ML16148A250

From kanterella
Jump to navigation Jump to search
Notification of 790829 Meeting W/Util in Bethesda,Md to Discuss Containment Purge & Vent Valve Design,Operating Requirements & Associated Electrical Override Circuitry Design
ML16148A250
Person / Time
Site: Oconee  
Issue date: 08/16/1979
From: Fairtile M
Office of Nuclear Reactor Regulation
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7909180317
Download: ML16148A250 (3)


Text

P9 August 169 1979 Dockets Nos..

50-269 50-270 and.

MEMORANDUM FOR: Robert V. Reid 'Chief, Operating Reactors Branch I DOR FROM:

1Morton Fairtile, Project Manager OR8#4:DOR

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY - OCONEE NUCLEAR STATION, -UNITS NOS. 1, 2 AND 3 TIME & DATE.

10:30 a.m., Wednesday August 29, 1979, LOCATION:

P-500

-PURPOSE:

Discussion of Oconee Coritaiunment Purge and Vent Valve Design, Opereting Re quirements, aid Associated Electrical Override Circuitry Design.

PARTICIPANTS:

.NRC M. Fairtile, E. Reeves, J. T. Beard J. Rosenthal, R. Emch, L. Nichols,.J. Zudans DPC R., Gill Morton Fairti e, Project Manager Operating Reactors.Branch #4 Division of Operating Reactors

Enclosure:

Agenda

.UR N A M.

DAT IF R

318 (0-76 1 M 02/0 U.S. aOEn IMUnNunT PnsmTING OPPICIE: 1978 - 285 -*760 I

pR REG~

9 o0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 16, 1979 Dockets Nos.:

50-269 50-270 and 50-287 MEMORANDUM FOR: Robert W. Reid, Chief, Operating Reactors Branch #4, DOR FROM:

Morton Fairtile, Project Manager, ORB#4:DOR

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY - OCONEE NUCLEAR STATION, UNITS NOS. 1, 2 AND 3 TIME & DATE:

10:30 a.m., Wednesday August 29, 1979 LOCATION:

P-500 PURPOSE:

Discussion of Oconee Containment Purge and Vent Valve Design, Operating Re quirements, and Associated Electrical Override Circuitry Design.

PARTICIPANTS:

NRC M. Fairtile, E. Reeves, J. T. Beard J. Rosenthal, R. Emch, L. Nichols, J. Zudans DPC R. Gill Morton Fairtile, Project Manager Operating Reactors Branch #4 Division of Operating Reactors

Enclosure:

Agenda

MEETING WITH DUKE POWER COMPANY ON AUGUST 29, 1979 AGENDA

1. Duke to present valve and valve actuator data.
2. Purge and vent line arrangements., layout drawings.
3. Valve procurement specs and test -records for each valve.
4. Electrical schematics, control circuitry, ESFAS circuitry which have override, bypass or reset capability.
5. Part 100, Part 20 and occupational exposures.
6. Impact of purge on concurrent LOCA, e.g., NPSH of ECCS pumps.