ML16148A250
| ML16148A250 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/16/1979 |
| From: | Fairtile M Office of Nuclear Reactor Regulation |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7909180317 | |
| Download: ML16148A250 (3) | |
Text
P9 August 169 1979 Dockets Nos..
50-269 50-270 and.
MEMORANDUM FOR: Robert V. Reid 'Chief, Operating Reactors Branch I DOR FROM:
1Morton Fairtile, Project Manager OR8#4:DOR
SUBJECT:
- FORTHCOMING MEETING WITH DUKE POWER COMPANY - OCONEE NUCLEAR STATION, -UNITS NOS. 1, 2 AND 3 TIME & DATE.
10:30 a.m., Wednesday August 29, 1979, LOCATION:
P-500
-PURPOSE:
Discussion of Oconee Coritaiunment Purge and Vent Valve Design, Opereting Re quirements, aid Associated Electrical Override Circuitry Design.
PARTICIPANTS:
.NRC M. Fairtile, E. Reeves, J. T. Beard J. Rosenthal, R. Emch, L. Nichols,.J. Zudans DPC R., Gill Morton Fairti e, Project Manager Operating Reactors.Branch #4 Division of Operating Reactors
Enclosure:
Agenda
.UR N A M.
DAT IF R
318 (0-76 1 M 02/0 U.S. aOEn IMUnNunT PnsmTING OPPICIE: 1978 - 285 -*760 I
pR REG~
9 o0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 16, 1979 Dockets Nos.:
50-269 50-270 and 50-287 MEMORANDUM FOR: Robert W. Reid, Chief, Operating Reactors Branch #4, DOR FROM:
Morton Fairtile, Project Manager, ORB#4:DOR
SUBJECT:
FORTHCOMING MEETING WITH DUKE POWER COMPANY - OCONEE NUCLEAR STATION, UNITS NOS. 1, 2 AND 3 TIME & DATE:
10:30 a.m., Wednesday August 29, 1979 LOCATION:
P-500 PURPOSE:
Discussion of Oconee Containment Purge and Vent Valve Design, Operating Re quirements, and Associated Electrical Override Circuitry Design.
PARTICIPANTS:
NRC M. Fairtile, E. Reeves, J. T. Beard J. Rosenthal, R. Emch, L. Nichols, J. Zudans DPC R. Gill Morton Fairtile, Project Manager Operating Reactors Branch #4 Division of Operating Reactors
Enclosure:
Agenda
MEETING WITH DUKE POWER COMPANY ON AUGUST 29, 1979 AGENDA
- 1. Duke to present valve and valve actuator data.
- 2. Purge and vent line arrangements., layout drawings.
- 3. Valve procurement specs and test -records for each valve.
- 4. Electrical schematics, control circuitry, ESFAS circuitry which have override, bypass or reset capability.
- 5. Part 100, Part 20 and occupational exposures.