ML16152A255

From kanterella
Jump to navigation Jump to search
Confirms 830809 Mgt Meeting W/Util in Charlotte,Nc to Discuss SALP Board Assessment of Performance from June 1982 - Apr 1983.Proposed Agenda & Notification of Meeting Encl
ML16152A255
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 07/26/1983
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8309190208
Download: ML16152A255 (5)


Text

JUL 26 1983 Duke Power Company ATTN:

Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS This confirms the telephone conversation between N. A. Rutherford, System Engineer, Licensing, and H. C. Dance of my staff concerning a management meeting at your office in Charlotte, North Carolina on August 9, 1983.

We requested this meeting to review the results of the first phase of our annual appraisal of your regulatory performance. The time of the meeting was established as 2:00 p.m. A proposed agenda is enclosed.

Selected NRC managers have met as a part of the NRC's Systematic Assessment of Licensee Performance (SALP) program to discuss your regulatory performance during the period June 1, 1982 through April 30, 1983. The results of this meeting, the SALP Board Assessment, will be forwarded to you approximately one week prior to our meeting.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, R. C. Lewis, Director Division of Project and Resident Programs (SALP Board Chairman)

Enclosure:

Proposed Meeting Agenda cc w/encl:

J. W. Hampton, Station Manager J. C. Rogers, Project Manager M. D. McIntosh, Plant Manager J. T. Moore, Project Manager J. E. Smith, Station Manager 83091902080 830726 allR DOK 5000269 PDR ADOCK PDR

00 Duke Power Company 2

JUL 26 1983 bcc w/encl:

Document Management Branch State of North Carolina Resident Inspectors, Oconee, McGuire, Catawba D. S. Price, RII RII RH RII RII R

TMacArthur:dr MVSinkule AJIgnatonis HCDance R Lewis 7/1

/83 7/1/k

/83 7//

7/1/83

ENCLOSURE PROPOSED MEETING AGENDA Duke Power Company meeting with NRC August 9, 1983, 2:00 p.m.

I.

Opening Remarks James P. O'Reilly II.

Summary of Performance Evaluations Richard C. Lewis III.

Discussion of Evaluations All IV.

Closing Comments James P. O'Reilly

ov t REG~t UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 L 2 6 1983 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:

Duke Power Company Name of Facility:

Oconee Units 1, 2,. and 3; McGuire Units 1 and 2; Catawba Units 1 and 2 Docket Nos.:

50-269, 50-270, 50-287, 50-369, 50-370, 50-413, and 50-414 Date and Time of Meeting: August 9, 1983 at 2:00 p.m.

Location of Meeting:

Corporate Offices, Wachovia Building, Room 1910, Charlotte, North Carolina Purpose of Meeting: Discussion of SALP Board Assessment NRC Attendees: James P. O'Reilly, Regional Administrator R. C. Lewis, Director, Division of Project and Resident Programs, (DPRP) (SALP Board Chairman)

J. A. Olshinski, Director, Division of Engineering and Operational Programs, RI H. C. Dance, Chief, Projects Branch 2, DPRP, RII J. Philip Stohr, Director, Division of Emergency Preparedness and Materials Safety Programs J. C. Bryant, Senior Resident Inspector, Oconee, DPRP, RII W. T. Orders, Senior Resident Inspector, McGuire, DPRP, RII P. K. VanDoorn, Senior Resident Inspector, Catawba, DPRP, RII D. P. Falconer, Resident Inspector, Oconee, DPRP, RII E. G. Adensam, Chief, Licensing Branch 4 DL, NRR K. N. Jabbour, Project Manager, Catawba, DL, NRR R. A. Birkel,, Project Manager, McGuire, DL, NRR J. Suermann, Project Manager, Oconee, DL, NRR Licensee Attendees: E. C. Thies, Executive Vice President, Power Operations W. H. Owen, Executive Vice President, Engineering and Construction L. C. Dale, Vice President, Design Engineering R. L. Dick, Vice President, Construction G. W. Greer, Manager, Quality Assurance H. B. Tucker, Vice President, Nuclear Production G. E. Vaughn, General Manager, Nuclear Stations J. M. Hart, Manager, Project Control J. W. Hampton, Station Manager M. S. McIntosh, Plant Manager J. E. Smith, Station Manager N. A. Rutherford, Systems Engineering, Licensing

2 JUL 2 6 1983 NOTE:

Attendance by NRC personnel at this NRC/Licensee meeting should be made known by 1:00 p.m., August 8, 1983 via telephone call to D. S. Price FTS:- 242-4198.

Distribution:

Victor Stello; Jr., DEDROGR R. C DeYoung, Director, IE H. R. Denton, Director, NRR C. J. Heltemes, Jr., Director, AEOD J. G. Davis, Director, NMSS D. G. Eisenhut, Director, NRR Region II Distribution List C Receptionist D. S. Price, RII