ML16162A751
| ML16162A751 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/03/2016 |
| From: | Lacal M Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| 102-07251-MLL/MAM | |
| Download: ML16162A751 (3) | |
Text
(
MARIA L. LACAL Senior Vice President Oaps ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED Nuclear Regulatory and Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 102-07251-MLL/MAM June 03, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike
- Rockville, MD 20852
Dear Sirs:
Subject:
Palo Verde Nuclear Generating S_tation (PVNGS)
Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530and 72'-44 License No. NPF-41; NPF-51; NPF-74 Phoenix, AZ 85072 Mall Station 7605 Tel 623,393.6491 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 19 Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS) hereby submits Revision 19 of the PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation (ISFSI) Security Program (hereafter the Plan). This revision was implemented on May 13, 2016 and primarlly Incorporates changes made to the protected area at PVNGS, which included transitioning from old to new alarm stations, and the primary vehicle access portal.
These and additional changes are described further In the enclosures.
APS has evaluated the Plan changes In accordance with 10 CFR 50.54(p) and concluded that the revision does not result In a decrease in effectiveness of the Plan.
No commitments are being made to the NRC by this letter.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals Is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Should you have questions concerning this matter, please contact Kevin Martinez, Security Operations Department Leader, at 623-393-2731.
- iincerely, lit./~' ~~J___
ft).~
Date: ot;,,.o7. z.01 b Programs Standards, Safeguards Administrator Unauthorized disclosure may lead to civil and/or MLL/MAM Criminal penalties.
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek So o l l\\JH 6~ 2-lr-rJ ~{C--
N "-'\\ 5 S
(
ENCLOSURE(S) CONTAfN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 PVNGS Security Plan, Revision 19 Page 2
Enclosures:
- 1) Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 19
- 2) 10 CFR 50.54(p) Table of Changes cc:
M. L. Dapas S. P. Lingam M. M. Watford C. A. Peabody M. L. Chambers NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS Sr. Physical Security Inspector, R-IV/DRS/PSB1 ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
l
(
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED ENCLOSURE 1 Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 19
. ENCLOSURE($) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED
(
MARIA L. LACAL Senior Vice President Oaps ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED Nuclear Regulatory and Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 102-07251-MLL/MAM June 03, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike
- Rockville, MD 20852
Dear Sirs:
Subject:
Palo Verde Nuclear Generating S_tation (PVNGS)
Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530and 72'-44 License No. NPF-41; NPF-51; NPF-74 Phoenix, AZ 85072 Mall Station 7605 Tel 623,393.6491 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 19 Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS) hereby submits Revision 19 of the PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation (ISFSI) Security Program (hereafter the Plan). This revision was implemented on May 13, 2016 and primarlly Incorporates changes made to the protected area at PVNGS, which included transitioning from old to new alarm stations, and the primary vehicle access portal.
These and additional changes are described further In the enclosures.
APS has evaluated the Plan changes In accordance with 10 CFR 50.54(p) and concluded that the revision does not result In a decrease in effectiveness of the Plan.
No commitments are being made to the NRC by this letter.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals Is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Should you have questions concerning this matter, please contact Kevin Martinez, Security Operations Department Leader, at 623-393-2731.
- iincerely, lit./~' ~~J___
ft).~
Date: ot;,,.o7. z.01 b Programs Standards, Safeguards Administrator Unauthorized disclosure may lead to civil and/or MLL/MAM Criminal penalties.
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek So o l l\\JH 6~ 2-lr-rJ ~{C--
N "-'\\ 5 S
(
ENCLOSURE(S) CONTAfN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 PVNGS Security Plan, Revision 19 Page 2
Enclosures:
- 1) Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 19
- 2) 10 CFR 50.54(p) Table of Changes cc:
M. L. Dapas S. P. Lingam M. M. Watford C. A. Peabody M. L. Chambers NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS Sr. Physical Security Inspector, R-IV/DRS/PSB1 ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
l
(
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED ENCLOSURE 1 Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 19
. ENCLOSURE($) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED