Active Travelers Summary Report
ML16124A843
Person / Time
Site: Technical Specifications Task Force
Issue date: 04/28/2016
From:
Office of Nuclear Reactor Regulation
To:
Honcharik M
Shared Package
ML16124A851 List:
References
TSTF-541 Rev 0
Download: ML16124A843 (3)


Text

Active Travelers Summary Report (See Topics Report for More Information)

TSTF Number Applicability Description TSTF-541, Rev. 0 All Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed Topic Number: 1249 Originally Submitted: 9/10/2013 Age: 31 Months NRC Review Fees To Date: $74,621.02 (Shared)

Originally Scheduled for Approval: 9/30/2016 Number of Times Approval Date has been Rescheduled: 1 Actions and Schedule Responsibility Date TSTF-541 submitted to the NRC on September 10, 2013. TSTF 9/10/2013 NRC transmitted the acceptance and schedule letter on August 13, 2015. NRC 8/13/2015 NRC transmitted a Request for Additional Information on August 13, 2015. TSTF 11/11/2015 TSTF responded to request for additional information on November 11, TSTF 11/12/2015 2015.

NRC to provide revised review schedule. NRC 12/3/2015 12/3/2015 - a new review schedule was provided:

Second round RAIs to be provided in mid-February, 2016.

Draft safety evaluation to be provided by November 7, 2016.

NRC provided a second round RAI on February 26, 2016. Of the 21 TSTF 4/29/2016 questions, approximately half appear to be repetitive of the first round RAI.

TSTF to evaluate the draft RAI and, if needed, request an executive meeting to discuss the RAIs.

Page 1 of 3 28-Apr-16

Active Travelers Summary Report (See Topics Report for More Information)

TSTF Number Applicability Description TSTF-542, Rev. 2 BWRs Reactor Pressure Vessel Water Inventory Control Topic Number: 1331 Originally Submitted: 12/31/2013 Age: 28 Months NRC Review Fees Waived Originally Scheduled for Approval: 12/31/2014 Number of Times Approval Date has been Rescheduled: 2 Actions and Schedule Responsibility Date TSTF-542 and fee exemption request submitted to the NRC on 12/31/2013. TSTF 12/31/2013 NRC to issue fee exemption. NRC 2/24/2014 2/24/2014 - Fee exemption granted.

At the July 10, 2014 TSTF/NRC meeting, the NRC stated their schedule for NRC 7/10/2014 reviewing TSTF-542 is:

(1)NRC to provide an RAIs 10/1/2014 (2)Industry to respond 12/31/2014 (3)Notice for Comment 3/31/2015 (4)Notice of Availability 6/30/2015 NRC RAI received on 10/10/2014. NRC 10/16/2014 Responding to the RAI required extensive revision to the Traveler and TSTF 9/15/2015 multiple rounds of industry review to ensure accuracy. TSTF-542, Revision 1, and RAI response submitted.

A public meeting discussing the draft RAI was held on November 5. NRC NRC 12/31/2015 provided the RAI on December 3, 2015.

TSTF responded to the RAI on March 14, 2016. TSTF 3/8/2016 NRC to provide the draft safety evaluation. NRC 7/14/2016 TSTF-546, Rev. 0 BWRs Revise APRM Channel Adjustment Surveillance Requirement Topic Number: 1350 Originally Submitted: 4/21/2016 Age: 0 Months No NRC Review Fees Received Originally Scheduled for Approval: Not Provided Number of Times Approval Date has been Rescheduled: 0 Actions and Schedule Responsibility Date NRC to provide acceptance and review schedule. NRC 7/22/2016 Page 2 of 3 28-Apr-16

Active Travelers Summary Report (See Topics Report for More Information)

TSTF Number Applicability Description TSTF-551, Rev. 1 BWRs Revise Secondary Containment Surveillance Requirements Topic Number: 1386 Originally Submitted: 10/30/2014 Age: 18 Months NRC Review Fees To Date: $136,360.75 (BWROG)

Originally Scheduled for Approval: 3/8/2016 Number of Times Approval Date has been Rescheduled: 1 Actions and Schedule Responsibility Date TSTF-551, Revision 0, "Address Transient Secondary Containment TSTF 10/30/2014 Conditions" was submitted on October 30, 2014.

On March 12, 2015, the NRC provided a revised review schedule. NRC 5/8/2015 NRC to provide RAIs 5/8/15 TSTF response 8/6/15 Notice for Comment 1/3/16 Notice of Availability 5/2/16 On a May 7, 2015 teleconference, the TSTF agreed to revise the Traveler in TSTF 6/30/2015 lieu of NRC sending a formal RAI.

TSTF submitted TSTF-551, Revision 1, on September 3, 2015. TSTF 9/3/2015 NRC to provide RAI. Teleconference to discuss RAIs held on 10/19/15. NRC 11/30/2015 On 11/5/15, TSTF agreed to a 45 day response time for the RAI.

RAI provided on 11/18/2015. It included a new review schedule:

Issue Draft Safety Evaluation by May 26, 2016 Issue Final Safety Evaluation by July 23, 2016.

The TSTF responded to the NRC RAI on January 26, 2016. TSTF 1/26/2016 TSTF and NRC held a teleconference to discuss the wording of the TSTF 5/13/2016 proposed SR 3.6.4.1.1 Note. The TSTF agreed to submit a revision to address the staff concerns.

TSTF-553, Rev. 0 B&W W Add Action for Two Inoperable CREATCS Trains Topic Number: 1423 Originally Submitted: 10/31/2015 Age: 6 Months NRC Review Fees To Date: $82,047.86 (PWROG)

Originally Scheduled for Approval: 10/31/2016 Number of Times Approval Date has been Rescheduled: 0 Actions and Schedule Responsibility Date TSTF submitted TSTF-553 on October 31, 2015. TSTF 10/31/2015 NRC provided acceptance and schedule letter on December 15, 2015. NRC 12/15/2015 Issue RAI - February 23, 2016 Issue Draft SE - August 26, 2016 Issue Final SE - October 31, 2016 NRC provided RAI on February 23, 2016. NRC 2/23/2016 NRC and TSTF held a teleconference to discuss a draft RAI response on NRC 5/31/2016 4/20/16. TSTF to revise the response and share with NRC prior to submittal.

Active Travelers: 5 Page 3 of 3 28-Apr-16