December 9, 93
'bocket Nos. 50-269, b270, 50-287, DISTRIBUTIO 50-369, 50-370, 50-413, Docket File E.Merschoff,RII and 50-414 NRC/Local PDRs OGC L.Wiens ACRS (10)
Mr. M. W. Tuckman V.Nerses W. Haass, 9D4 Senior Vice President R.Martin Nuclear Generation L.Berry Duke Power Company L.Plisco P. 0. Box 1006 G.Lainas Charlotte, North Carolina 28201 S.Varga
Dear Mr. Tuckman:
SUBJECT:
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3; MCGUIRE NUCLEAR STATION, UNITS 1 AND 2; AND CATAWBA NUCLEAR STATION, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, OWFN, M/S 9D4, Washington, DC 20555.
Sincerely, Original signed by:
Loren R. Plisco, Acting Director Project Directorate 11-3 Division of Reactor Projects -
III Office of Nuclear Reactor Regulation
Enclosure:
Part 21 Monthly Report for November 1993 cc w/o enclosure:
See next page OFFICE PDII-3/L PDI M
PD I
PDII NME L. BERR Lc:WIENS Y.
RSES RTIN L. P'ISCO DATE 12/q/ 93 12/9/93 12/
/93 12/9 /93 OFFICIAL RECORD COPY FILE NAME: G:\\PART21.LTR 140003 NCF LE CENTER C 9
3 9 3 1 2 0 9r PDR ADOCK,015000269, PDR~
Page c.
1 11/30; 93 10 CFR PART 21 TRACKING SYSTEM VENDOR INSPECTION BRANCH DIVISION OF REACTOR INSPECTION AND LICENSEE PERFORMANCE LOG 0 rUB REPORT ACCESSION ASSIGNED CLOS DESCRIPTION AND DATE NUMBER OUT
\\END CODE 93415 CPL 10/28/93 RVIB: W.HAASS CAROLINA PLL/ROBINSON 2 REPORTS FAILURE OF EDG B TO START DUE C4'0 TOBROKEN SPRINGS ON THREE OF THE AIR START DISTRIBUTOR VALVES PREVENTING AIR FROM ENTERING CYLINDERS REQUIRED TO ROLL DIESEL.
DUE BY: 1/3/94 SPRINGS WERE REPLACED BROKEN SPRINGS BEING EVALUATED.
93416 F120 11/01/93 RVIB:G.CWALINA CTBI FISCHER A PORTER REPORTS DEVIATION IN TESTING METHODOLOGY FOR CLAMP-ON ULTRASONIC FLOW METERS USED ON 12" SCH 40 PIPE CARRYING CWE WATER. BUTTERFLY VALVE IN TEST SETUP CAUSE LO FLOW INDICATION.
DUE BY: 1/3/94 LICENSEES HAVE BEEN NOTIFIED. SEE LOG#93417/93438.
93417 F120 11/01/93 RVIB: R.WILSON FISCHER & PORTER CO PROVIDES FURTHER INFOR REGARDING DEVIATION IN TESTING OF CLAMP-ON ULTRASONIC FLOW METERS. TEST ARRANGEMENT CWE DESCRIBED THAT CAUSED LO FLOW INDICATION. SEE LOG #93416/93438.
DUE BY: 1/3/94 93418 o
11/02/93 SRXB: R.JONES INDIAN POINT UNIT 3 REPORTS INCONSISTENCY OF MIN TEMP FOR
.120 CRITICALITY BETWEEN TECH SPEC & SAFETY ANALYSIS. TECH SPEC CALLS FOR 450 F WHILE SAFETY ANALYSIS SAYS 540 F. COOLANT TEMP CAN DUE BY: 1/3/94 AFFECT CORE PHYSICS PARAMETERS.
SEE LOG#93137.
