ML16119A373

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - LIC-109 Acceptance Review - LAR 282, Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves - MF7441/MF7442
ML16119A373
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/28/2016
From: Mahesh Chawla
Plant Licensing Branch III
To: Cross W, Millen M
Florida Power & Light Co, Nextera Energy
References
MF7441, MF7442
Download: ML16119A373 (5)


Text

NRR-PMDAPEm Resource From: Chawla, Mahesh Sent: Thursday, April 28, 2016 1:42 PM To: michael.millen@nexteraenergy.com; Woyak, Bryan (Bryan.Woyak@nexteraenergy.com);

Mrozinsky, Richard (Richard.Mrozinsky@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com); Locke, Kim (Kim.Locke@nexteraenergy.com)

Cc: Wrona, David; Dennig, Robert; Klein, Alex; West, Khadijah; Sweat, Tarico; Oliver, David; Barclay, Kevin; Cameron, Jamnes; Rutkowski, John; Bloom, Steven

Subject:

LIC-109 Acceptance Review - LAR 282, Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves -

MF7441/MF7442 Attachments: MF7440_41_Supplemental Information Request.docx By letter dated March 10, 2016 (ADAMS Accession No.ML16070A118), NextEra Energy Point Beach (the licensee) submitted a license amendment request (LAR) for Point Beach Nuclear Plant, Units 1 and 2. The proposed LAR 282 would modify the wording of Surveillance Requirement (SR) 3.4.12.7 associated with the Power-operated Relief Valves, by replacing the words gas bottles with the word supply. In its application, the licensee characterized the proposed TS change as non-technical.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that the proposed change is not editorial and the information delineated in the enclosure to this letter is necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.

In order to make the application complete, the NRC staff requests that the licensee supplement the application to address the information requested in the enclosure by a mutually agreed upon date during a teleconference to discuss this supplemental information. This will enable the NRC staff to complete its detailed technical review. If the information responsive to the NRC staffs request is not received by the requested date to be determined during a teleconference with the licensee, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC staff will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Please arrange a teleconference with the NRC staff to discuss this information. If you have any questions, please contact me. Thanks Mahesh Chawla Project Manager 1

Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 2809 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20160428134100)

Subject:

LIC-109 Acceptance Review - LAR 282, Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves - MF7441/MF7442 Sent Date: 4/28/2016 1:41:54 PM Received Date: 4/28/2016 1:41:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

"Wrona, David" <David.Wrona@nrc.gov>

Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov>

Tracking Status: None "Klein, Alex" <Alex.Klein@nrc.gov>

Tracking Status: None "West, Khadijah" <Khadijah.West@nrc.gov>

Tracking Status: None "Sweat, Tarico" <Tarico.Sweat@nrc.gov>

Tracking Status: None "Oliver, David" <David.Oliver@nrc.gov>

Tracking Status: None "Barclay, Kevin" <Kevin.Barclay@nrc.gov>

Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov>

Tracking Status: None "Rutkowski, John" <John.Rutkowski@nrc.gov>

Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>

Tracking Status: None "michael.millen@nexteraenergy.com" <michael.millen@nexteraenergy.com>

Tracking Status: None "Woyak, Bryan (Bryan.Woyak@nexteraenergy.com)" <Bryan.Woyak@nexteraenergy.com>

Tracking Status: None "Mrozinsky, Richard (Richard.Mrozinsky@nexteraenergy.com)"

<Richard.Mrozinsky@nexteraenergy.com>

Tracking Status: None "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>

Tracking Status: None "Locke, Kim (Kim.Locke@nexteraenergy.com)" <Kim.Locke@nexteraenergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3044 4/28/2016 1:41:00 PM MF7440_41_Supplemental Information Request.docx 25605 Options Priority: Standard

Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Request for Supplemental Information Point Beach Nuclear Plant, Units 1 and 2 Docket Nos. 50-266 and 50-301 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36(c)(3),

surveillance requirements (SRs) are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.

The licensee stated in Section 2.0 of its application, dated March 10, 2016:

The proposed change to SR 3.4.12.7 would apply to the current configuration where the nitrogen gas supply is provided by bottles. Similarly, the revised SR would apply if NextEra implements a future design change that replaces the nitrogen gas bottles with accumulators or another type of appropriate container.

In its application, the licensee characterized the proposed technical specification (TS) change as non-technical. However, in October 2015, the licensee brought to the attention of NRC staff the need for this TS change due to a planned plant modification. The modification is a commitment tied to a separate application (dated June 26, 2013, and currently under NRC review) requesting to transition Point Beach to 10 CFR 50.48(c), National Fire Protection Association Standard NFPA 805.

Essentially, the proposed TS change is linked to a technical change. It is not merely editorial.

An application to revise a TS related to a design change must include adequate design information and technical justification. For that reason, NRC staff will need more information than was provided to properly evaluate whether SR 3.4.12.7 will continue to meet 10 CFR 50.36(c)(3) for the new nitrogen supply design. Please provide sufficient detail and technical justification of the related design change for the TS change.

The nitrogen supply design will be reviewed using Section 9.3.1, Compressed Air System of the Standard Review Plan (SRP). Describe how the new nitrogen supply will continue to meet all regulatory requirements (e.g., General Design Criteria 1, 2, and 5) identified within SRP 9.3.1. Also, provide a system description and P&IDs to identify differences in the current and Commented [WD1]: Do we need full blown P&IDs?

proposed nitrogen supply system. Can we just ask for simplified system drawings?

