ML16288A629

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 1 to Crisis Mgt Plan Implementing Procedure 5.3.2 Re Crisis News Group Plan & Rev 5 to Procedure 5.3.3 Re Administrative & Logistics Support Group
ML16288A629
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 05/02/1983
From: Tucker H
DUKE POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML16162A480 List:
References
NUDOCS 8307250730
Download: ML16288A629 (2)


Text

DuKE POWER COMPANY P.O. BOX 33189 CHARLOTTE, N.C. 28242 HAL B. TUGKER TELEPHONE VICE PRESEYRr (704) 373-4531 NUCLEAR PRODUCTION May 2, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington,,D. C. 20555

Subject:

McGuire Nuclear Station Oconee Nuclear Station Catawba Nuclear Station Docket Nos. 50-369, -370; 50-269, -270, -287; 50-413, -414

Dear Mr. Denton:

Enclosed for NRC Staff use and review are two copies of the latest revisions to the following Crisis Management Plan Implementing Procedures:

1) 5.3.2 -

Oconee Nuclear Station -

Crisis News Group Plan (Revision 1, dated March 16,, 1983)

2) 5.3.3 -

Administrative and Logistics Support Group (Revision 5, dated February 15, 1983)

These revisions are being resubmitted to ensure proper distribution and should be incorporated into your Crisis Management Plan manuals removing any earlier version pages of this plan.

Please delete privacy material in the form of personal telephone numbers prior to placing any material in the public document room, specifically:

1)Section III - Functional Responsibilities, pages 4-6, 12-13, 17, 20, 23, 24, 27 Section V Crisis News Center, Figure 4, pages 38-40 Figure 5, pages 41-42 Figure 6, pages 43-52 Figure 7, pages 53-54 Figure 8, pages 55-57 Figure 9, page 58a Figure 10, pages 59-60
2) Section B.0 -

Administrative Director, page B-31 Appendix B-1, pages B-6 and B-7 Appendix B-2, page B-10 Appendix B-7-, pages B-47 and B-48 Section H.0 -

Human Resources Director, page H-2 Appendix I-1, page 1-4 Section J.0 - Medical Support Director, page J-1 through J-3 8307250730 830719 PDR ADOCK 05000269 F

PDR

Mr: Harold R. Denton, Director May 2, 1983 Page 2 By copy of this letter, one copy of each of the above documents is being provided to the NRC, Region II.

Very truly yours, Hal B. Tucker WHM/php Enclosures cc:

(w/l copy of enclosure)

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 (w/o enclosure)

Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station Mr. J. C. Bryant NRC Resident Inspector Oconee Nuclear Station

  • ~r*,.-

~

j-7