ML16176A108

From kanterella
Jump to navigation Jump to search
GE Hitachi Nuclear Energy - Transmittal of Revised Annual Ntr Operating Report
ML16176A108
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 06/24/2016
From: Leik M
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16176A107 List:
References
TML 16-004
Download: ML16176A108 (1)


Text

  • HITACHI GE Hitachi Nuclear Energy Markleik Manager, EHS Global Facilities & Services 6705 Vallecitos Road MCV-18 Sunol, CA 94586 TML 16-004 USA T 925-918-6074 June 24, 2016 Mark.leik@ge.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

Subject:

Revised Annual NTR Operating Report

References:

1) NRC License R-33, Docket 50-73
2) Letter M. Leik (GEH) to NRC Document Control Desk, Annual NTR Operating Report, 3/31/16 Enclosed is a revised Annual Operating Report No. 56 for the GE Hitachi Nuclear Test Reactor (NTR) located at the Vallecitos Nuclear Center in Sunol, California. The report has been revised to correct stack emission and environmental air monitoring results and replaces the previously submitted report (Reference 2).

If you have questions regarding this report or need additional information, please contact me using the contact information above.

Mark Leik, Manager EHS Global Facilities & Services Commitments: None

Attachment:

NTR Annual Operating Report Number 56, Revision 1 for the year 2015 cc: NRC Region IV Administrator D. Hardesty, NRC NRR

0. Font, NRC NRR