93419 ',PC 08/13/93 RVIB: K.NAIDU CTBI PALISADES/UNIT 1 REPORTS POTENTIAL GENERIC PROBLEM OF CLARK RELAYS, MODEL SU12-76, NINE CONTACT OR MORE, NOT MEETING SEISMIC QUAL REOMTS.
LICENSEE REPLACED COILS WITH STRONGER COILS & SOLVED DUE BY: 1/5/94 PROBLEM.
93420 N007 11/05/93 9311080224 RVIB: R.FRAHM MAMCO CONTROLS REPORTS POTENTIAL ABNORMAL OPERATION OF LIMIT CWE SWITCHES EA740 & EA750 WHEN OPERATED BELOW 65 F DUE TO INCREASE OF VISCOSITY OF GREASE. IF MAX RESPONSE TIME IS CRITICAL, TEMP DUE BY: 1/5/94 SHOULD BE ABOVE 70 F. COMMONWEALTH EDISON IS MAIN USER.
93421 D0E 09/24/93 RVIB: K.NAIDU FRNW DEPARTMENT OF ENERGY REPORTS FAILURE OF CIRCUIT BREAKER OPERATING W120 LINKAGE DUE TO IMPROPER ALIGNMENT OF PLASTIC FACE PLATE. C/Bs ARE 480 V, 3 PHASE, TYPE EN WESTINGHOUSE.
DUE BY: 1/5/94 93422 6340 10/19/93 9310280093 EGCB: G.BAGCHI BOEING COMPUTER SERVICES REPORTS RECEIPT OF ERROR NOTICE FROM FORMER SOFTWARE SUPPLIERS REGARDING PROBLEMS IN GTSTRUDL. ALL NUCLEAR CUSTOMERS NOT NOTIFIED.
DUE BY: 1/10/94 93423 B340 10/22/93 9310270076 EGCB: G.BAGCHI BOEING COMPUTER SERVICES REPORTS RECEIPT OF ERROR NOTICES RECEIVED FROM FORMER SOFTWARE SUPPLIERS REGARDING PROBLEMS WITH ANSYS COMPUTER CODE. NOT ALL NUCLEAR CUSTOMERS WERE NOTIFIED.
DUE BY: 1/10/94
Page Nc.
2 11/30/93 10 CFR PART 21 TRACKING SYSTEM VENDOR INSPECTION BRANCH DIVISION OF REACTOR INSPECTION AND LICENSEE PERFORMANCE LOG 0 SUB REPORT ACCESSION ASSIGNED CLOS DESCRIPTION AND DATE NUMBER OUT VEND CODE CODE 93424 B340 10/11/93 9310210171 EGCB: G.BAGCHI BOEING COMPUTER SERVICES REPORTS RECEIPT OF ERROR NOTICES FROM FORMER SOFTWARE SUPPLIERS REGARDING GTSTRUDL.
NOT ALL NUCLEAR CUSTOMERS HAVE BEEN NOTIFIED.
DUE BY: 1/10/94 93425 E296 10/07/93 9310200279 RVIS: R.FRAHM ENVIROTECH CONTROLS REPORTS OBSERVATION OF PROBLEMS ON WESTRONICS MODEL 2100C SERIES RECORDERS ON UNITS BUILT PRIOR TO 1993 DURISIESMIC TESTING INC RESETTING AT PEAK ACCEL & FORCING OF DOOR DUE BY: 1/10/94 OFF ITS ATTACHMENT POINT. REPAIR KIT AVAILABLE.
93426 NYPA 10/01/93 9310080020 EGCB: G.BAGCHI NEW YORK POWER AUTHORITY/IP-3 REPORTS RECEIPT OF WEST NSAL W120 ADDRESSING DISCREP IN VALVE WEIGHTS/CGs USED IN PIPING ANALYSES.
INCLUDED ARE VALVES FROM ALOYCO, ANCHOR-DARLING, FISHER & VELAN.
DUE BY: 1/10/94 EVALUATION UNDERWAY.
