ML16124A947

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Re-Registration of the Use the Cask Identification Numbers Identified in the Listed Table
ML16124A947
Person / Time
Site: Mcguire, McGuire, 07201031  Duke Energy icon.png
Issue date: 04/21/2016
From: Capps S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
MNS16-027
Download: ML16124A947 (3)


Text

Steven D. Capps Vice Presic!ent McGuire Nuclear Station Duke Energy MGO I VP I 12700 Hagers Feny Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Steven.Capps@duke-energy.com 10 CFR 72.212 10 CFR 72.4 April 21, 2016 Serial: MNS16-027 U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 72-38, 50-369, 50-370 -r2--/0 3 I Renewed License Nos .. NPF-9 and NPF-17

SUBJECT:

Independent Spent Fuel Storage Installation (ISFSI)

McGuire Nuclear Station is currently loading spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model No. MAGNASTOR). The letters referenced in the table on the next page of this correspondence previously registered the respective casks under Certificate of Compliance Number 1031, Amendment Number 2.

bn March 30, 2016, McGuire Nuclear Station adopted Certificate of Compliance Number 1031, Amendment Number 2, Revision Number 1. Condition 9 of this Certificate of Compliance requires, in part:

In applying the changes authorized by this revised certificate, the general licensee shall register each such cask with the Nuclear Regulatory Commission no later than 30 days after applying the changes authorized by the revised certificate. The registration shall include the information required by 10 CFR 72.212(b)(2).

Therefore, in accordance with the above requirement, Duke Energy hereby re-registers the use of the Cask Identification Numbers identified in the table on the next page of this correspondence.

U. S. Nuclear Regulatory Commission April 21, 2016 Page 2 MAGNASTOR- CoC, 1031Amendment2 Revision 1 Cask Reqistration '

1Cask System Concrete Previously Registered under dated Letters from Equipment Cask Serial Duke Energy to the NRC with ADAMS Accession Number Number Numbers OFCTKN026 MN-VCC-062 Auqust 28, 2013, ML13254A195 OFCTKN029 MN-VCC-061 Auqust28,2013, ML13254A195 OFCTKN031 MN-VCC-059 September 19, 2013, ML13274A246 OFCTKN030 MN-VCC-060 July 22, 2014, ML14213A009 OFCTKN032 . MN-VCC-053 July 22, 2014, ML14213A009 OFCTKN034 MN-VCC-055 Fel;>ruary 19, 2015, ML15062A017 OFCTKN027 MN-VCC-056 June 22, 2015, ML15196A027 OFCTKN035 MN-VCC-057 June 22, 2015, ML15196A027 OFCTKN042 MN-VCC-063 July 28, 2015, ML15222A177 OFCTKN038 MN-VCC-064 December 1, 2015, ML15343A037 If there are any questions or if additional information is needed, please contact Mr. G. M. Murphy at 980-875-5715.

~~ kr Steven D. Capps

U.S. Nuclear Regulatory Commission April 21, 2016 Page 3 xc:

C. Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 G.E. Miller, Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mailstop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station

Steven D. Capps Vice Presic!ent McGuire Nuclear Station Duke Energy MGO I VP I 12700 Hagers Feny Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Steven.Capps@duke-energy.com 10 CFR 72.212 10 CFR 72.4 April 21, 2016 Serial: MNS16-027 U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 72-38, 50-369, 50-370 -r2--/0 3 I Renewed License Nos .. NPF-9 and NPF-17

SUBJECT:

Independent Spent Fuel Storage Installation (ISFSI)

McGuire Nuclear Station is currently loading spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model No. MAGNASTOR). The letters referenced in the table on the next page of this correspondence previously registered the respective casks under Certificate of Compliance Number 1031, Amendment Number 2.

bn March 30, 2016, McGuire Nuclear Station adopted Certificate of Compliance Number 1031, Amendment Number 2, Revision Number 1. Condition 9 of this Certificate of Compliance requires, in part:

In applying the changes authorized by this revised certificate, the general licensee shall register each such cask with the Nuclear Regulatory Commission no later than 30 days after applying the changes authorized by the revised certificate. The registration shall include the information required by 10 CFR 72.212(b)(2).

Therefore, in accordance with the above requirement, Duke Energy hereby re-registers the use of the Cask Identification Numbers identified in the table on the next page of this correspondence.

U. S. Nuclear Regulatory Commission April 21, 2016 Page 2 MAGNASTOR- CoC, 1031Amendment2 Revision 1 Cask Reqistration '

1Cask System Concrete Previously Registered under dated Letters from Equipment Cask Serial Duke Energy to the NRC with ADAMS Accession Number Number Numbers OFCTKN026 MN-VCC-062 Auqust 28, 2013, ML13254A195 OFCTKN029 MN-VCC-061 Auqust28,2013, ML13254A195 OFCTKN031 MN-VCC-059 September 19, 2013, ML13274A246 OFCTKN030 MN-VCC-060 July 22, 2014, ML14213A009 OFCTKN032 . MN-VCC-053 July 22, 2014, ML14213A009 OFCTKN034 MN-VCC-055 Fel;>ruary 19, 2015, ML15062A017 OFCTKN027 MN-VCC-056 June 22, 2015, ML15196A027 OFCTKN035 MN-VCC-057 June 22, 2015, ML15196A027 OFCTKN042 MN-VCC-063 July 28, 2015, ML15222A177 OFCTKN038 MN-VCC-064 December 1, 2015, ML15343A037 If there are any questions or if additional information is needed, please contact Mr. G. M. Murphy at 980-875-5715.

~~ kr Steven D. Capps

U.S. Nuclear Regulatory Commission April 21, 2016 Page 3 xc:

C. Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 G.E. Miller, Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mailstop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station