ML16148A803
| ML16148A803 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/18/1993 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hampton J DUKE POWER CO. |
| Shared Package | |
| ML16148A805 | List: |
| References | |
| EA-93-120, NUDOCS 9307220161 | |
| Download: ML16148A803 (3) | |
See also: IR 05000269/1993017
Text
JUN 1 1993
Docket Nos. 50-269, 50-270, 50-287, 72-4
Duke Power Company
ATTN: Mr. J. W. Hampton
Vice President
Oconee Site
P. 0. Box 1439
Seneca, SC 29679
Gentlemen:
SUBJECT:
NOTICE OF VIOLATION (EA 93-120)
(NRC INSPECTION REPORT NOS. 50-269/93-17, 50-270/93-17 AND 50
287/93-17)
This refers to the inspection conducted by P. E. Harmon of this office on May
1 - May 29, 1993. The inspection included a review of activities authorized
for your Oconee facility. At the conclusion of the inspection, the findings
were discussed with those members of your staff identified in the enclosed
inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, 'and observation of
activities in progress.
Based on the results of this inspection, certain activities appeared to be in
violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement actions is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.970 of the NRC's "Rules of Practice", a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
9307220161 930618
PDR ADOCK 05000269
G
JUN 18 1993
Duke Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Alan R. Herdt, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
2. NRC inspection Report
cc w/encls:
M. E. Patrick
Compliance
Duke Power Company
P. 0. Box 1439
Seneca, SC 29679
A. V. Carr, Esq.
Duke Power Company
422 South Church Street
Charlotte, NC 28242-0001
County Supervisor of
Oconee County
Walhalla, SC 29621
Robert B. Borsum
Babcock and Wilcox Company
Nuclear Power Generation Division
1700 Rockville Pike, Suite 525
Rockville, MD 20852
J. Michael McGarry, III, Esq.
Winston and Strawn
1400 L Street, NW
Washington, D. C. 20005
Office of Intergovernmental Relations
116 West Jones Street
Raleigh, NC 27603
cc:
Continued see -page 3
JUN 18 1993
Duke Power Company
3
cc:
Continued
Heyward G. Shealy, Chief
Bureau of Radiological Health
South Carolina Department of Health
and Environmental Control
2600 Bull Street
Columbia, SC 29201
Manager, LIS
NUS Corporation
2650 McCormick Drive
Clearwater, FL 34619-1035
G. A. Copp
Licensing - ECO50
Duke Power Company
P. 0. Box 1006
Charlotte, NC 28201-1006
Karen E. Long
Assistant Attorney General
N. C. Department of Justice
P. 0. Box 629
Raleigh, NC 27602
bcc w/encl:
L. Wiens, NRR
W. Miller, RH
M. S. Lesser, RH
A. R. Herdt, RH
S. J. Vias, RH
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 610
Seneca, SC 29678
RIr
Ruese
RIn k
- /1/9306eP9