0911912016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Power Reactor Event# 52248 Site: MCGUIRE Notification Date I Time: 09/19/2016 12:21 (EDT)

Unit: 1 2 Region: 2 State: NC Event Date I Time: 09/19/2016 12:05 (EDT)

Reactor Type: [1] W-4-LP,[2] W-4-LP Last Modification: 09/19/2016 Containment Type: ICE COND ICE COND NRC Notified by: TONY COOK Notifications: SHAKUR WALKER R2DO HQ Ops Officer: STEVE SANDIN PART 21/50.55 REACTOREMAIL Emergency Class: NON EMERGENCY 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE Unit Scram Code RX Crit lnit Power Initial RX Mode Curr Power Current RX Mode 1 N Yes 100 Power Operation 100 Power Operation 2 N Yes 100 Power Operation 100 Power Operation 10 CFR PART 21 NOTIFICATION - JOSLYN CLARK OVERLOAD HEATER ELEMENT PART NUMBER 2455 "This is a non-emergency facsimile notification required by 10 CPR 21.21 (d)(3)(i). A written notification in accordance with 10 CFR 21.21 (d)(3)(ii) will be provided within 30 days.

"Duke Energy McGuire Nuclear Station (McGuire) has determined there is evidence of a departure from technical requirements, a Deviation, associated with Joslyn Clark overload heater element Part Number (PIN) 2455. This part was procured in accordance with the Duke Energy Commercial Grade Program (CGP) and dedicated for use in safety related applications. Three of 18 overload heater elements, purchased as a lot, had insufficient top weld material. One failed in-service during a post maintenance test, the second and third failed during a visual and mechanical inspection. An extent of condition review inspected over 500 similar J~slyn Clark overload heater elements. No other inventory was found with a top weld issue.

"These overload heater elements are used in motor starters for the Emergency Diesel Generator (EDG) ventilation fans. This condition was discovered during post maintenance testing of the 2A EOG on July 27, 2016. None of the suspect overload heater elements were installed in Operable EOG ventilation fan motor starters. The dedicated overload heater elements, from this lot, were not transferred or sold to any third party customers. Specialty Product Technologies, manufacturer of the Joslyn Clark overload heater elements, has been notified of the deviation and is investigating their welding process.

"The Evaluation of the deviation determined that a Substantial Safety Hazard would have been created if the overload heater elements were installed and left uncorrected.

'.'The NRC Senior Resident Inspector has been notified."

09-19-16;11:36 ;From: To:NRC Operations # 1I 5 NRC IMMEDIATE NOTIFICATION REQUIREMENTS RP/O/N5700/01 a Rev. 030 Page 25 of 38 AITACHMENT 2 Page 1of4

<< NRC Event Notification Worksheet >>

SIA'J'E: "THIS IS THE McGUIRE: NUCLEAR SffE IN NRC REGION 2 MAKING AN 6.VENr NOT1FlCAT10N REPORT" NOT1FICA110N TIME/OA l"l."Z.I re 'j ),

<::J ru~

EVENT TlME &!ONE UNIT If~ /;,Ny_ Co~

CALL.ER'S NAMe I

  • POW~ODE BEFORE CALLBACK TELEPHONE#:

ENS cir 1*8BS.27Q.0173 (70~). 87~044 NRC OPeRATIONS

~$~co~~~' p.)

E'JENT 'ER/MOOE A~ER.

OAT ill /{}!) 01) //)tJ

?ZtJ.J Region II

- (tlrlll!l (zone~ 1/1q/11o

. \

fi4obe

.} ./1b/)e- I EVENT C\.ASS1i:1c,o.nONS 1*Hr Non-Emeraem:v B--Hr Non.E;rneraenC'I 10CFR !l0.72(bl~

GENERAL~MERGENCY [50. 7Z(b)(1 )(a)J TS Oell1$UQO (1~,75(C)(l}l SJlllnl Fuol StQragct SSC d!lfllet.