Enclosure

NRR-PMDAPEm Resource From: Chawla, Mahesh Sent: Thursday, April 28, 2016 1:42 PM To: michael.millen@nexteraenergy.com; Woyak, Bryan (Bryan.Woyak@nexteraenergy.com);

Mrozinsky, Richard (Richard.Mrozinsky@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com); Locke, Kim (Kim.Locke@nexteraenergy.com)

Cc: Wrona, David; Dennig, Robert; Klein, Alex; West, Khadijah; Sweat, Tarico; Oliver, David; Barclay, Kevin; Cameron, Jamnes; Rutkowski, John; Bloom, Steven

Subject:

LIC-109 Acceptance Review - LAR 282, Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves -

MF7441/MF7442 Attachments: MF7440_41_Supplemental Information Request.docx By letter dated March 10, 2016 (ADAMS Accession No.ML16070A118), NextEra Energy Point Beach (the licensee) submitted a license amendment request (LAR) for Point Beach Nuclear Plant, Units 1 and 2. The proposed LAR 282 would modify the wording of Surveillance Requirement (SR) 3.4.12.7 associated with the Power-operated Relief Valves, by replacing the words gas bottles with the word supply. In its application, the licensee characterized the proposed TS change as non-technical.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that the proposed change is not editorial and the information delineated in the enclosure to this letter is necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.

In order to make the application complete, the NRC staff requests that the licensee supplement the application to address the information requested in the enclosure by a mutually agreed upon date during a teleconference to discuss this supplemental information. This will enable the NRC staff to complete its detailed technical review. If the information responsive to the NRC staffs request is not received by the requested date to be determined during a teleconference with the licensee, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC staff will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Please arrange a teleconference with the NRC staff to discuss this information. If you have any questions, please contact me. Thanks Mahesh Chawla Project Manager 1

Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 2809 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20160428134100)

Subject:

LIC-109 Acceptance Review - LAR 282, Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves - MF7441/MF7442 Sent Date: 4/28/2016 1:41:54 PM Received Date: 4/28/2016 1:41:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

"Wrona, David" <David.Wrona@nrc.gov>

Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov>

Tracking Status: None "Klein, Alex" <Alex.Klein@nrc.gov>

Tracking Status: None "West, Khadijah" <Khadijah.West@nrc.gov>

Tracking Status: None "Sweat, Tarico" <Tarico.Sweat@nrc.gov>

Tracking Status: None "Oliver, David" <David.Oliver@nrc.gov>

Tracking Status: None "Barclay, Kevin" <Kevin.Barclay@nrc.gov>

Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov>

Tracking Status: None "Rutkowski, John" <John.Rutkowski@nrc.gov>

Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>

Tracking Status: None "michael.millen@nexteraenergy.com" <michael.millen@nexteraenergy.com>

Tracking Status: None "Woyak, Bryan (Bryan.Woyak@nexteraenergy.com)" <Bryan.Woyak@nexteraenergy.com>

Tracking Status: None "Mrozinsky, Richard (Richard.Mrozinsky@nexteraenergy.com)"

<Richard.Mrozinsky@nexteraenergy.com>

Tracking Status: None "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>

Tracking Status: None "Locke, Kim (Kim.Locke@nexteraenergy.com)" <Kim.Locke@nexteraenergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3044 4/28/2016 1:41:00 PM MF7440_41_Supplemental Information Request.docx 25605 Options Priority: Standard

Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Request for Supplemental Information Point Beach Nuclear Plant, Units 1 and 2 Docket Nos. 50-266 and 50-301 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36(c)(3),

surveillance requirements (SRs) are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.

The licensee stated in Section 2.0 of its application, dated March 10, 2016:

The proposed change to SR 3.4.12.7 would apply to the current configuration where the nitrogen gas supply is provided by bottles. Similarly, the revised SR would apply if NextEra implements a future design change that replaces the nitrogen gas bottles with accumulators or another type of appropriate container.

In its application, the licensee characterized the proposed technical specification (TS) change as non-technical. However, in October 2015, the licensee brought to the attention of NRC staff the need for this TS change due to a planned plant modification. The modification is a commitment tied to a separate application (dated June 26, 2013, and currently under NRC review) requesting to transition Point Beach to 10 CFR 50.48(c), National Fire Protection Association Standard NFPA 805.

Essentially, the proposed TS change is linked to a technical change. It is not merely editorial.

An application to revise a TS related to a design change must include adequate design information and technical justification. For that reason, NRC staff will need more information than was provided to properly evaluate whether SR 3.4.12.7 will continue to meet 10 CFR 50.36(c)(3) for the new nitrogen supply design. Please provide sufficient detail and technical justification of the related design change for the TS change.

The nitrogen supply design will be reviewed using Section 9.3.1, Compressed Air System of the Standard Review Plan (SRP). Describe how the new nitrogen supply will continue to meet all regulatory requirements (e.g., General Design Criteria 1, 2, and 5) identified within SRP 9.3.1. Also, provide a system description and P&IDs to identify differences in the current and Commented [WD1]: Do we need full blown P&IDs?

proposed nitrogen supply system. Can we just ask for simplified system drawings?

Enclosure