ML16256A690

From kanterella
Jump to navigation Jump to search
Notifies That Liquid Samples Spiked W/Radionuclides Will Be Sent to Facilities for Radiochemical Analyses,Per NRC Confirmatory Measurements Program.Analyses Should Be Completed within 60 Days from Receipt of Samples
ML16256A690
Person / Time
Site: Oconee, Mcguire, McGuire, 05000000
Issue date: 04/05/1984
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8405070018
Download: ML16256A690 (2)


Text

05 1984 Duke Power Company ATTN:

Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

DOCKET NOS. 50-369, 50-370, 50-269, 50-270 AND 50-287 As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be sent to the McGuire and Oconee facilities for radiochemical analyses.

These samples are to be analyzed for tritium, strontium-89, and strontium-90 in accordance with your approved procedures for analysis of liquid waste samples. The McGuire facility will also receive an iron-55 spiked sample for analysis.

If routine analyses of this type are normally performed by a vendor, this vendor should be used to analyze the spiked samples.

The spiked samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory within approxi mately thirty days.

We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of'the samples.

Results should be sent to: U. S.

Nuclear Regulatory Commissioi, Region II, Attn:

Dr. D. M. Montgomery.

Our evaluation of your results will be discussed with your staff and documented in our next inspection report for this area. Spiked samples will be sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact Dr. Montgomery by telephone at 404-221-5596.

Sincerely, (Original signed by DMVerrelli)

Richard C. Lewis, Director Division of Project and Resident Programs cc: M. D. McIntosh, Plant Manager C. F. York, Division Manager J. Ed Smith Station Manager W. F. Byrun, Radioanalysis Supervisor L. D. Robinson, Health Physics Supervisor, Counting Room bcc:

(See page 2) 8405070016 840405 PDR ADOCK 05000269 G

PDR 610

Duke Power Company 2

05 1984 bcc:

Document Control Desk Resident Inspector RII RI RH I

EWWorkman:es DMMon'tgomery AFGibson 1shinski 3/3/84 t 1 /84 4Ik

/84 7,/84