MONTHYEARML16083A5642016-03-23023 March 2016 License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12., Low Temperature Overpressure Protection (Ltop) System. Project stage: Other ML16099A0122016-04-0707 April 2016 NRR E-mail Capture - Acceptance Review - License Amendment Request to Revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System - CAC Nos. MF7501 and MF7502) Project stage: Acceptance Review ML16231A1062016-08-18018 August 2016 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Revise Technical Specification 3.4.12 Project stage: RAI DCL-16-094, Response to NRC Request for Additional Information Regarding License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, 'Low Temperature Overpressure Protection (LTOP) System'.2016-09-28028 September 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, 'Low Temperature Overpressure Protection (LTOP) System'. Project stage: Response to RAI DCL-17-006, Request for 180-Day Implementation Schedule for License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System.2017-01-18018 January 2017 Request for 180-Day Implementation Schedule for License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System. Project stage: Request ML17025A2982017-01-24024 January 2017 NRR E-mail Capture - (External_Sender) Issuance of License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Request ML17018A3412017-02-23023 February 2017 Issuance of Amendments Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, Project stage: Approval 2016-09-28
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24285A1902024-10-0808 October 2024 Email - Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Environmental Assessment ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24250A0502024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML24291A1322024-09-0505 September 2024 E-mail to California Department of Public Health for Diablo Canyon ISFSI License Renewal Environmental Assessment ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML24060A0022024-02-28028 February 2024 (External Sender) Pre-Sub Mittal EWS Participants List E-mail ML24045A1972024-02-0606 February 2024 Tribal Consultation Request ML24033A3062024-02-0101 February 2024 Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension ML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mothers for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition ML21264A6722021-09-21021 September 2021 NRR E-mail Capture - Revised Schedule: Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation 2024-09-06
[Table view] |
Text
NRR-PMDAPEm Resource From: Singal, Balwant Sent: Thursday, August 18, 2016 8:29 AM To: Richardson, Michael
Subject:
Request for Additional Information - License Amendment Request to Revise Technical Specification 3.4.12 (CAC Nos. MF7501 and MF7502)
Attachments: MF7501-RAI-SRXB.docx
- Mike, By letter dated March 23, 2016 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML16084A588), Pacific Gas and Electric Company (PG&E) submitted License Amendment Request to revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, for Diablo Canyon Power Plant (DCPP), Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) staff request PG&E to provide additional information to complete its review of the PG&E request. The request for additional information (RAI) is attached.
Draft RAI was transmitted to PG&E on August 9, 2016. You confirmed by e-mail dated August 17, 2016 that a clarification is not needed. Please treat this e-mail as formal transmittal of RAIs. You are requested to respond within 30 days from the date of this e-mail.
Thanks.
Balwant K. Singal Senior Project Manager (Diablo Canyon)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1
Hearing Identifier: NRR_PMDA Email Number: 3000 Mail Envelope Properties (Balwant.Singal@nrc.gov20160818082800)
Subject:
Request for Additional Information - License Amendment Request to Revise Technical Specification 3.4.12 (CAC Nos. MF7501 and MF7502)
Sent Date: 8/18/2016 8:28:36 AM Received Date: 8/18/2016 8:28:00 AM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:
"Richardson, Michael" <MJRm@pge.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1057 8/18/2016 8:28:00 AM MF7501-RAI-SRXB.docx 22282 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: ZZZ
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.4.12 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323 By letter dated March 23, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16084A588), Pacific Gas and Electric Company (PG&E) submitted License Amendment Request (LAR) to revise Technical Specification (TS) 3.4.12, Low Temperature Overpressure Protection (LTOP) System, for Diablo Canyon Power Plant (DCPP), Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) staff need the following additional information to complete its review of the PG&E request:
Request for Additional Information RAI-1 , LTOP Orifice - Key Design Features, to the Enclosure of letter dated March 23, 2016, states that the positive displacement pump (PDP) had a flowrate that was fairly constant near 100 gpm for all the reactor coolant system (RCS) operating pressure conditions. The replacement centrifugal pump (referred to as the normal charging pump or NCP) is stated to have a maximum flow of 120 gpm through the LTOP orifice. Table 1, LTOP Maximum Injection Flows, and Figure 1, LTOP Maximum Flows (gpm) vs. RCS Pressure (psia), of Enclosure to letter dated March 23, 2016 show that the maximum flow is reduced (on the order of 40 gpm) when changing from the PDP to the NCP, however, the flowrate can be larger with the NCP.
Please provide additional details on how the injection curves were determined and explain how the original maximum injection flow curve is still bounding now that there is the possibility of larger flowrates with the NCP.
RAI-2 to the Enclosure of letter dated March 23, 2016 states, in part, From the results presented in Figure 3, [LTOP Orifice - Pressure Drop - vs -
Flow Rate,] it can be observed that LTOP orifice limits the flow to less than 120 gpm.
While the data points for flowrate do not exceed 120 gpm on Figure 3 of Attachment 4, it is not clear that the LTOP orifice limits the flow to 120 gpm or if the testing just stopped at this point.
Page 1 of 2
Please provide additional information to demonstrate the pump is not capable of supplying more than 120 gpm through the LTOP orifice.
RAI-3
Figure 4, NCP aligned to LTOP Orifice - Acceptance Criteria, of Attachment 4 to the Enclosure of letter dated March 23, 2016 shows the pressure drop acceptance criteria for the LTOP orifice. This figure shows flowrates from 50 to 80 gpm, however, the maximum flowrate of the normal charging pump (NCP) through the LTOP orifice is stated to be 120 gpm. Please justify the use of 50 to 80 gpm (scaling on the X-axis) when the maximum flowrate is 120 gpm.
RAI-4
Figure 1, DCPP LTOP Mass Input Typical RCS Pressure Transient, of Attachment 5, Additional Information, to the Enclosure of letter dated March 23, 2016 shows a typical RCS pressure transient. In this figure, the Power Operated Relief Valve setpoint is given as 435 psig (gage), however, the curve (dotted line) is plotted as 435 psia (absolute). Given that the overshoot and undershoot values are based off of this value, please confirm that this is just an error on the example figure, rather than an error in any actual calculations.
Page 2 of 2