October 17, 1994 Duke Power Company ATTN:
Mr. J. W. Hampton Vice President Oconee Site P. 0. Box 1439 Seneca, SC 29679 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- OCONEE NUCLEAR STATION This refers to the management meeting conducted in the NRC Region II office on September 29, 1994, to discuss the Keowee Management Plan. A list of attendees and a copy of your presentation handout are enclosed.
Your presentation was beneficial, in that it provided the NRC staff with a good overview of your plan to upgrade/maintain Keowee-related systems and components to assure reliable emergency power to the Oconee Nuclear Station.
As this endeavor is of considerable interest to the NRC, we request that your detailed plan be made available for review and a followup meeting be scheduled before the end of the year. To facilitate this request, we will make the necessary arrangements in the near future.
In accordance with 10 CFR 2,790 of the NRC's "Rules of Practice", a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, Original signed by Bruce A. Boger, Acting Director Division of Reactor Projects Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55
Enclosures:
- 1. List of Attendees
- 2. Licensee Presentation Handout cc w/encls:
Mr. J. E. Burchfield Compliance Duke Power Company P. 0. Box 1439 Seneca, SC 29679 cc w/encls cont'd:
(See page 2) 9411070176 941017 PDR ADOCK 05000269 OFFICIAL COPY P
DPC 2
cc w/encls cont'd:
Mr. A. V. Carr, Esq.
Duke Power Company 422 South Church Street Charlotte, NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Mr. Robert B. Borsum Babcock and Wilcox Company Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Mr. J. Michael McGarry, III, Esq.
Winston and Strawn 1400 L Street, NW Washington, D. C. 20005 Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 Mr. Max Batavia, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Manager, LIS NUS Corporation 2650 McCormick Drive Clearwater, FL 34619-1035 Mr. G. A. Copp Licensing -
EC050 Duke Power Company P. 0. Box 1006 Charlotte, NC 28201-1006 Ms. Karen E. Long Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 Distribution w/encls:
(See page 3
DPC 3
Distribution w/encls:
L. A. Wiens, NRR R. Carroll, RH M. V. Sinkule, RH G. A. Hal1strom, RH PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 610 Seneca, SC 29672 SEND OFC RII:DRP RII:DRP RH I
RH:*%
TO NAME RCarrolI MSinkuleA AGibson PDR?
DATE 10/ /5 /94 10/ (
/94 09/ \\'
/94
/
/94
/
/94 Yes COPY No Yes No Yes No Yes No Yes No N
ICL O CP D
OFFICIAL RECORD COPY DOCUMENT NAME:
G:\\OCOMTSUM.94
ENCLOSURE 1 LIST OF ATTENDEES NRC Attendees S. Ebneter, Regional Administrator, Region II (RH)