SITE AF!~ EMERGE:NCY [72.75(¢)(~)1 Sp~nt Fuel Slorag(I deared;itfoo.

AU:RT 170.521 (a) ana (b) Aci;:idantal Criticality J;12. 75(c)(3)) Fuol Slota.go rotated off:ll!o medli:a~

!lr

[73,71) (a)(1ll L.oss or rncovery or :iny shipment ol SNM or spent fuel 173.771a\ll\I CvbQr Attai;k UNUSUAL EVENT ISO. 72(b){3)(xll)l Offslto Medical TRANSP0Rl'Pil'ION (10 +Hr NGn-5mergenq [~O. 72(b)(3)(U)(All Oeg!'<lded Condition CP'R 20l MAiEFUAUEXPOSURE [SO. 72(b)(2)(1)1 TS Required S/O (SO. 74(b)(:3)(fi)(6)1 Unal'la!yzed Condition 110 CFR201 OIHER Ill q:;p, J./, 2 /

- l50.72(bl(2l(M(All E:CCS 01acllarge to [50. 72(b)(3)(iv)(A}] Valid Actuation of I\ RCS System ll!sted In

-- [!iO. 72(b)(2)(1V)(B)) RPS ActuallDn clitli;.alscram a [50.72(b)(3)(v)(A)]

Attachment 3 Sare S/O C~pabillty (50. 72(b)(2)(lCl)) Olfslte Noll!leatlcn r50.72/blC:Jl<vlcEm RHR Cm:mbllltv

{72.75(b)(1)] ()aviation fmm l~SI T.S. IS0.72lblC3lMfC\1 Control of Rad Rcloa~e

[70.SO(a\l SlllM Pro!octl11e actlonlsl 50.721b\l31Mt011 Acc:ldont MltlaaUon PHYSICAL SECURITY ('73,71) 50.72(blt3\Mlll1 Lost ENS 173.77(a){2)(111 Cyber Attack 50. 72Cb)(3lCxllill Lest Other Assoss./Conima l't'.'f. 77Cal<2lrlll1 Cvl:Jer Anack 150.721bll3llxllll\ emeraeric:v Siren INOP

{73. 77(a)(2)(Hl)l Cyber Offulte \)'3.n(a)(3) Cybel' SuspiCIOU5 Ac~lvity Communi~tlon Z4-Hr. Ncn-e::rnotaonGV Materi31JExcosure l10CFR20\

l72.75l(d\(111 i=uel Slorniie eaulDmerit fallute.

173 A.co GI safeguards 11ulncrabllltles (26.719} Slol'lilleant e11enb ln\lolvln9 fitneas fer dutv.

r7o.50lbll1ll Contaminatlcm event rasttlctlons.

170.SO(bl!2ll ~quioment 1alluri:i 170.501bll3\1 Uncl:;111ned medleal troalment

[70.SO(b)(4)J Flre/exploslon damago to llc:onsaef material I

1SF1 Certificate of ComoUance

...............:........................--*-***-***-****----------------------~~---*

09-19116;11:36 ;From: To:NRC Operations ; # 2/ 5

.J NRC IMMEDIATE NOTIFICATION REQUIREMENTS RP/0/A/5700/010 Rev. 030

?age 26of 38 ATTACHMENT 2 Page 2. of 4

<< NRC Event Notification Work:sheet >>

eveNr OESCRIPTION ln~lud*: Systems affec:led. ~etuauon~ & lheit lnitfattn11 $lgnals, ca1Jses, eftltcl or event 011 plant, actlona takao or plannad, etc.

Cantlnu* an Att3chmant 2 paQe 2 of 3 If n11ce~ry.