93427 DLC 11/08/93 RVIB: B.ROGERS DUDUESNE LIGHT/BEAVER VALLEY 2 REPORTS FAILURE OF 2 EDG A611 SEQUENCERS DUE TO CIRCUIT DESIGN PROBLEM RESULTING FROM USE OF w336 ATC MODEL365A LONG RANGE TIMER RELAYS. NRC/AIT REVIEWING.
DUE BY: 1/10/94 93428 A109 11/02/93 9311080211 RVIB: B.ROGERS CTBI AMERACE/AGASTAT REPORTS THAT THE 30 GPIA RELAYS SUBJECTED TO W336 NUCLEAR QUAL TESTING AT WYLE LABS ARE MNFRD AS COMMERCIAL GRADE &
ARE NOT DESIGNED TO MEET/RECOMMENDED FOR HARSH NUCLEAR ENVIRON.
DUE BY: 12/6/93 SEE LOG#93362.
93429 FGE 10/18/93 9310290090 SRXB: R.JONES PACIFIC G&E/DIABLO CANYON 1 REPORTS HEAT FLUX HOT CHANNEL FACTOR w120 PENALTY OF 2% AS BEING POTENT NONCONSERV DUE TO OVERSIGHT BY WEST. IN NOT REVISING METHODOLOGY TO ACCOUNT FOR CERTAIN DUE BY: 1/10/94 FACTORS.WEST PROVIDED INTERIM METHOD. TO CORRECT.
93430 CPL 11/19/93 RVIB:S.MATTHEWS CAROLINA PAL REPORTS LACK OF COMPLIANCE OF LOCATION OF SPC0 INFO: SRXB AS-LOADEDGADOLINIA PINS IN FUEL ASSEMBLY RELATIVE TO DESIGN SPECS. CALCS INDICATE HOT CHANNEL FACTORS CAN EXCEED TECH SPEC DUE BY: 1/24/94 REQMNTS BY 9% ERROR OCCURRED WITHIN SIEMENS DUE TO INADQT COMMUN.
93431 PPL 11/21/93 EMCB:STROSNIDER PENNSYLVANIA P&L & GRAND GULF REPORT FAILURES OF JET PUMP ENOP HOLD-DOWN BEAMS DUE TO IGSCC THAT CAN CAUSE DAMAGE TO OTHER G080 REACTOR INTERNALS DUE TO HYDRAULIC FORCES. GE RECOItENDS EARLY DUE BY: 1/24/94 REPLACEMENT TO AVOID DAMAGE. SEE LOG#93437 93432 GPU 11/17/93 RVIB:U.POTAPOVS GPU NUCLEAR REPORTS REPLACEMENT OF MANUAL DECLUTCH LEVERS ON L200 EIGHT VALVE ACTUATORS WITH THE RESULT THAT ELECTRICAL OPERATION WAS IMPAIRED DUE TO PAINT IN A MACHINED HOLE & USE OF A HAMMER TO DUE BY: 1/24/94 TAP LEVER ONTO ITS SHAFT.
Page No.
3 11/30/93 10 CFR PART 21 TRACKING SYSTEM VENDOR INSPECTION BRANCH DIVISION OF REACTOR INSPECTION AND LICENSEE PERFORMANCE LOG 0 SUB REPORT ACCESSION ASSIGNED CLOS DESCRIPTION AND DATE NUMBER OUT VEND CODE CODE 93433 ENDP 11/22/93 RVIB:U.POTAPOVS GRAND GULF REPORTS FAILURE OF HPCS VALVE DURING TESTING. VALVE YOKE BROKE & VALVE DISC SEPARATED FROM VALVE STEM. GLOBE VALVE WITH MNFR NOT PRESENTLY IDENTIFIED. LICENSEE SUSPECTS DISC BECAME DUE BY: 1/24/94 COCKED DURING CLOSING PRODUCING OVERSTRESS.
