Summary of 791024 Meeting W/B&W Owners Group Re Asymmetric LOCA Loads Evaluation.Evaluation of B&W Plants to Be Completed by Jul 1980
ML16245A466
Person / Time
Site: Davis Besse, Oconee, Arkansas Nuclear, Crystal River, Rancho Seco, Crane  Duke Energy icon.png
Issue date: 11/20/1979
From: Hosford S
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 7912120092
Download: ML16245A466 (4)


Text

I Meeting Summary

- 3 Babcock & Wilcox WOVEMBER 2 0 1979 cc: H. Denton E. Case D. Eisenhut R. Tedesco F. Schroeder B. Grimes R. Vollmer W. Gammill J. Miller J. Knight V. Noonan P. Check G. Lainas D. Crutchfield A. Schwencer D. Ziemann T. Ippolito R. Reid R. Bosnak Z. Rosztoczy K. Kniel W. Butler R. Fraley, ACRS(16)

OI&E (2)

OELD NRC Staff Participants J. R. Buchanan TERA

P' REG(J UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 NOVEMBER 2 01979 Docket Nos. 50-313, 50-302, 50-312, 50-289, 50-346 and 50-269/270/287 MEMORANDUM FOR:

Darrell G. Eisenhut, Acting Director Division of Operating.Reactors FROM:

S. B. Hosford, Technical Assistant for Engineering Programs, DOR THRU:

Larry C. Shao, Acting Assistant Director for Engineering Programs, DOR

SUBJECT:

SUMMARY

OF MEETING WITH THE BABCOCK AND WILCOX OWNERS GROUP OCTOBER 24, 1979, ON ASYMMETRIC LOCA LOADS The Babcock and Wilcox Owners Group met with the staff on October 24, 1979, to present their progress and schedule for resolution of the Asymmetric LOCA Loads Evaluation. The B&W Owners project that the evaluation for all B&W plants will not be complete until July 1980.

The staff has reviewed the B&W Owners progress to date and their projected schedule. The staff recommends that the following stipulations be met by each licensee.

1. A report should be submitted on each plant docket on or before February 15, 1980, This is consistant with the two year requirement,from receipt of our letterto licensees(January 25, 1978).
2. This report should include as a minimum the following: evaluation of the reactor vessel supports; evaluation of the component supports; evaluation of the attached ECCS piping; and a statement addressing justification for continued operation pending completion of the required evaluation.

1912120

Meeting Summary 2 -

NOVEMBER U 1979 Babcock & Wilcox

3. The final report including the completed evaluation for each plant should be submitted on the docket no later than July 1, 1980.

S. B. Hosford, Technical Assistant for Engineering Programs Division of Operating Reactors

Enclosure:

List of Attendees cc w/encl:

See next page

Enclosure LIST OF ATTENDEES BABCOCK & WILCOX OWNERS GROUP MEETING OCTOBER 24, 1979 NRC S. B. Hosford K. Wichman T. H. Liu Babcock & Wilcox W. R. Speight R. E. Ham D. L. Howell EDS Nuclear G. C. Slagis TECo J. K. Wood Arkansas Power & Light D. G. Mardis GPU Service Corp L. Lanese SMUD B. Dieterich Florida Power J. V. Vattamattam CPCO J. J. Zabritski IVoVEMOER 2 0 1979