D
SR0-18 NOR 1 1 2 1 1 1 x l/C 2,3 SRO-U 4, 5 4, 5 4,5 9 4 4 2 6
D MAJ 7,8 7, 8 7,8 6 2 2 1 TS 3,6 2 0 2 2 RO RX 1 1 0 D
SRO-I NOR 1 1 1 D
SRO-U l/C 4 4 2 MAJ 2 2 1 D TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls" (ATC) and "balance-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (1/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one l/C malfunction can be credited toward the two l/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*)Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.