93434 IPC 10/08/93 RVIB:U.POTAPOVS CLINTON REPORTS SHEARING OF MOTOR PINION KEY ON HPCS INJECTION INFO: EMEB VALVE ACTUATOR. VALVE WAS STILL OPERABLE SINCE PINION SEIZED ON THE SHAFT. HOWEVER, POTENTIAL EXISTS FOR VALVE MALOPERATION.
DUE BY: 1/24/94 ENGRG EVAL BY CLINTON PROVIDED TO NRC ON 11/22/93.
93435 TVA 11/18/93 SPLB:McCRACKEN TENNESSEE VALLEY AUTHORITY REPORTS MISMATCHED CAPACITIES OF T274 COMP/DRYER ARRANGEMENT BY VENDOR THAT WILL RESULT IN INCREASED C629 MOIST IN DOWNSTREAM PORTIONS OF SYSTEM INCLUDING EDG AIR START DUE BY: 1/24/94 SYSTEM. SYSTEM DESIGNED BY TDI NOW COOPER INDUSTRIES.
93436 W120 11/12/93 9311170058 EMEB:
C.WU WESTINGHOUSE PROVIDES FINAL UPDATE & CLOSEOUT OF REACTOR VESSEL PLENUM ANOMALY CHARACTERIZED BY RCS TEMP INC/DEC IN FOUR LOOP PLANTS. FATIGUE PERF DUE TO ALTERNATING THERMAL STRESSES DUE BY: 1/24/94 DETERMINED TO BE ACCEPTABLE. SEE LOG#92117/93158.
93437 PPL 11/23/93 EMCB:STROSNIDER SUSQUEHANNA 1 REPORTS THAT 20 JET PUMP HOLD DOWN BEAMS WILL BE ENOP REPLACED BASED ON GE's INFO THAT THE DESIGN IS SAME AS GRAND G080 GULF.
NO ASSURANCE THAT INTEGRITY COULD BE MAINTAINED DURING NEXT DUE BY: 1/24/94 OPERATING CYCLE. SEE LOG093431.
93438 F120 11/11/93 9311180054 RVIB: R.WILSON CTBI FISCHER & PORTER CO PROVIDES INFO ON A DEVIATION FOUND IN TESTING CLAMP-ON ULTRASONIC FLOMETERS ON 12" PIPES. TEST RESULTS AFFECTED BY UPSTREAM BUTTERFLY VALVE. SEE LOG#93416/93417.
DUE BY: 1/3/94 93439 APS 11/10/93 RVIB: ALEXANDER ARIZONA PS/PALO VERDE 3 REPORTS FAILURE OF REACTOR TRIP BREAKER W120 "C" TO CLOSE & RESET. BREAKER IS WESTINGHOUSE MODEL DS-206.
FAILURE ANALYSIS UNDERWAY.
DUE BY: 1/24/94 93440 G080 11/01/93 RVIB: K.NAIDU GENERAL ELECTRIC REPORTS EXPRNCNG PROS WITH GE CR2940 SWITCH ASSBLES DURING FACTRY TESTNG AS EVIDENCED BY FAILURE OF CYLINDER LOCK SELECTOR SPRING TO RETURN SWITCH FULLY TO ITS ORIGINAL DUE BY: 1/24/94 POSITION BY SPRING FORCE. TESTING UNDERWAY. 0 FIELD FAILURES RPTD.
93441 NNE 10/29/93 9311050158 SRXB: R.JONES MILLSTONE 3 DESCRIBES NON-CONSERV IN ANALYSIS OF ECCS ACTUATION W120 THAT COULD RESULT IN A SOLID PRESS & FAILURE OF SVs TO RECLOSE &
SBLOCA. WESTINGHOUSE PERFORMING REANALYSIS. SEE LDG# 93368.
DUE BY: 12/7/93
Page N.
- 4.
