From: April Pulvirenti
Plant Licensing Branch IV
To: Milster L
Entergy Nuclear Operations
References
MF7485
Download: ML16116A332 (2)


Text

NRR-PMDAPEm Resource From: Pulvirenti, April Sent: Friday, April 15, 2016 1:12 PM To: Milster, Leia Elizabeth Cc: Wolfgang, Robert

Subject:

MF7485 Waterford 3 Relief Request regarding HPSI pump surveillance Acceptance Review

Leia, By letter dated March 17, 2016 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML16077A376), Entergy submitted a relief request for Waterford Unit 3. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application. In accordance with LIC-109, Revision 1, the staff has concluded that the application does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Thanks, April Dr. April L. Pulvirenti Project Manager, Waterford Unit 3 United States Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 301-415-1390 1

Hearing Identifier: NRR_PMDA Email Number: 2797 Mail Envelope Properties (April.Pulvirenti@nrc.gov20160415131100)

Subject:

MF7485 Waterford 3 Relief Request regarding HPSI pump surveillance Acceptance Review Sent Date: 4/15/2016 1:11:56 PM Received Date: 4/15/2016 1:11:00 PM From: Pulvirenti, April Created By: April.Pulvirenti@nrc.gov Recipients:

"Wolfgang, Robert" <Robert.Wolfgang@nrc.gov>

Tracking Status: None "Milster, Leia Elizabeth" <lmilste@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1805 4/15/2016 1:11:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Pulvirenti, April Sent: Friday, April 15, 2016 1:12 PM To: Milster, Leia Elizabeth Cc: Wolfgang, Robert

Subject:

MF7485 Waterford 3 Relief Request regarding HPSI pump surveillance Acceptance Review

Leia, By letter dated March 17, 2016 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML16077A376), Entergy submitted a relief request for Waterford Unit 3. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application. In accordance with LIC-109, Revision 1, the staff has concluded that the application does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Thanks, April Dr. April L. Pulvirenti Project Manager, Waterford Unit 3 United States Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 301-415-1390 1

Hearing Identifier: NRR_PMDA Email Number: 2797 Mail Envelope Properties (April.Pulvirenti@nrc.gov20160415131100)

Subject:

MF7485 Waterford 3 Relief Request regarding HPSI pump surveillance Acceptance Review Sent Date: 4/15/2016 1:11:56 PM Received Date: 4/15/2016 1:11:00 PM From: Pulvirenti, April Created By: April.Pulvirenti@nrc.gov Recipients:

"Wolfgang, Robert" <Robert.Wolfgang@nrc.gov>

Tracking Status: None "Milster, Leia Elizabeth" <lmilste@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1805 4/15/2016 1:11:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: