Transmittal Letter for Revision 38 to Radiological Emergency Response Plan Implementing Procedure 0PEP-02.6.27, Activation and Operation of the Emergency Operations Facility
ML16216A116
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/20/2016
From: Pope A
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
0PEP-02.6.27, Rev 38
Download: ML16216A116 (2)


Text

~(~DUKE Bnmswfck Nuclear Plant P.O. Boie 1C429

~ ENERGYe Southport, NC 28461 JUL 2 L 2016 10 CFR 50.4(b)(5)(iii) 10 CFR 50.54(q)(5)

Serial: BSEP 16-0055 10 CFR 72.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Revision to Radiological Emergency Response Plan *Implementing Procedure Ladies and Gentlemen:

In accordance with 10 CFR 50.4(b)(5)(iii); 10 CFR 50.54(q)(5); and 10 CFR 72.4; Duke Energy Progress, Inc., is submitting a revision to Radiological Emergency Response Plan Implementing Procedure OPEP-02.6.27, Activation and Operation of the Emergency Operations Facility -

(EOF), Revision 38, which became effective June 29, 2016.

  • Duke Energy has evaluated this revision, in accordance with 10 CFR 50.54(q), and determined*

that the revision is not a reduction in the effectiveness of the Radiological Emergency Response Plan and that the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50, Appendix E. Enclosure 1 provides a 10 CFR 50.54(q)(5) summary for the revised Radiological Emergency Response Plan implementing procedure.

Enclosure 2 contains a copy of the revised Radiological Emergency Response Plan implementing procedure.

This document contains no regulatory commitments.

Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.

Sincerely, Annet H. Pope Director - Organizational Effectiveness Brunswick Steam Electric Plant

U.S. Nuclear Regulatory Commission Page 2 of 2

Enclosures:

1; 10 CFR 50.54(q)(5) Summary for OERP, Revision 88, and for OPEP-02.6.27, Revision 38

2. Copy of OPEP-02.6.27, Revision 38, Activation and Operation of the Emergency Operations Facility (EOF) cc (with Enclosures 1 and 2):

U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 cc (with Enclosure 1 only):

U.S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Andrew.Hon@nrc.gov U.S. Nuclear Regulatory Commission ATTN: Mr. John Nguyen (Mail Stop 3WFN 14A) (Electronic Copy) 11555 Rockville Pike Rockville, MD 20852-2738 cc (without enclosures):

Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net U.S. Nuclear Regulatory Commission ATTN: Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001