11/30/03 10 CFR PART 21 TRACKING SYSTEM VENDOR INSPECTION BRANCH DIVISION OF REACTOR INSPECTION AND LICENSEE PERFORMANCE LOG # suB REPORT ACCESSION ASSIGNED CLOS DESCRIPTION AND DATE NUMBER OUT VEND CODE CODE 93442 W120 10/27/93 9311090158 SRXB: F.ORR WESTINGHOUSE PROVIDES FINAL UPDATE ON ECCS RECIRCULATION PHASE DESIGN ISSUES REGARDING EFFECT OF EDG OPERATING AT TECH SPEC LOWER SPEED LIMIT ON ABILITY TO HANDLE SI LOADS. SEE DUE BY: 1/26/94 LOG#93227/93358.
Duke Power Company Catawba Nuclear Station McGuire Nuclear Station Oconee Nuclear Station cc:
Dr. John M. Barry Mr. M. E. Patrick Mecklenburg County Compliance Department of Environmental Duke Power Company Protection Oconee Nuclear Site 700 N Tryon Street P. 0. Box 1439 Charlotte, North Carolina 29202 Seneca, South Carolina 29679 County Manager of Mecklenburg County Mr. Robert B. Borsum 720 East Fourth Street Babcock & Wilcox Charlotte, North Carolina 28202 Nuclear Power Division Suite 525 Mr. Robert 0. Sharp 1700 Rockville Pike Compliance Rockville, Maryland 20852 Duke Power Company McGuire Nuclear Site Manager, LIS 12700 Hagers Ferry Road NUS Corporation Huntersville, North Carolina 28078 2650 McCormick Drive, 3rd Floor Clearwater, Flordia 34619-1035 Senior Resident Inspector c/o U.S. Nuclear Regulatory Senior Resident Inspector Commission U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Route 2, Box 610 Huntersville, North Carolina 28078 Seneca, South Carolina 29678 Mr. Dayne H. Brown, Director Mr. David L. Rehn Department of Environmental Vice President, Catawba Site Health and Natural Resources Duke Power Company Division of Radiation Protection 4800 Concord Road P. 0. Box 27687 York, South Carolina 29745 Raleigh, North Carolina 27611 Mr. T. C. McMeekin Office of Intergovernmental Vice President, McGuire Site Relations Duke Power Company 116 West Jones Street 12700 Hagers Ferry Road Raleigh, North Carolina 27621 Huntersville, North Carolina 28078 County Supervisor of Oconee County Walhalla, South Carolina 27621 Mr. J. W. Hampton Vice President, Oconee Site Duke Power Company P. 0. Box 1439 Seneca, South Carolina 29679
McGuire Nuclear Station Duke Power Company Catawba Nuclear Station cc:
Mr. Z. L. Taylor North Carolina Electric Membership Regulatory Compliance Manager Corporation Duke Power Company P. 0. Box 27306 4800 Concord Road Raleigh, North Carolina 27611 York, South Carolina 29745 Senior Resident Inspector North Carolina Municipal Power Route 2, Box 179 N Agency Number 1 York, South Carolina 29745 1427 Meadowwood Boulevard P. 0. Box 29513 Mr. David L. Rehn Raleigh, North Carolina 27626-0513 Vice President, Catawba Site Duke Power Company County Manager of York County 4800 Concord Road York County Courthouse York, South Carolian 29745 York, South Carolina 29745 Mr. T. C. McMeekin Richard P. Wilson, Esquire Vice President, McGuire Site Assistant Attorney General Duke Power Company South Carolina Attorney General's 12700 Hagers Ferry Road Office Huntersville, North Carolina 28078 P. 0. Box 11549 Columbia, South Carolina 29211 Piedmont Municipal Power Agency 121 Village Drive Greer, South Carolina 29651 Saluda River Electric P. 0. Box 929 Laurens, South Carolina 29360 Max Batavia, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201