ML16286A056

From kanterella
Jump to navigation Jump to search

LACBWR Ltp and Site Release Public Meeting Slides
ML16286A056
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 10/17/2016
From: Vaaler M
Reactor Decommissioning Branch
To: Bruce Watson
Reactor Decommissioning Branch
Shared Package
ML16286A049 List:
References
Download: ML16286A056 (23)


Text

LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN PARTIAL SITE RELEASE September 20, 2016 Public Meeting 1

Welcome

  • Meeting Agenda
  • Meeting Facilitation and Protocol
  • NRC Speakers and Experts
  • Public Comments, Questions, and Answers
  • Meeting Feedback Forms (hard copies available)
  • Adjourn at 8 PM 2

Meeting Agenda

  • WELCOME AND PURPOSE OF MEETING
  • NRC MISSION

- Bruce Watson, CHP, Chief, Reactor Decommissioning Branch, NRC

  • LA CROSSE LICENSE TERMINATION PLAN

- Gerry VanNoordennen, LaCrosseSolutions

  • NRC REGULATORY PROCESS

- Marlayna Vaaler, Project Manager, NRC

  • NRC INSPECTION AND OVERSIGHT PROGRAM

- Marlayna Vaaler, Project Manager, NRC

  • PARTIAL SITE RELEASE REQUEST

- Marlayna Vaaler, Project Manager, NRC

  • PUBLIC COMMENTS
  • CLOSING REMARKS 3

NRC Mission

  • The NRCs mission is to ensure safety, and to be protective of public health and the environment whether the site is operating, or transitioning from operation to decommissioning, and through the entire decommissioning process until the site has been radiologically decommissioned and the license is terminated.

4

Decommissioning (10 CFR 20, Subpart E)

  • To remove (as a facility) safely from service and reduce radioactivity to a level that permits:
  • Release of the property for unrestricted use and termination of the license
  • Unrestricted Release Criteria
  • Total Effective Dose Equivalent (TEDE) 25 mrem (0.25 mSv/a) and As Low As is Reasonably Achievable (ALARA)
  • Average member of the critical group
  • All pathways
  • Period of performance - 1000 years 5

6 US NRC Decommissioned Facilities 7

Many Versions of Final Site Status After Decommissioning Connecticut Yankee, CT Maine Yankee, ME Trojan, OR San Onofre Unit 1, CA

  • Gerry VanNoordennen
  • La Crosse Solutions
  • Ongoing License Termination Activities at the La Crosse Site
  • Final Site Status 9
  • Marlayna Vaaler
  • NRC Project Manager for La Crosse

Contact:

- Phone: 301-415-3178

- Email: marlayna.vaaler@nrc.gov 10

License Termination Plan

  • The License Termination Plan Includes:

- Site Characterization

- Identification of Remaining Dismantlement Activities

- Plans for Site Remediation

- Plans for the Final Radiation Survey

- Description of the End Use of the Site if Restrictions are Imposed

- Updated Site-Specific Cost Estimate of Remaining Costs

- Any Information to Supplement the Environmental Report 11

La Crosse LTP Availability

  • The La Crosse LTP is available for public viewing through the NRCs Agencywide Documents Access and Management System (ADAMS) at accession [reference] number ML16200A095.
  • Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC Reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov.
  • Please note that the La Crosse LTP consists of eight chapters covering the topics noted on the previous slide.

12

NRC Review of the LTP

  • Technical Review
  • Request Additional Information as Necessary
  • Public Meeting / Opportunity for a Hearing
  • NRC Approves the LTP by License Amendment
  • NRC Performs In-process Inspections 13

License Termination

  • Licensee Submits Final Status Survey Report (FSSR)
  • NRC Reviews and Approves the FSSR
  • NRC Will Perform Confirmatory Surveys
  • The License is Terminated if the License Termination Plan Was Followed and the Site Meets the Release Criteria
  • Estimated Date of La Crosse License Termination is 2019 14

Inspector ENGAGEMENT with Focus on SAFETY and SECURITY Well Established Maintain Boots on the Ground Communication with Inspection Program Stakeholders 15

Decommissioning Inspection Program

  • Fuel
  • License Removed
  • Oversight Termination from Vessel
  • Verification Enter Program End Program 16

Comprehensive Inspections Radiation Security Protection Operations and Fuel Safety Maintenance Core and Discretionary Inspections 17

Spent Fuel Inspection Program

  • Process is outlined in Inspection Manual Chapter 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations Fuel Loading
  • Pre-Use and Ends
  • Routine Construction
  • Routine Monitoring Inspection Loading Inspection Inspection Fuel Loading Waste Begins Removed 18

La Crosse Partial Site Release

  • Request was submitted on June 27, 2016
  • Proposed action would remove and release the portions of the site which have been classified as radiologically non-impacted from La Crosses previous operation
  • Approximately 88 of the 165 acres of the site would be released, including components of the Genoa Generating Station coal-fired power plant, which remains operational
  • Estimated date of release is March 2017 19

Partial Site Release

  • The Partial Site Release Includes:

- The results of evaluations performed to determine the effect of releasing the property, including dose to the public, effluent release, and environmental monitoring

- A description of the land to be released

- A schedule for release of the property

- Results of the 10 CFR 50.59, Changes, tests, and experiments, evaluation performed

- Environmental impact conclusions 20

La Crosse Site Areas Proposed for Release 21

NRC Contact Information

  • NRC HQ Main Number: (800) 368-5642 or (301) 415-7000
  • NRC RIII Main Number: (630) 522-3025
  • NRC Public Web Site: www.nrc.gov
  • NRC Document Access System:

http://www.nrc.gov/reading-rm/adams.html 22

Comments and Questions from Members of the Public 23