ML16308A126

From kanterella
Jump to navigation Jump to search
Revised Emergency Plan Implementing Procedure Revision
ML16308A126
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 11/04/2016
From: Simmons P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16308A126 (2)


Text

Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 November 4,2016 10 cFR 50.4 10 CFR 50, Appendix E, Section V 10 CFR 50.54(q)(s) 10 cFR 72.4 10 cFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391 Emergency Plan Implementing Procedure Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(qX5), and 10 CFR72.44(f), the following Emergency Plan lmplementing Procedures (EPIP) have been revised as follows:

EPIP Revision 2

0037 Title Notification of Unusual Event Description of chanoe Added Appendix D to the list of QA records and corrected Title of Appendix D in Section 5.0 and Corrected procedure reference 1-AOI-42 01 to 0-AOl-42.01 Corrected procedure reference 1-AOI-42.01 to 0-AOl-42.01 Added Appendix C to the list of QA records and corrected Title of 10/03 tZO16 Appendix C in Section 5.0 Added Appendix C to the list of QA records and corrected Title of

.tl'3:i:fi:"ffi"J' :J;j'j;:',, -

1 o/o3 t2o 1 6 AOI-42.01 to 0-AOl-42.01 Effective Date 10/03 t2016 3

0042 Alert 4

0040 Site Area Emergency 0047 General Emergency 10/03 t2416

U.S. Regulatory Commission November 4,2016 Page 2 There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at(423) 365-3232.

Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant cc:

NRC Regional Administrator - Region Il NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant