L-2016-140, NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from ML16230A001)
Jump to navigation Jump to search
NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations
ML16230A001
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/13/2016
From: Costanzo C
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2016-140
Download: ML16230A001 (2)


Text

July 13, 2016 L-2016-140

. ' ..... ;,:;:Ji.-: . . 1;'*.*

~-- ~ l" .l. . .~. i : 10 CFR 50.4 l!J: 'S'f Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: *: St. 'Lu*eie Units 1 and 2

.* ~ /'.Docket Nos: 50-335 and 50-389

  • "
  • NRC Regulatory Issue Summary 2016-09 Preparation And Scheduling of Operator Licensing Examinations On June 16, 2016, NRC issued Regulatory Issue Summary (RIS) 2016-09, Preparation and Scheduling of Operator Licensing Examinations. RIS 2016-09 requests licensees to submit, on avoluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).

The-NRC statedJhatfth1$'.}information would h'elp the NRC"to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2016-09 ..

Enclosed please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.

Please contacf'Erik' Fe'ightner aV772-467-.7350 if th.ere are questions regarding* this submittal: *,, * * .: 1 ' : ~-*"'* ",-:**. * .. :;_:* ... ,:.:: r-,,-= .:c:.: .. ..

.;,_ 1.'

Very truly yoLirs, .:- . ~ .: . ' ,

\.*. *,  : ,_-

. -* .; .* *-~ -~ ... :


risto;~ ~~- '." ' ,'*

~: .. . . \....'  : '.:* .. .

. ; i -~ i .:'.'.-~ .

Site Vice President** '_Jc' '". 1 * ,*

SC Lucie* Pl'arif : ! !', .*

CRC/tlt

. \.,

cc/enc: Eugene F. Guthrie, DRS, OB, Rll .J Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) tP"'****,,,.. Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~.-:1 >o information collection is used to plan budgets and resources for operator examinations. Send rt ~ OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch [T-5

..~

~

~

c EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by &-mail to lnfocoDects.Resource@ruc.gov, and to the Desk Officer, Ollice of Information and Regulatory Affairs,

~<f.., ~($'~ NEOS.10202, (3150-0131), Office of Management and Budge~ Washington, DC 20501 If a means

  • 11t*ir"' used to impose an information collection does not display a currently vafid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION St. Lucie Plant II A. *PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER

' NUMBER OF REACTOR

\.~

OPERATORS 5 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 18 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE 04/08/2019 08/17/2020 ALTERNATE DATE 04/22/2019 08/31/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 2018 PROPOSED NUMBER MARCH CY

-- SEPTEMBER MARCH CY