ML16138A164

From kanterella
Jump to navigation Jump to search
Notification of Inspection (NRC Integrated Inspection Report 05000313/2016003 and 05000368/2016003) and Request for Information
ML16138A164
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/17/2016
From: Vincent Gaddy
Operations Branch IV
To: Jeremy G. Browning
Entergy Operations
References
IR 2016003
Download: ML16138A164 (9)


See also: IR 05000313/2016003

Text

May 17, 2016

Mr. Jeremy Browning, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION

(NRC INTEGRATED INSPECTION REPORT 05000313/2016003 AND

05000368/2016003) AND REQUEST FOR INFORMATION

Dear Mr. Browning:

From July 11 through July 15, 2016, inspectors from the Nuclear Regulatory Commissions

(NRC) Region IV office will perform the baseline biennial requalification inspection at Arkansas

Nuclear One Units 1 and 2, using NRC Inspection Procedure 71111.11B, Licensed Operator

Requalification Program. Experience has shown that this inspection is a resource intensive

inspection both for the NRC inspectors and your staff. In order to minimize the impact to your

onsite resources and to ensure a productive inspection, we have enclosed a request for

documents needed for this inspection. These documents have been divided into three groups.

The first group (Section A of the enclosure) identifies information to be provided prior to the

inspection to ensure that the inspectors are adequately prepared. The second group (Section B

of the enclosure) identifies the information the inspectors will need upon arrival at the site. The

third group (Section C of the enclosure) identifies the items which are necessary to close out the

inspection and are usually sent a few weeks after the team has left the site. It is important that

all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. R. Martin, Training Superintendent.

Our inspection dates are subject to change based on your updated schedule of examination

activities. If there are any questions about this inspection or the material requested, please

contact Chris Steely, lead inspector for Unit 1, at 817-200-1432 or Chris.Steely@nrc.gov, or

Chris Cowdrey, lead inspector for Unit 2, at 817-200-1545 or Christian.Cowdrey@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

J. Browning

- 2 -

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice and Procedure," a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-313 and 50-368

License Nos. DRP-51 and NPF-6

Enclosure:

Biennial Requalification Inspection

Document Request

cc: Electronic Distribution

ML16138A164

SUNSI Review

By: VGG

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE

OE:OB

OE:OB

C:OB

NAME

CCowdrey

CSteely

VGaddy

SIGNATURE

/RA/

/RA/

/RA/

DATE

5/17/16

5/17/16

5/17/16

Letter to Jeremy Browning from Vincent G. Gaddy, dated May 17, 2016

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION

(NRC INTEGRATED INSPECTION REPORT 05000313/2016003 AND

05000368/2016003) AND REQUEST FOR INFORMATION

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Margaret.Tobin@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/E (John.Dixon@nrc.gov)

Project Engineer, DRP/E (Brian.Correll@nrc.gov)

Project Engineer, DRP/E (Jackson.Choate@nrc.gov)

ANO Administrative Assistant (Mary.Bennett@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Andrea.George@nrc.gov)

Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Enclosure

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

TO:

Randal Martin

Training Superintendent

479-858-6844

FROM:

Chris Cowdrey

Operations Engineer, NRC RIV

817-200-1545

SUBJECT:

INFORMATION REQUEST TO SUPPORT JULY 11, 2016 TO JULY 15, 2016,

LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION

(IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i.e., 2.02, 2.04, etc.). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than June 27, 2016.

As each unit will be inspected independently, please separate your submittal by unit.

Submit Unit 1 information electronically

To: Chris.Steely@nrc.gov

cc: Clyde.Osterholtz@nrc.gov

Submit Unit 2 information electronically

To: Christian.Cowdrey@nrc.gov

cc: Michael.Bloodgood@nrc.gov

Separate hardcopies to:

U.S. Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: Chris Steely (Unit 1) and Chris Cowdrey (Unit 2)

General Requests:

Index of the materials provided in response to this request

List of licensed operators (LO) (senior reactor operators (SRO) and reactor operators

(RO)) by crew (operating and staff)

Training and operations department organization charts (with qualified licensed

operator requalification (LOR) evaluators identified)

Procedures that identify process for revising and maintaining LO continuing training

program up to date

List of outstanding LOR program changes

List of plant events and industry operating experience incorporated into LOR

program since last BRQ (biennial requalification)

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

Last two years of Simulator Review Committee (or equivalent) meeting minutes

Last two years of Curriculum Review Committee (or equivalent) meeting minutes

- 2 -

02.03: Biennial Requalification Written Examination Quality

Current and approved biennial written examination schedule

Current requalification cycle written examination results for both SRO and RO that

have already been administered up to the week prior to the inspection team arrival

onsite, if any

All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite, if any (These documents will

need to have adequate password protection if e-mailed or double envelope

protection if mailed via regular mail per NUREG-1021.)

