Boiling Water Reactor Facility Operating License - License Termination Plan Request for Support Documents
ML16211A117
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 07/26/2016
From: Gerard van Noordennen
LaCrosseSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML16211A130 List:
References
LC-2016-0027
Download: ML16211A117 (6)


Text

~

LACROSSESOLUTIONS 10 CFR 50.4 (b)(l)

July 26, 2016 LC-2016-0027 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046

Subject:

License Termination Plan Request for Support Documents

References:

1) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Amendment Request for the License Termination Plan," dated June 27, 2016 The La Crosse Boiling Water Reactor (LACBWR) License Termination Plan (LTP) was submitted to the U.S. Nuclear Regulatory Commission (NRC) for review on June 27, 2016 as documented in Reference 1. During the acceptance review, the NRC requested support documents referenced in Technical Support Document (TSD) RS-TD-313196-004, "LACBWR Soil DCGL and Concrete BFM Dose Factors." Specifically, the request was to provide the RESRAD output files listed on page 57 of the TSD. This correspondence provides the requested information.

Enclosure 1 provides the RESRAD input and output files in CD format. Enclosure 2 contains a preflight status report identifying any noncompliance issues with NRC electronic submittal guidance that could not be resolved due to the source of the information being submitted. All submitted information is in legible format.

There are no regulatory commitments made in this submittal. If you should have any questions regarding this submittal, please contact me at (224) 789-4025.

Respectfully, d~C ~

-¥'&1r G~dv~ Noordennen Vice President Regulatory Affairs S4601 State Highway 35, Genoa, WI 54632

LaCrosseSolutions LCS-2016-0027 Page 2 of2 Enclosures Enclosure 1: TSD RS-TD-313196-004 Identified RESRAD Output Files Enclosure 2: Preflight Status Report cc: Marlayna Vaaler, U.S. NRC Project Manager (2 copies of the enclosures)

Regional Administrator, U.S. NRC, Region III (1 copy of the enclosures)

Service List (Cover letter only, no enclosures)

La Crosse Boiling Water Reactor Service List cc:

Ken Robuck Jeffery Kitsembel Group President Disposal and Division of Energy Regulation Decommissioning Wisconsin Public Service Commission EnergySolutions P.O. Box 7854 299 South Main Street, Suite 1700 Madison, WI 53 707-7854 Salt Lake City, UT 84111 Paul Schmidt, Manager John Sauger Radiation Protection Section Executive VP and Chief Nuclear Officer Bureau of Environmental and Occupational Health ReactorD&D Division of Public Health EnergySolutions Wisconsin Department of Health Services 2701 Deborah Avenue P.O. Box 2659 Zion, IL 60099 Madison, WI 53701-2659 Gerard van N oordennen Barbara Nick VP Regulatory Affairs President and CEO EnergySolutions Dairyland Power Cooperative 2701 Deborah Avenue 3200 East Avenue South, Zion, IL 60099 La Crosse, WI 54602-0817 Joseph Nowak Cheryl Olson, ISFSI Manager General Manager La Crosse Boiling Water Reactor LaCrosseSolutions Dairyland Power Cooperative S4601 State Highway 35 S4601 State Highway 35 Genoa, WI 54632-8846 P.O. Box 817 Genoa, WI 54632-8846 Dan Shrum Senior VP Regulatory Affairs Lane Peters EnergySolutions La Crosse Boiling Water Reactor 299 South Main Street, Suite 1700 Dairyland Power Cooperative Salt Lake City, UT 84111 S4601 State Highway 35 Genoa,WI54632-8846 Russ Workman General Counsel Thomas Zaremba EnergySolutions Wheeler, Van Sickle and Anderson, S.C.

299 South Main Street, Suite 1700 44 East Mifflin Street, Suite 1000 Salt Lake City, UT 84111 Madison, WI 53 703

/

Jerome Pedretti, Clerk John E. Matthews Town of Genoa Morgan, Lewis & Bockius LLP E860 Mundsack Road 1111 Pennsylvania A venue, NW Genoa, WI 54632 Washington, DC 20004

Enclosure 2 Preflight Report for to LC-2016-0027

LaCrosseSolutions, LLC LC-2016-0027: Enclosure 2 Page 1 of2 This document serves as preflight report for Enclosure 1 to the letter LC-2016-0027. The following files do not pass pre-flight criteria or do not meet NRC criteria, but text is word searchable with clarity/legibility of high quality~

Preflight Reference Document Name File Name Reason Status Document contains scanned document RS-TD-313196-004 LACBWR Soil DCGL and Concrete (unembedded fonts),

RS-TD-313196-004, Rev 0, Final Failed BFM Dose Factors logos, backgrounds, and signatures < 300 ppi, clear and legible Alt Scenario Soil Resident Gardener 20151019 Passed Alternate Scenario WTB 20151019 Passed LACBWR BFM Drilling Spoils Area Factor 20151014 Passed LACBWR BFM Remaining Structures DSR Summary Passed Report 20151019 LACBWR BFM RS Uncertainty Analysis Uncertainty Passed Report 20150901 LACBWR BFM Rx Above 619 DSR Summary Report Passed 20151019 LACBWR BFM Rx Above 619 Uncertainty Analysis Passed Uncertainty Report 20150901 LACBWR BFM Rx Below 619 DSR Summary Report Passed 20151019 LACBWR BFM Rx Below 619 Uncertainty Analysis Passed Uncertainty Report 20150901 LACBWR BFM WGTV Summary Report 20151019 Passed LACBWR BFM WGTV Uncertainty Analysis Uncertainty Passed Report 20150901 LACBWR BFM WTB Summary Report 20151019 Passed LACBWR BFM WTB Uncertainty Analysis Uncertainty Passed Report 20150901 LA CB WR Buried Pipe Excavation Circ 03_26_16 Passed LA CB WR Buried Pipe Excavation Group 03_26_16 Passed

LaCrosseSolutions, LLC LC-2016-0027: Enclosure 2 Page 2 of2 LACBWR Buried Pipe Insitu Circ 12_01_15 Passed LACBWR Buried Pipe Insitu Group 12_0l_15 Passed LACBWR Soil Area Factor 1 m2 20151019 Passed LACBWR Soil Area Factor 2 m2 20151019 Passed LACBWR Soil Area Factor 5 m2 20151019 Passed LACBWR Soil Area Factor 10 m2 20151019 Passed LACBWR Soil Area Factor 100 m2 20151019 Passed LACBWR Soil DCGL Initial Suite Summary Report Passed 20151014 LACBWR Soil Uncertainty Analysis Uncertainty Report Passed Initial Suite 20150903