ML16292A483

From kanterella
Jump to navigation Jump to search
Initial Operator Licensing Operating Test Approval-Beaver Valley Power Station, Unit 1
ML16292A483
Person / Time
Site: Beaver Valley
Issue date: 10/17/2016
From: Diane Jackson
Operations Branch I
To: Richey M
FirstEnergy Nuclear Operating Co
Jackson D
Shared Package
ML16076A416 List:
References
Download: ML16292A483 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 October 17, 2016 Mr. Marty Richey Site Vice President First Energy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077-0004

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL -

BEAVER VALLEY POWER STATION, UNIT 1

Dear Mr. Richey:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations for the operating test at the Beaver Valley Power Station, Unit 1. Please note that written examination approval will be communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) will complete its review of the operator license applications submitted in connection with this examination and will separately provide a list of approved applicants to Mr. D. Gibson, Manager Site Training. Note that any examination waivers and application denials will be addressed in separate correspondence.

The NRC approved the subject operating test in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The NRC staff will administer the operating tests during the weeks of October 31 and November 7, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity.

By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

M. Richey Please contact your Chief Examiner, Mr. David Silk at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-334 License No. DPR-66 cc: via ListServ

M. Richey Please contact your Chief Examiner, Mr. David Silk at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-334 License No. DPR-66 cc: via ListServ Distribution: (via e-mail)

DDorman, RA SShaffer, DRP CBozlinski, DRP, ROAA DLew, DRA SElkhiamy, DRP JBowen, RI, OEDO MScott, DRP DSilk, DRS RidsNrrPMBeaverValley DPelton, DRP DJackson, DRS Resource RLorson, DRS MHenrion, DRP RidsNrrDorlLpl1-2 JYerokun, DRS KCarrington, DRP Resource SKennedy, DRP JKrafty, DRP, SRI ROPreports Resource DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY17-Beaver Valley 1 Oct 31 2016 (U01922)\ExamApproval-O-Ltr.docx ADAMS PKG: ML16076A416 ADAMS ACCESSION NO.: ML16292A483 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS NAME DSilk/DS DJackson/DJ DATE 10/05/16 10/17/16 OFFICIAL RECORD COPY