ML16162A436

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Crisis Mgt Plan Implementing Procedures,Including Procedures 5.3.1 Re Recovery Manager & Immediate Staff Group Plan & 5.3.4 Re Scheduling/Planning Support Group
ML16162A436
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 03/08/1983
From: Tucker H
DUKE POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML16162A437 List:
References
NUDOCS 8303240120
Download: ML16162A436 (2)


Text

DuKE POWER COMPANY P.O. BOX 33189 CHARLOTTE, N.c. 28242 HAL B. TUCKER TELEPHONE VICE PRESIDENT (704) 373-4531 NUGURR PRODUCTION March 8, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

McGuire Nticlear Station Oconee Nuclear Station Catawba Nuclear Station Docket Nos. 50-369, -370; 50-269, -270, -287; 50-413, -414

Dear Mr. Denton:

Enclosed for NRC Staff use and review are two copies of the latest revisions to the following Crisis Management Plan Implementing Procedures:

1) 5.3.1 -

Recovery Manager and Immediate Staff Group Plan (Revision 5, dated February 28, 1983)

2) 5.3.4 -

Scheduling/Planning Support Group (Revision 6, dated February 28, 1983)

3) 5.3.5 -

Design/Construction Support Group (Revision 9, dated February 10, 1983)

4) 5.3.6 -

Radiological Support Group (Revision 5, dated February 28, 1983)

5) 5.3.7 -

Technical Support Group (Revision 5, dated February 28, 1983)

6) 5.3.9 -

Procedure for Distribution of Data and Information (Revision 2, dated February 28, 1983)

7) 5.3.10 -

Oconee Nuclear Station - Crisis Telephone Directory (Revision 3, dated February 28, 1983)

8) 5.3.14 - Duke Power Company, Crisis Management Center, Environmental Monitoring for Emergency Conditions within the Ten-Mile Radius of McGuire Nuclear Station (Revision 6, dated February 1, 1983)
9) 5.3.16 -

Quarterly.Inventory (Revision 3, dated February 28, 1983)

These revisions should be incorporated into your Crisis Management Plan manuals removing any earlier version pages of this plan.

Please delete privacy material in the form of personal telephone numbers prior to placing any material in the public document room, specifically:

1) Notification Procedure Call List, page 7 8303240120 830321 PDR ADOCK 05000269 F

PDR

Mr. Harold R. Denton, Director March 8, 1983 Page 2

2)

Figure 3, page 14

3) Additional Support Personnel, page 4 of 26 Quality Assurance Personnel, page 5 of 26 Crisis Management Plan -

Telephone Call-up List, page 16 of 26 Westinghouse Emergency Organization, page 23 of.26 Babcock and Wilcox Emergency Organization, page 24 of 26

4) Table 2, page 27-31
5) Figure 2, page 15 Figure 3, page 17
7) Oconee Nuclear Station -

Number Code for Identifying Personnel/Activities to be Notified, page 11-14

8) Enclosure 5.1, page 6.8, page 25 By copy of this letter, one copy of each of the above documents are being provided to the NRC, Region II.

Very truly yours, Hal B. Tucker WHM/php Enclosures cc:

Mr..James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 (w/o enclosures)

Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Mr. J. C. Bryant NRC Senior Resident Inspector Oconee Nuclear Station Mr. P. K. Van Doorn NRC Senior Resident Inspector Catawba Nuclear Station