ML16162A501
| ML16162A501 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/14/1983 |
| From: | Mcintosh J, Tucker H Duke Power Co |
| To: | O'Reilly J NRC Office of Inspection & Enforcement (IE Region II) |
| Shared Package | |
| ML16162A500 | List: |
| References | |
| NUDOCS 8311040203 | |
| Download: ML16162A501 (2) | |
Text
DUKE POWER GOMPANY P.O. Box 33189 GHARLOTTE, N.C. 28242 HAL B. TUGKER TELEPHONE vICE p p.Ns r (704) 373-4531
.MoMAH ODUCTIONSeptember 14, 1983 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Re:
Oconee Nuclear Station Docket Nos. 50-269, -270, -287
Dear Mr. O'Reilly:
Please find attached a copy of Revision No. 83-06 to the Oconee Nuclear Station Emergency Implementing Procedures Manual. By copy of this letter, two copies are provided to Mr. H. R. Denton, NRC, Washington, D. C. Also, per a request from Gary Huffman, a new copy of the Oconee Nuclear Station Emergency Plan Implementing Procedures Manual is included for NRC, Region II, use.
Very truly yours, Hal B. Tucker JCP/php Attachments cc:
Mr. Harold R. Denton, Director (2)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
.311040203 831102 7
PDR. ADOCK 05000269 F
- S DUKE POWER COMPANY.
OCONEE NUCLEAR STATION P. 0. BOX 1439 SENECA. S. C. 29678 E
882-5363 August 22, 1983 O
Go,~
TO:
CONTROL COPY NO
SUBJECT:
Emergency Implementing Procedure Manual Revision 83-6 (Effective August 19, 1983)
Please make the following Changes to your copy of the Oconee Implementing Procedure Manual:
REMOVE INSERT
- 1. Cover Sheet, 83-5
- 1. Cover Sheet, 83-6
- 2. Table of Contents, Pages 1, 2
- 2. Table of Contents, Pages 1, 2
- 3. Telephone Directory, 3/31/83
- 3. Telephone Directory, 06/30/83
- 4. Procedure AP/0/B/1000/02
- 4. Procedure AP/0/B/1000/02 (10/29/82)
(08/10/83)
- 5. Procedure AP/0/B/1000/03
- 5. Procedure AP/0/B/1000/03 (10/29/82)
(08/10/83)
- 6. Procedure AP/O/B/1000/04
- 6. Procedure AP/0/B/1000/04 (10/29/82)
(08/10/83)
- 7. Procedure AP/0/B/1000/05
- 7. Procedure AP/0/B/1000/05 (10/29/82)
(08/10/83)
- 8. Procedure AP/0/B/1000/06
- 8. Procedure AP/0/B/1000/06 (02/07/83)
(08/10/83)
- 9. Procedure AP/0/B/1000/07
- 9. Procedure AP/0/B/1000/07 (06/09/83)_NOTE: Enl. 4.5 (06/09/83) was missing from this issue.
- 10. Procedure CP/l/A/2002/04C
- 10. Procedure CP/l/A/2002/04C (02/24/83)
(07/27/83)
Return the acknowledgement printed below to Document Control by August 29, 1983.
tT. McIntos~h Superintendent of Administration
/1ss Attachment OCONEE NUCLEAR STATION Emergency Implementing Procedures Manual Revision 83-6 (Effective August 19, 1983)
CONTROL COPY N SIGNATURE DATE LOCATION