I Meeting Summary
- 3 Babcock & Wilcox WOVEMBER 2 0 1979 cc: H. Denton E. Case D. Eisenhut R. Tedesco F. Schroeder B. Grimes R. Vollmer W. Gammill J. Miller J. Knight V. Noonan P. Check G. Lainas D. Crutchfield A. Schwencer D. Ziemann T. Ippolito R. Reid R. Bosnak Z. Rosztoczy K. Kniel W. Butler R. Fraley, ACRS(16)
OI&E (2)
OELD NRC Staff Participants J. R. Buchanan TERA
P' REG(J UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 NOVEMBER 2 01979 Docket Nos. 50-313, 50-302, 50-312, 50-289, 50-346 and 50-269/270/287 MEMORANDUM FOR:
Darrell G. Eisenhut, Acting Director Division of Operating.Reactors FROM:
S. B. Hosford, Technical Assistant for Engineering Programs, DOR THRU:
Larry C. Shao, Acting Assistant Director for Engineering Programs, DOR
SUBJECT:
SUMMARY
OF MEETING WITH THE BABCOCK AND WILCOX OWNERS GROUP OCTOBER 24, 1979, ON ASYMMETRIC LOCA LOADS The Babcock and Wilcox Owners Group met with the staff on October 24, 1979, to present their progress and schedule for resolution of the Asymmetric LOCA Loads Evaluation. The B&W Owners project that the evaluation for all B&W plants will not be complete until July 1980.
The staff has reviewed the B&W Owners progress to date and their projected schedule. The staff recommends that the following stipulations be met by each licensee.
- 1. A report should be submitted on each plant docket on or before February 15, 1980, This is consistant with the two year requirement,from receipt of our letterto licensees(January 25, 1978).
- 2. This report should include as a minimum the following: evaluation of the reactor vessel supports; evaluation of the component supports; evaluation of the attached ECCS piping; and a statement addressing justification for continued operation pending completion of the required evaluation.
1912120
Meeting Summary 2 -
NOVEMBER U 1979 Babcock & Wilcox
- 3. The final report including the completed evaluation for each plant should be submitted on the docket no later than July 1, 1980.
S. B. Hosford, Technical Assistant for Engineering Programs Division of Operating Reactors
Enclosure:
List of Attendees cc w/encl:
See next page
Enclosure LIST OF ATTENDEES BABCOCK & WILCOX OWNERS GROUP MEETING OCTOBER 24, 1979 NRC S. B. Hosford K. Wichman T. H. Liu Babcock & Wilcox W. R. Speight R. E. Ham D. L. Howell EDS Nuclear G. C. Slagis TECo J. K. Wood Arkansas Power & Light D. G. Mardis GPU Service Corp L. Lanese SMUD B. Dieterich Florida Power J. V. Vattamattam CPCO J. J. Zabritski IVoVEMOER 2 0 1979