ML16265A039

From kanterella
Jump to navigation Jump to search
and ISFSI - Submittal of 10 CFR 72.48 Summary Report for 09/24/2014 - 09/16/2016
ML16265A039
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 09/15/2016
From: Capps S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML16265A039 (2)


Text

Steven D. Capps e(~DUKE Vice President McGuire Nuclear Station

~ ENERGY Duke Energy MGOIVP I 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 1: 980.875.4809 Steven.Capps@duke-energy.com 10 CFR 72.4 September 15, 2016 Serial: MNS16-054 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 72-38, 50-369, 50-370 Renewed License Nos. NPF-9 and NPF-17

SUBJECT:

Independent Spent Fuel Storage Installation (ISFSI) 10 CFR 72.48 Summary Report In accordance with 10 CFR 72.48 (d)(2), this report is being submitted to inform the Nuclear Regulatory Commission (NRC) that during the period from September 24, 2014, through September 16, 2016, there were no changes, tests or experiments associated with the McGuire Nuclear Station (MNS) ISFSI that required a 72.48 evaluation.

Therefore, no summaries are included as an attachment to this letter. The MNS ISFSI consists of TRANSNUCLEAR TN-32-A, NAC-UMS and NAC-MAGNASTOR dry storage casks.

This submittal contains no regulatory commitments.

If there are any questions or if additional information is needed, please contact Mr. G. M. Murphy at 980-875-5715.

Sincerely,

~~fo,,.

Steven D. Capps

U.S. Nuclear Regulatory Commission September 15, 2016 Page 2 xc:

C. Haney, Region II Administrator

  • U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 G.E. Miller, Project Manager Ed.Miller@nrc.gov V. Sreenivas, Interim Project Manager V.Sreenivas@nrc.gov A. Hutto NRC Senior Resident Inspector McGuire Nuclear Station