YES Cl NO NRC fl£SIOENT Ex lalnabcva OIOALL NO C SYSTEMS FUNCTION AS i -........----+---t----,,,._--t REQUIRl!O LOCAL EST. AOOITIONAL INFOR. ON BACK

!lES"f'ART A?PAOVEO BY: TIME/OATE: &yy

09-19-16;11:36 ;From: To:NRC Operations # 31 5 NRC IMMEDIATE NOTl~ICATION REQUIREMENTS RP/O/A/5700/010 Rev, 030 Page 27of38 ATTACHMENT 2 Page 3of4

<< NRC Event N<ltificatian Worksheet >>

RAO!Ol.OGICAL RELCASES: CfUECK OR FILL IN APPLICA6LE trEMS (~peci c ctrstail5/explanatlans should be coveract in evi!!nt descrlptiQn)

LIQUIO RELEASE GASEOUS RELEA.Se UNPLANNED RELEASE PlANNS> RELEASE: ONGOING ERMINAiED MONITORED UNMONITORED oi:i:s1re RELEASE .s. E:XCEEOEO RM REAS EVACUATeD LARMS

!.EJhe natlfk.allon 15 duo Mitt tl'llll information is .W2I a11aU11bht, nmtt rn*i'lt 'Not Availablo' and c:omplote the notifle<1tlon.

Total AcU,,ity (Cl)

Nobllll .Oas lcdlM 0.01 Cl P~c:ulate 1 mCI Llquld (oxcludin11 0.1 Cl tritium & dlsso111ed nolllo ga:ies)

Liquid (triHum) SCI RAO MONITOR READINGS:

lARM S6TPOINTS: TRIP 11 LOCATION OF THE LEAK (&.Q. #, vaive, i:il~e. ere,):

LEAK RATS: gpm/gpd .s. LIMITS ~CEc!JcO: SUDO!:N OR LONG TERM OEVELOPMfNT:

LEAK START OATE: TIMS.: OOLANl' ACTNITY: PRIMARY ScCONOAR'r' Lallt Sample) Xe eq. _ _mCl/ml Xoeq._mCl/ml Iodine eq. _ _mCllnd Iodine Qll,~mCl/1111 LIST OF SAFcTY RELATED EQUIPMENT fil}I OPERATIONAL;

09-19-16;11:36 ;From: To:NRC Operations # 4/ 5 NRC IMMEDIATE NOTIFICAilON REQUIREMENTS RP/O/A/5700/01 O Rev.030 Page 28 of 38 ATTACHMENT 2 Page 4of 4

<< NRC Event Notification Worksheet>>

EVENT DESCRIPTION (Continued fltlm Attachment Z 1"1!18 I of 3)

\

09-19-16; 11: 36  ; From: To:NRC Operations # 5/ 5 10 CFR PART 21 NOTIFICATION - JOSLYN CLARK OVERLOAD HEATER ELEMENT PART NUMBER 2455 This is a non-emergency facsimile notification required by 10 CFR 21.2l(d)(3)(i). A written notification in accordance with 10 CFR 21.21(d)(3)(ii) will be provided within 30 days.

Duke Energy McGuire Nuclear Station (McGuire) has detennined there is evidence of a departure from technical requirements, a Deviation, associated with Joslyn Clark overload heater element Part Number (PIN) 2455. This part was procured in accordance with the Duke Energy Commercial Grade Program (CGP) and dedicated for use in safety related applications. Three of 18 overload heater elements, purchased as a lot, had insufficient top weld material. One failed inservice during a post maintenance test, the second and third failed during a visual and mechanical inspection. An extent of condition review inspected over 500 similar Joslyn Clark overload heater elements. No other jnventory was found with a top weld issue.

These overload heater elements are used in motor starters for the Emergency Diesel Generator (EDG) ventilation fans. This condition was discovered during post maintenance testing of the 2A EDG on July 27, 2016. None of the suspect overload heater elements were installed in Operable EDG ventilation fan motor starters. The dedicated overload heater elements, from this lot, were not transferred or sold to any third party customers. Specialty Product Technologies~

manufacturer of the Joslyn Clark overload heater elements, has been notified of the deviation and is investigating their welding process.

TI1e Evaluation of the deviation determined that a Substantial Safety Hazard would have been created if the overload heater elements were installed and left uncorrected.

(

The NRC Senior Resident Inspector has been notified.