ML16148A803

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-269/93-17,50-270/93-17 & 50-287/93-17 & NOV
ML16148A803
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/18/1993
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hampton J
DUKE POWER CO.
Shared Package
ML16148A805 List:
References
EA-93-120, NUDOCS 9307220161
Download: ML16148A803 (3)


See also: IR 05000269/1993017

Text

JUN 1 1993

Docket Nos. 50-269, 50-270, 50-287, 72-4

License Nos. DPR-38, DPR-47,

DPR-55 and SNM-2503

Duke Power Company

ATTN: Mr. J. W. Hampton

Vice President

Oconee Site

P. 0. Box 1439

Seneca, SC 29679

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION (EA 93-120)

(NRC INSPECTION REPORT NOS. 50-269/93-17, 50-270/93-17 AND 50

287/93-17)

This refers to the inspection conducted by P. E. Harmon of this office on May

1 - May 29, 1993. The inspection included a review of activities authorized

for your Oconee facility. At the conclusion of the inspection, the findings

were discussed with those members of your staff identified in the enclosed

inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, 'and observation of

activities in progress.

Based on the results of this inspection, certain activities appeared to be in

violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement actions is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.970 of the NRC's "Rules of Practice", a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

9307220161 930618

PDR ADOCK 05000269

G

PDR

JUN 18 1993

Duke Power Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely,

Alan R. Herdt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC inspection Report

cc w/encls:

M. E. Patrick

Compliance

Duke Power Company

P. 0. Box 1439

Seneca, SC 29679

A. V. Carr, Esq.

Duke Power Company

422 South Church Street

Charlotte, NC 28242-0001

County Supervisor of

Oconee County

Walhalla, SC 29621

Robert B. Borsum

Babcock and Wilcox Company

Nuclear Power Generation Division

1700 Rockville Pike, Suite 525

Rockville, MD 20852

J. Michael McGarry, III, Esq.

Winston and Strawn

1400 L Street, NW

Washington, D. C. 20005

Office of Intergovernmental Relations

116 West Jones Street

Raleigh, NC 27603

cc:

Continued see -page 3

JUN 18 1993

Duke Power Company

3

cc:

Continued

Heyward G. Shealy, Chief

Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

Manager, LIS

NUS Corporation

2650 McCormick Drive

Clearwater, FL 34619-1035

G. A. Copp

Licensing - ECO50

Duke Power Company

P. 0. Box 1006

Charlotte, NC 28201-1006

Karen E. Long

Assistant Attorney General

N. C. Department of Justice

P. 0. Box 629

Raleigh, NC 27602

bcc w/encl:

L. Wiens, NRR

W. Miller, RH

M. S. Lesser, RH

A. R. Herdt, RH

S. J. Vias, RH

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 2, Box 610

Seneca, SC 29678

RIr

Ruese

RIn k

  • /1/9306eP9