Forwards Draft Ltr to All Licensees Re Diesel Generator Fuel Oil QA Requirements
ML16245A471
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/11/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 7912190776
Download: ML16245A471 (3)


Text

MBE Distribution:

cNRR Rdg.

NRC. PDR ORB#4 Rdg.

L PDR Memo file TEAA.

Schwencer

' ~:>K Docket No. 50-269 TERA JRBuchanan, NSIC T. Ippolito MEMORANDUM FOR: Norman E. MoseldDirector D. Ziemann Division of Reactor Operation Inspection, OE FROM:

Darrell G. Elsenhut, Acting Director Division of Operating Reactors

SUBJECT:

ANO-1 QUALITY ASSURANCE REQUIREMENTS REGARDING DIESEL GENERATOR FUEL OIL By memorandum, Sniezek to Ziemann, dated March 12, 1976, DOR was requested to advise Arkansas Power and Light Company that diesel generator fuel oil and coolant chemicals be controlled by the QA program at Arkansas Nuclear One, Unit No. 1.

'By memorandum, Davis to Sniezek, dated May 5, 1977, it.

was indicated that Technical Specifications assure the maintenance of required 'safety margins with regard to primary chemicals and that'thecse of secondary chemicals is under continuing review. However, the gdestion concerning diesel gen erator fuel oil was left open until issuance of Regulatory Guide 1.137,'

"Fuel Oil Systems for Standby7-Diesel Generators".

Since the issue of diesel generator fuel oil may be applicable to other plants, we Wifl isuej'the attached letter,'which is self explanatory, oall lice!.

ided we receive no response fromAP&L on t s

s er'drthis issue closed.___

.ql!iina3 Signed Rr Darrell G. Eisenhut, Acting Director Division of Operating Reactors Attachment.

cc: W. GammiI1 T. J. Carter L. Shao-W. Russell J. R. Miller 'R.

Reid R. Vollmer G. Vissing B. Grimes R. Ingram.

0 ORB#3:D T. Ippolito 11-/p/79 OFFICE

.ORA4 DOR..

AA OR D:.

0...00R...

0R'#2,DOR..R SURNAM

.Eisen t.

Ziem nn DATE ~

,/79

[711/

79 11/ /79 V 0/79

//11/./79 1/

NRC FORM 318 (9-76) NRCM 0240 U.S. GOVERNMENT PRINTING OFFICE: 1979 289-369 0 7 67

UNITED STATES NUCLEAR REGULATORY COMMISSION 0

WASHINGTON, D. C. 20555 December 11, 1979 Docket No. 50-269 MEMORANDUM FOR: Norman E. Moseley, Director Division of Reactor Operation Inspection, DIE FROM:

Darrell G. Eisenhut, Acting Director Division of Operating Reactors

SUBJECT:

ANO-1 QUALITY ASSURANCE REQUIREMENTS REGARDING DIESEL GENERATOR FUEL OIL By memorandum, Sniezek to Ziemann, dated March 12, 1976, DOR was requested to advise Arkansas Power and Light Company that diesel generator fuel oil and coolant chemicals be controlled by the QA program at Arkansas Nuclear One, Unit No. 1.

By memorandum, Davis to Sniezek, dated May 5, 1977, it was indicated that Technical Specifications assure the maintenance of required safety margins with regard to primary chemicals ana that the case of secondary chemicals is under continuing review. However, the question concerning diesel gen erator fuel oil was left open until issuance of Regulatory Guide 1.137, "Fuel Oil Systems for Standby Diesel Generators".

Since the issue of diesel generator fuel oil may be applicable to other plants, we will issue the attached 1 tter, which is self explanatory, to all licensees. Provided we receiv% no respons'e from AP&L on this letter, we consider this issue closed.\\

\\aB

'e fY1./Eisen ut, Acting Director Division of Operating Reactors Attachment cc: W. Gammill T. J. Carter L. Shao W. Russell J. R. Miller R. Reid R. Vollmer G. Vissing B. Grimes R. Ingram

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 (Sample Letter)

ALL POWER REACTOR LICENSEES EXCEPT OCONEE RE:

QUALITY ASSURANCE REQUIREMENTS REGARDING DIESEL GENERATOR FUEL OIL A review of Arkansas Nuclear One found that diesel generator fuel oil was not on the Q list for Arkansas Nuclear One, Units Nos. 1 and 2 (ANO-1/2).

This indicated that diesel generator fuel oil was not included in the ANO-1/2 Quality Assurance Programs. This also brought into question whether diesel generator fuel oil was included in the quality assurance plans of other operating plants.

A-pendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants" to 10 CFR Part 50 establishes overall quality assurance requirements for design, construction, and operation of structures, systems and components important to safety.

Consumable items where quality is necessary for functional performance of safety related components shall also be classified as safety related and thus subject to applicable provisions of Appendix B to 10 CFR Part 50.

Regulatory Guide 1.137, "Fuel Oil Systems for Standby Diesel Generators" describes a method acceptable to the NRC staff for complying with the Commission's regulatipns regarding fuel oil systems for standby diesel generators and assurance of adequate fuel oil quality.

You are requested to review your Quality Assurance Program with regard to diesel generator fuel oil.

If you do not include diesel generator fuel ol in your Quality Assurance Program we request you include it within 90 days of receipt of this letter.

However, if you take exception to this position and do not comply, we request a response within 90 days of receipt of this letter which provides justification for your not complying with our position.

Darrell G.iEisenhlit, A't ing Director Division of Operating Reactors