ML16148A328
| ML16148A328 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/30/1980 |
| From: | Check P Office of Nuclear Reactor Regulation |
| To: | Reid R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16148A327 | List: |
| References | |
| NUDOCS 8007170656 | |
| Download: ML16148A328 (1) | |
Text
Distribution:
Docket file NRC PDR RSB Rdg.
Docket No. 50-270 NRR Rdg.
MEMORANDUM FOR: Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors FROM:
Paul S. Check, Chief Reactor Safety Branch Division of Operating Reactors
SUBJECT:
OCONEE UNIT 2 CYCLE 5 RELOAD AND ASSOCIATED TECHNICAL SPECIFICATION CHANGES PLANT NAME:
Oconee Unit 2 TACS:
12512 DOCKET-NUMBER:
50-270 RESPONSIBLE BRANCH AND PROJECT MANAGER:
ORB#5, M. Fairtile REVIEW BRANCH:
Reactor Safety REVIEW STATUS:.- Complete Enclosed is the Reactor Safety Branch evaluation of the Oconee Unit 2 fuel load for Cycle 5 operation arid the associated Technical Specifi cations.
The review has considered the effects of normal operation,
-anticipated transients, and posulated accidents.
The licensee (Duke Power Company) has not submitted an acceptable Startup Test Program as of the date of this memo.
However, one is promised for NRC's review prior to the startup of Oconee 2. When that program is submitted, an addendum to this report will be issued.
Paul S. Check, Chief Reactor Safety Branch Division of Operating Reactors
Enclosure:
As stated cc w/enclosure:
D. Eisenhut_
S. Weiss T. Novak M. Fairtile G. Lainas K. Kniel V. Panciera S. Sands RSB:DOR RSB:DO 0 1-9 -
i s27 4 5 9 "T
249~~~
Sands:kb.................
.. S274s:
SWeiss...
PCheck.
Nac Pooe 21s 19-76) secM e24e l?.5 GOVERNMENT PRINTWGOFFCE.197M9349