ML16148A673
| ML16148A673 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/16/1992 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hampton J DUKE POWER CO. |
| Shared Package | |
| ML16148A674 | List: |
| References | |
| NUDOCS 9209220197 | |
| Download: ML16148A673 (4) | |
See also: IR 05000269/1992018
Text
SEP 16 1992
Docket Nos. 50-269, 50-270, 50-287 and 72-4
License Nos. DPR-38, DPR-47, DPR-55 and SNM-2503
Duke Power Company
ATTN: MR. J. W. Hampton
Vice President
Oconee Site
P.O. Box 1439
Seneca, SC 29679
Gentleman:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-269/92-18, 50-270/92-18
AND 50-287/92-18)
This refers to the inspection conducted by P. E. Harmon during
the period July 26 - August 22, 1992.
The inspection included a
review of activities authorized for your Oconee facility. At the
conclusion of the inspection, the findings were discussed with
those members of your staff identified in the enclosed inspection
report.
Areas examined during the inspection are identified in the
report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observation of activities in
progress.
Based on the results of this inspection, certain activities
appeared to be in violation of NRC requirements, as specified in
the enclosed Notice of Violation (Notice). We are concerned
about this violation because it indicates that problems continue
in the area of procedural compliance.
You are required to respond to this letter and should follow the
instructions specified in the enclosed Notice when preparing your
response. In your response, you should document the specific
actions taken and any additional actions you plan to prevent
recurrence. After reviewing your response to this Notice,
including your proposed corrective actions and the results of
future inspections, the NRC will determine whether further NRC
enforcement action ensure compliance with NRC regulatory
requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice",
a copy of this letter and its enclosures will be placed in the
NRC Public Document Room.
9209220197 920916
PDR ADOCK 05000269
G
SEP 16 1992
.
Duke Power Company
2
The responses directed by this letter and the enclosed Notice are
not subject to the clearance procedures of the Office of
Management and Budget as required by the Paperwork Reduction Act
of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please
contact us.
Sincerely,
Alan R. Herdt, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
M. E. Patrick
O Compliance
Duke Power Company
P. 0. Box 1439
Seneca, SC 29679
A. V. Carr, Esq.
422 South Church Street
Charlotte, NC 28242-0001
County Supervisor of
Oconee County
Walhalla, SC 29621
Robert B. Borsum
Babcock and Wilcox Company
Nuclear Power Generation Division
1700 Rockville Pike, Suite 525
Rockville, MD 20852
J. Michael McGarry, III, Esq.
1400 L Street, NW
Washington, D.C. 20005
Office of Intergovernmental Relations
116 West Jones Street
Raleigh, NC 27603
cc: continued see page 3
SEP 16 1992
Duke Power Company
3
cc: continued
Heyward G. Shealy, Chief
Bureau of Radiological Health
South Carolina Department of Health
and Environmental Control
2600 Bull Street
Columbia, SC 29201
Manager, LIS
NUS Corporation
2650 McCormick Drive
Clearwater, FL 34619-1035
R. L. Gill
Nuclear Production Department
Duke Power Company
P. 0. Box 1007
Charlotte, NC 28201-1007
Karen E. Long
Assistant Attorney General
N. C. Department of Justice
P. 0. Box 629
Raleigh, NC 27602
'
Duke Power Company
4
bcc w/encl:
L. Wiens, NRR
W. Miller, RII
G. A. Belisle, RII
A. R. Herdt, RII
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 610
Seneca, SC 29678
RII
RII AB e
09/
/909
/2