'ptREGUZ UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-001 October 17, 1996 MEMORANDUM TO:
Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects -
I/II Office of Nuclear Reactor Regulation FROM:
David E. LaBarge, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF INTERNAL STAFF MEETING CONCERNING FORTHCOMING DUKE POWER COMPANY RESPONSE TO OCONEE DRAFT ELECTRICAL REPORTS On October 8, 1996, personnel from EELB, Project Directorate 11-2, AEOD, EDO, and CRGR met to discuss future staff actions related to the finalization and issuance of the Oconee Nuclear Station Electrical Reports. DPC is expected to submit their written comments on October 31, 1996. Personnel in attendance are listed on the Attachment.
As a result of the meeting, the following actions were agreed upon:
- 1.
AEOD will review the DPC submittal and correct factual errors in the AEOD Draft Report. Few other changes are expected before the revised report is forwarded to CRGR. Any changes to the report that are necessary following this action will be made in a supplement to the report. AEOD will also evaluate the adequacy of DPC's response to determine that the issues raised in the AEOD Draft Report have been properly resolved.
- 2.
EELB will use the DPC submittal to determine how best to incorporate any changes that are needed to finalize the NRR report (either by revision or supplement to the draft report). It is expected that the DPC comments will be incorporated into the Draft Report to show closure of open items wherever possible. EELB will coordinate with SPSB in finalizing PRA-related items.
- 3.
EELB and AEOD will work together to attempt to address any differences of opinion regarding integrated tests and other issues.
- 4.
The schedule for completion of the AEOD and NRR reports and their submittal to CRGR will be determined shortly after the DPC submittal is received. This information will be forwarded to the Oconee PM.
9610220072 961017 PDR ADOCK 05000269 P
Herbert N. Berkow 2 -
October 17, 1996
- 5.
The Oconee PM will inform EELB and AEOD of the details of the request by the ACRS for a potential December briefing on the Oconee Draft Reports.
- 6.
The NRR and AEOD reports, when finalized, will be sent to the CRGR separately.
Docket Nos. 50-269, 50-270 and 50-287
Attachment:
As stated
Attachment LIST OF ATTENDEES J. Conran CRGR E. Hackett EDO C. Rossi AEOD G. Lanik AEOD J. Calvo EELB G. Lainas DE J. Lazevnick EELB H. Berkow PD 11-2 D. LaBarge PD 11-2
e Herbert N. Berkow 2
October 17, 1996
- 5.
The Oconee PM will inform EELB and AEOD of the details of the request by the ACRS for a potential December briefing on the Oconee Draft Reports.
- 6.
The NRR and AEOD reports, when finalized, will be sent to the CRGR separately.
Docket Nos. 50-269, 50-270 and 50-287
Attachment:
As stated DISTRIBUTION:
PD 11-2 Rdg S. Varga M. Rubin B. Sheron J. Conran E. Hackett C. Rossi G. Lanik J. Calvo G. Lainas J. Lazevnick H. Berkow D. LaBarge DOCUMENT NAME:
G:\\OCONEE\\MTG1008.MEM To receive a copy of thisAocument, Indicate In the box: "C" = Copy withoul att chment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE PDII-2/
PDII-2/LA E EEL AEOD PDI NAME DLaBart.
w Berry ez HC Lyo CRossi V HB rkV--'
DATE 1O/ 7/96
/0//7/96 16 /17/96 Wo /11 /96
/
/96 p9 r96 OFFICIAL RECORD COPY