ML16152A372
| ML16152A372 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/18/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | Harold Denton, Stozl J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16152A373 | List: |
| References | |
| NUDOCS 8410290235 | |
| Download: ML16152A372 (2) | |
Text
REGULATURY FORMATION DISTRIBUTION SY (RIDS)
ACCESSION NBR:8410290235 DUC.DATE: 84/10/18 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269 AUTHNAME AUTHUR AFFILIATION TUCKERH.B.
Duke Power Co.
RECIP.NAME RECIPIENT AFFILIATION DENTUNH.R, Office of Nuclear Reactor Regulationt Director STOZLJ.F.
Operating Reactors Branch 4
SUBJECT:
Forwards "Analyses of Capsule OCI-ADuke Power CoOconee Nuclear Station Unit 1," Rept results indicate no change in Tech Specs requ I red.RD7 DISTRtIbUTIUN CO DI4-A01* ({CMIIES R EIVED:LfTR._j ENCL4 SIZE:--..
TITLE: OR Submittal: Reactor Vesse Overpressurization NOTES:AEOD/Ornstein:1cy, 05000269 OL:02/06/73 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR 0R84 BC 01 7
7 INTERNAL: ADM/LFMB 1
0 ELD/HDS4 1
0 NRR/DE/MTEB 08 1
1 NRR/DL/ORAB 11 1
1 NRR/oSI/AEB 1
1 N'
1 1
NRR/DST DIR 1
1 PEG FILE' 04 1
1 RGN2 1
1 EXTERNAL:
ACRS 12 6
LPDR 03 1
1 NRC PDR 02 1
1 NSIC 05 1
1 NTIS 1
1 NOTES:
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 27 ENCL 25
DUKE POWER CoMPANY P.O. BOX 33189 CHARLOTTE, N.C. 28242 HAL B. TUGKER TELEPHONE VICE PRESENT (704) 373-4531 NUGLEARPRODUCTION October 18, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Mr. John F. Stolz, Chief Operating Branch No. 4
Subject:
Oconee Nuclear Station Docket Nos. 50-269, -270, -28.7
Dear Sir:
Pursuant to Technical Specification 4.2.4 and in accordance with 10 CFR 50, Appendix H, please find attached a report (BAW-1837, August 1984), of the test results of the examination of the third capsule of the Duke Power Company's Oconee Nuclear Station, Unit 1 reactor vessel material surveillance program. The results of the examination has verified that a change in the Technical Specifications is not required.
Very truly yours, Hal B. Tucker PFG:slb Attachment cc:
(w/attachment)
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900.
Atlanta, Georgia 30323 Ms. Helen Nicolaras Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. J. C. Bryant NRC Resident Inspector Oconee Nuclear Station 83410290235 8341018 o