ML16154A309

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 920717 at Region II Ofc to Conduct Enforcement Conference Re Circumstances Surrounding 920508 Unit 1 Reactor Trip & Unit 1 Operation W/Only One Operable Flow Path on 920511-24
ML16154A309
Person / Time
Site: Oconee  
Issue date: 06/27/1992
From: Belisle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9207170006
Download: ML16154A309 (3)


Text

JUN 27 1992 NOTICE OF SIGNIFICANT MEETING Name of Licensee: Duke Power Company Name of Facility:

Oconee Units 1, 2 and 3 Docket Nos.:

50-269, 50-270 and 50-287 Date and Time of Meeting:

July 17, 1992, at 10:00 a.m.

Location of Meeting:

NRC Region II Office, Atlanta, Georgia Purpose of Meeting: Enforcement Conference to discuss the circumstances associated with the May 8, 1992, Unit 1 reactor trip in which one of the two Emergency Feedwater System flow paths required by the Technical Specifications was not operable. Also, the operation of Unit 1 from May 11 through May 24, 1992, with only one of the two Emergency Feedwater System flow paths operable will be discussed.

RII Cognizant Division:

Division of Reactor Projects NRC Attendees:

S. D. Ebneter, Regional Administrator, Region II (RII)

L. A. Reyes, Deputy Regional Administrator, RII J. R. Johnson, Acting Director, Division of Reactor Projects (DRP),

R-1I A. F. Gibson, Director, Division of Reactor Safety (DRS), RII J. P. Stohr, Director, Division of Radiation Safety and Safeguards, RII D. B. Matthews, Director, Project Directorate 11-3, Office of Nuclear Reactor Regulation (NRR)

G. R. Jenkins, Director, Enforcement and Investigations Coordination Staff, RII C. F. Evans, Regional Counsel, RII A. R. Herdt, Chief, Reactor Projects Branch 3, DRP, RII G. A. Belisle, Chief, Reactor Projects Section 3A, DRP, RII L. A. Wiens, Project Manager, Project Directorate 11-3, NRR W. K. Poertner, Resident Inspector, Oconee, DRP, RII W. H. Miller, Jr., Project Engineer, Project Section 3A, DRP, RII Licensee Attendees:

J. W. Hampton, Vice President, Oconee Nuclear Site (ONS)

H. B. Barron, Station Manager, ONS R. L. Sweigart, Operations Superintendent, ONS M. E. Patrick, Regulatory Compliance, ONS 9207170006 920627 PDR ADOCK 05000269 S

PDR

w JUN 27 1992 Notice of Significant Meeting 2

NOTE:

Attendance by NRC personnel at this Enforcement Conference should be made known by July 14, 1992, via telephone call to W. H. Miller, Jr. at (404) 331-4198.

Approved:

George A. Belisle, Chief Reactor Projects Section 3A Division of Reactor Projects Distribution:

J. H. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. L. Thompson Jr., Deputy Executive Director for Nuclear Materials Safety Safeguards and Operation Support J. R. Goldberg, Deputy Assistant General Counsel for Enforcement J. Lieberman, Director Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation (NRR)

J. G. Partlow, Associate Director, NRR D. B. Matthews, Director, Project Directorate 11-3, NRR L. A. Wiens, Project Manager, Oconee, NRR J. F. Wechselberger, Regional Coordinator, EDO bcc:

S. D. Ebneter J. R. Johnson A. F. Gibson J. P. Stohr G. R. Jenkins K. M. Clark All NRC Attendees on Notice Docket File FOR PREVIOUS CONCURRENCE SEE ATTACHED RII RII RII

  • WMiller
  • AHerdt JJohnson 06/

/92 06/

/92 06/

/92 06/Z /92 R!

Ra 06//

G9i i CEva s Q6/, 4 /92 06/Z /92 06/

/92

Notice of Significant Meeting 2

NOTE:

Attendance by NRC personnel at this Enforcement Conference should be made known by July 14, 1992, via telephone call to W. H. Miller, Jr. at (404) 331-4198.

Approved:

George A. Belisle, Chief Reactor Projects Section 3A Division of Reactor Projects Distribution:

J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. Thompson, Deputy Executive Director of Nuclear Materials

Safety, Safeguards and Operations Support J. Goldberg, Deputy Assistant General Counsel for Enforcement J. Lieberman, Director Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation (NRR)

J. G. Partlow, Associate Director, NRR D. B. Matthews, Director, Project Directorate 11-3, NRR L. A. Wiens, Project Manager, Oconee, NRR J. F. Wechselberger, Regional Coordinator, EDO bcc:

S. D. Ebneter J. R. Johnson A.

F. Gibson J. P. Stohr G. R. Jenkins K. M. Clark All NRC Attendees on Notice Docket File RI RII RII RII WM U.,r AHeEt JJohnson AGibson 06/,p /92 06/9- /92 06/

/92 06/

/92 RII RII RII PStohr GJenkins CEvans 06/

/92 06/

/92 06/

/92