ML16256A738

From kanterella
Jump to navigation Jump to search
Advises That 850430 Rev 15 to Util Crisis Mgt Plan Meets 10CFR50.47(b) Planning Stds & 10CFR50,App E Requirements
ML16256A738
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 07/11/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8508070612
Download: ML16256A738 (1)


Text

JUL I i9B Duke Power Company ATTN:

Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

DUKE POWER COMPANY - CRISIS MANAGEMENT PLAN REVIEW We have completed our review of revision 15 of the Duke Power Crisis Management Plan dated April 30, 1985.

Our review indicated that your Crisis Management Plan continues to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan.

However, if your safety review indicates no decrease in emergency preparedness, the changes can be made without NRC approval.

In all cases, you should furnish copies of each change to the NRC in accordance with 10 CFR 50.54(q).

Also any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V (Implementing Procedures).

Should you have any questions regarding this letter, please contact Ms. M. Poston-Brown at (404) 221-4717.

Sincerely, Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects cc:

T. L. McConnell Station Manager McGuire M. Tuckman, Station Manager Oconee R. L. Dick, Vice President Construction -

Catawba J. W. Hampton, Station Manager Catawba bcc: NRC Resident Inspectors Document Control Desk State of South Carolina State of North Carolina MPO'4 Brown:es "i

lins JP o r

/85

/85 6

/8 8508070612 850711 PDR ADOCK 05000269 F

PDR