B. Boger, Acting Director, Division of Reactor Projects (DRP), Ru A. Gibson, Director, Division of Reactor Safety (DRS), RH B. Mallett, Acting Deputy Director, DRS, RH M. Sinkule, Chief, DRP Branch 3, RII M. Shymlock, Chief, Plant Systems Section (PSS), DRS, RH L. Wiens, Project Manager, Project Directorate 11-3, Office of Nuclear Reactor Regulation P. Harmon, Senior Resident Inspector - Oconee, DRP, RH R. Carroll, Project Engineer, DRP Branch 3, Section 3A, RH G. Tracy, Region II Coordinator - Office of Executive Director for Operations S. Rudisail, Reactor Engineer, PSS, DRS Duke Power Company Attendees J. Hampton, Vice President, Oconee Nuclear Station (ONS)
J. Davis, Manager, Engineering (ONS)
D. Murdock, Manager, Major Projects, Electrical Support Services (ESS)
M. Austin, Project Manager, ESS C. Little, Manager, Electrical Engineering, ONS D. Coyle, Manager, Mechanical.Nuclear Systems, ONS T. Ledford, Manager, Electrical Power Systems, ONS E. Burchfield, Manager, Regulatory Compliance, ONS M. Bailey, Regulatory Compliance Engineer, ONS
ENCLOSURE 2 AGENDA EMERGENCY POWER ACTIVITY IllSTORY EMERGENCY POWER STATUS EMERGENCY POWER PROJECT DISCUSSIONS
HISTORY OF EMERGENCY POWER ACTIVITIES INITIATED DESIGN BASIS DOCUMENTATION PROGRAM (1989)
MCGUIRE EDSFI FINDINGS GENERIC APPLICABIIlITY REVIEW (6/91)
CATAWBA EDSFI FINDINGS GENERIC APPLICABILITY REVIEW (3/92)
OCONEE ELECTRICAL DISTRIBUTION SITA (4/92)
OCTOBER 1992 IOSS OF POWER EVENT (10/92)
OCONEE EDSFI (2/93)
MANAGEMENT MEETING WITH NRC TO PRESENT UPDATE OF 10/92 EVENT COMMITMENTS (3/93)
COMPLETED MAJOR WORK ACTIVITIES KEOWEE ELECTRICAL SINGLE FAILURE ANALYSIS KEOWEE GOVERNOR SINGLE FAILURE ANALYSIS INTEGRATED TESTING OF OVERHEAD EMERGENCY POWER PATH JOB PERFORMANCE MEASURES DEVELOPED FOR KEOWEE FAILURE SCENARIOS REVIEW OF KEOWEE AGAINST PAST NRC, OEP, AND INPO ITEMS EMERGENCY POWER DESIGN BASIS DOCUMENTS-
KEOWEE PRA STATUS PLANT FAMILIARIZATION COMPLETE 2/94 MEETING WITH NRC 5/94 SYSTEM MODEL DEVELOPED 6/94 RELIABILITY DATA DEVELOPEI) 6/94 FAULT TREE MODELS SOLVED 7/94 MEETING WITH NRC 7/94 ANALYSIS OF RESULTS COMPLETE 9/94 MEETING WITH NRC 10/94 DOCUMENTATION IN PROGRESS 12/94 PEER REVIEW 3/95 ACTIONS 6/95
U keowee Unit i KEOWEE RELIABILITY i,
5 Keowee Uni 2 100.00%
41 90.00o 80.00%
70.00%
60.00%
-0 50.00%
40.00%
- 30. 00%
20.00%
10.00%
0 00%
Mar-93 Jun-93 Sep-93 Dec-93 Mar-94 Jn-94 Aug-94 Quarter Page 1
EMERGENCY POWER PROJECT
SUMMARY
CATEGORY 1: DESIGN AND TEST ACTIVITIES (6/95)
CATEGORY 2: OPERATION AND MAINTENANCE ENHANCEMENT ACTIVITIES (11/95)
CATEGORY 3: STATION MODIFICATIONS AND MINOR MODIFICATIONS (TBD)
CATEGORY 4: DRAWING AND DOCUMENT ACTIVITIES (11/95)
CATEGORY 1: I)ESIGN AND TEST ACTIVITIES DESIGN BASIS DOCUMENTS EQUIPMENT AND SYSTEM TESTS CALCULATIONS DESIGN STUDIES/INSPECTIONS/OEP SEISMIC QUALIFICATION UTILITIES GROUP ITEMS PROBABILISTIC RISK ASSESSMENT ITEMS SET POINT DOCUMENTS
CATEGORY 2: OPERATION AND MAINTENANCE ENIHlANCEMENT ACTIVITIES PLANT MAINTENANCE PROGRAM SPARE PARTS PROGRAM QUALITY ASSURANCE PROGRAM
CATEGORY 3: STATION MODIFICATIONS AND MINOR MODIFICATIONS STATION MODIFICATIONS MINOR MODIFICATIONS
CATEGORY 4: DRAWING AND DOCUM INT ACTIVITIES DRAWING AND MANUAL UPDATES VALVE CROSS REFERENCE LIST EQUIPMENT AND DEVICE LABELS