ML16162A443

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 83-02 to Emergency Implementing Procedures Manual,Including Procedure CP/0/B/4003/02 Re Determination of Plume Direction to Be Monitored After Large Unplanned Release of Radioactivity
ML16162A443
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/03/1983
From: Tucker H
Duke Power Co
To: O'Reilly J
NRC Office of Inspection & Enforcement (IE Region II)
Shared Package
ML16162A444 List:
References
NUDOCS 8304220332
Download: ML16162A443 (1)


Text

DUKCE POWER COMPANY P.O. BOX 33189 CRARLOTTE, N.C. 28242 HAL B. TUGKER TELEPHONE VI PRESIDENT (74 37451 NUGLZ~ft PUODUCTION (0)3343 March 3, 1983 Mr. James P. O'Reilly, Regional Administrator.

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Mr. O'Reilly:

Please find attached a copy of Revision No. 83-02 to the Oconee Nuclear Station Emergency Implementing Procedures Manual. By-copy of this letter, two copies are provided to Mr. H. R. Denton, NRC, Washington, D. C.

Very truly yours, Hal B. Tucker JCP/php Attachment cc:

(2 copies)

Mr. Harold R. Denton, Dilrector Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8304220332 830415 PDR ADOCK 05000269 F

PDR