Current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

Schedule for the operating tests (job performance measures (JPMs) and scenarios)

to be given the week of July 11, 2016

Operating tests (JPMs and scenarios) (password protected and provide separately

via telephone at later date) to be given the week of July 11, 2016

Current requalification cycle operating tests (SRO and RO) and results up to the

week prior to the inspection team arrival on-site

All of the previous years NRC required annual operating tests

Current requalification cycle operating test methodology (sample plan)

All portions of the updated final safety analysis report that identify operator response

times for time critical operator actions

02.05: Licensee Admin of Requalification Exams

All procedures used to administer the annual operating test

All procedures used to assess operator performance

All procedures that describe conduct of simulator training

All procedures used to test, operate, and maintain the simulator

Index for referencing the above procedures

02.06: Requalification Examination Security

Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis

Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, technical support calls,

etc.) on a periodic basis

All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current examination cycle tests and prior year examinations

List of all condition reports since the last biennial requalification inspection related to

examination security and overlap

- 3 -

02.07: Licensee Remedial Training Program

List of remedial training conducted or planned since last requalification examinations

(includes training provided to operators to enable passing requalification

examinations and training provided to correct generic or individual weaknesses

observed during previous requalification examination cycle)

Remediation plans (lesson plans, reference materials, and attendance

documentation)

02.08: Conformance with Operator License Conditions

All procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

List of licensed operators whose licenses were reactivated since the last BRQ

inspection

02.09: Simulator Performance

For the following cases, send the most recent transient test packages, which may be

electronic or in paper single test packages and shall be complete with test

procedures for each test, the acceptance criteria, and results. For each transient test,

the reference chart should be included or an equivalent subject matter expert review

versus the simulator results with a write-up for any differences beyond the ANSI 3.5

standard requirements.

o Transient test 2, Trip of all feedwater pumps

o Transient test 6, Main turbine trip from maximum power level which does not

result in immediate reactor trip.

o Transient test 10, Stuck open PORV

o Steady State tests for low power test

All simulator management and configuration procedures if not already provided for

Section 02.05 above.

Simulator Discrepancy Report (DR) summary list for all open DRs. For closed DRs,

summary list for those items closed between June 2014 and May 2016.

Malfunction tests for loss of condenser vacuum, misaligned rods, and failure of

reactor pressure control. If these are included in an SBT package then the review of

that package would be acceptable. If these are in a scenario-based training

package, then the review of that package would be acceptable.

Primary parameters tested in order to verify core physics parameters (such as

moderator temperature coefficient (MTC), integral rod worth (IRW)). The applicable

reference graphs from the Plant physics data book (electronic or other means as

available) should also be included as well as the test procedures used and the

acceptance criteria with results.

- 4 -

02.10: Problem Identification and Resolution

Summary report of all condition reports related to operator actions/errors in the

control room

Any revised requalification training that was based on licensed operator performance

issues

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on July 11, 2016.

02.02: Exam Results/ 02.03 and 02.04: Written Exam and Op Test Quality

All approved Operating Tests (JPMs and scenarios) not previously submitted

All results up to the day the team leaves the site

02.08: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews)

Access to licensed operators training attendance records

Access to licensed operators medical records

02.09: Simulator Performance

Simulator discrepancies (DRs) from July 1, 2014, to July 11, 2016. This should

include all open DR examinations and DRs that have been closed, including the

documentation/justification for closure

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available)

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant

All current model deficiencies, including FSAR vs. Design differences in the simulator

(any documentation on this)

Summary list of modifications from July 1, 2014, to July 11, 2016

Plant modifications (both hardware and software) completed on the simulator by due

date from July 1, 2014, to July 11, 2016

Simulator differences lesson plan used in training (current to July 11, 2016)

The complete book of all simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests (This should also include the

test procedures for each test, the acceptance criteria, and results. For each transient

test, the reference chart should be included or an equivalent subject matter expert

review versus the simulator results with a write-up for any differences beyond the

ANSI 3.5 standard requirements.)

All test packages used to verify core physics parameters (such as MTC, IRW)

(The applicable reference graphs from the plant physics data book (electronic or

other means as available) should also be included as well as the test procedures

used and the acceptance criteria with results.)

All simulator test, configuration management, and related documents available in the

room for inspectors to review (this includes training needs analysis packages,

simulator review committee meeting minutes, etc.)

- 5 -

Current copy of ANSI 3.5 Standard you are committed to for simulator testing

02.10: Problem Identification and Resolution

All condition reports related to operator actions/errors in the control room

C. Arkansas Nuclear One is required to send the final results summary and any

remaining examinations and operating tests that have not been reviewed to the NRC

regional office lead inspectors for final review and comparison against the

Significance Determination Tools in order to communicate the exit results for the

inspection.