Submittal of Documents for the License Amendment Request for Process Protection System Replacement
ML16238A102
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/17/2016
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-16-081
Download: ML16238A102 (4)


Text

..

ratf~

Pacific Gas and Electrl~ Company"'

August 17, 2016 PG&E LetterDCL-16-081 U.S. Nuclear Regulatory Comrnission A TIN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-bPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 James M. Welsch Vice President, Nuclear Generation 10 CFR 50.90 Diablo Canyon Power Plant P.O. Box56 Avila Beach, CA 93424 805.545.3242 E*Mail: JMW1@pge.com Submittal of Documents for the License Amendment Request for Process Protection System Replacement

References:

1. PG&E Letter DCL-11-104, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26, 2011 (ADAMS Accession No. ML11307A331)
2. NRC Letter, "Summary of August 5, 2015, Teleconference Meeting with Paqific Gas and Electric Company on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1and2 (TAC NOS. ME7522 AND ME7523),"

dated.September 10, 2015 (ADAMS ~ccession No. ML15233A006)

Dear Commissioners and Staff:

In Reference 1, Pacific Gas and Electric Company (PG&E) submitted License Amendment Request 11-07 to request the NRC Staff (Staff) approval to replace the Diablo Canyon Power Plant (DCPP) Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Operations Management Tricon Programmable Logic Controller, Version 10, and the Westinghouse Electric Company Advanced Logic System.

This letter submits information from three PPS Replacement Project documents requested to be submitted by the NRC in Reference 2:

System Level Requirements Traceability Matrix, Revision 0 System Level Failure Modes & Effects Analysis, Revision 0 PPS Seismic, Qualification A

member of the STARS (Strategic Teaming and Resource Shar.ing)

Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

m Document Control Desk August17,2016 Page 2 PG&E Letter DCL-16-081 The Staff requested that the documents contained in the compact disc (CD) in to this letter be submitted in Open Items 101, 145, 149, and 153 contained in Enclosure 2 of Reference 2.

A copy of the CD will be provided to the following individuals:

Regional Administrator, Region IV DCPP Nuclear Reactor Regulation Project Manager DCPP NRC Senior Resident Inspector Branch Chief, California Department of Public Health The information in the Enclosure in this submittal does not affect the results of the technical evaluation or the significant hazards consideration determination previously transmitted in Reference 1.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions, or require additional information, please contact Mr. Hossein Hamzehee at (805) 545-4720.

I state under penalty of perjury that the foregoing is true and correct.

Executed on August 17, 2016.

Sincerely, Vice President, Nuclear Generation kjse/4328/50271918 Enclosure cc:

Diablo Distribution cc/enc: Marc L. Dapas, NRC Region IV Gonzalo L. Perez, Branch Chief, California Department of Public Health John P. Reynoso, NRC Acting Senior Resident Inspector Balwant K. Singal, NRR Project Manager A

member of the STARS (Strategic Teaming and Resource Sharing)

Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure PG&E Letter DCL-16-081 Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement Pacific Gas and Electric Company (PG&E) Letter DCL-11-104, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26, 2011, submitted License Amendment Request 11-07 to request NRC Staff (Staff) approval to replace the Diablo Canyon Power Plant (DCPP) Eagle 21 digital process protection system (PPS).

. Attachment 1 to the Enclosure of this letter contains the PPS Replacement project System Level Requirements Traceability Matrix and System Level Failure Modes and Effects Analysis documents, and key excerpts from the PPS Replacement Seismic Qualification. The Staff requested that information from these documents be submitted in Open Items 101, 145, 149, and 153 contained in NRC Letter, "Summary of August 5, 2015, Teleconference Meeting with Pacific Gas and Electric Company on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 AND ME7523)," dated September 10, 2015. The documents are summarized in Table 1 below and are contained in the compact disc (CD) in Attachment 1.

The seismic analyses of the PPS replacement equipment are contained in Sargent and Lundy Calculation 9000041947, "PPS Seismic Qualification." The seismic analyses were performed using the SAP2000 computer code, which is a general purpose linear and nonlinear finite element program for static and dynamic analysis that is referenced in the DCPP Updated Final Safety An.alysis Report as a computer program used in current licensing basis static and dynamic analyses. The seismic analyses considered the design basis earthquakes for DCPP and the resulting motions at the locations in which the PPS replacement equipment is to be installed.

The results of the seismic analysis for the existing PPS Replacement equipment cabinets, that are modified with additional bracing and plate members, concluded that the test response spectra equipment bound the in-equipment response spectra for the frequencies of interest.

Key excerpts from the PPS Seismic Qualification calculation are contained in to the Enclosure. The key excerpts from the PPS Seismic Qualification calculation include:

Purpose, assumptions, inputs, methodology, calculations, conclusions, and references Attachment J - Modification Sketches Attachment V - Component Qualification, Figures V-1 through V-30C (test response spectra versus in-equipment response spectra)

Attachment W - Miscellaneous Component Evaluations 1

Table 1 Enclosure PG&E Letter DCL-16-081 - CD Content "PPS Replacement Documents" File Description Filename [size MB]

System Level Requirements Traceability Matrix RTM [1.8]

(RTM), 15-0681-RTM-001, Revision 0 System Level Failure Modes & Effects Analysis FMEA [4.2]

(FMEA), 15-0681-FMEA-001, Revision 0 Key Excerpts from PPS Seismic Qualification, Seismic Qualification [4.5]

9000041947 2