ML16116A296

From kanterella
Jump to navigation Jump to search
2016 Byron Nuclear Station Initial License Examination Proposed Examination Submission Letter
ML16116A296
Person / Time
Site: Byron  Constellation icon.png
Issue date: 01/11/2016
From: Pederson C
Region 3 Administrator
To:
Exelon Generation Co
References
Download: ML16116A296 (2)


Text

Byron Generating Station Exelon Generation 4450 North German Church Rd Byron, IL 61010-9794 www exeloncorp com January 11, 2016 LTR: BYRON 2016-0002 File: 1.10.0101 (1 D.101)

Cynthia D. Pederson Regional Administrator - Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Submittal of Integrated Initial License Training Examination Materials

Dear Ms. Pederson:

Enclosed are the examination materials Byron Generating Station is submitting in support of the initial license exam scheduled March 14-25, 2016 at Byron Generating Station.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures and Integrated Plant Operation Scenario guides.

These examination materials have been developed in accordance with NUREG-1021, Revision 10, "Operator Licensing Examination Standards." Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the Integrated Examination Outline in order to improve balance and content. A list of outline changes and justifications is included. These changes improve examination quality and are in compliance with NUREG-1021, Revision 10, "Operator Licensing Examination Standards."

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021, Revision 10, Section E-201, please ensure these materials are withheld from public disclosure until after the examinations are complete.

LTR: BYRON 2016-0002 January 11, 2016 Cynthia D. Pederson Page 2 Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209.

Respectfully,

~£----

Mark E. Kanavos Site Vice President Byron Generating Station MEK/RFP/AC/sg Enclosures cc: Michael Bielby, Chief Examiner, NRG Region Ill, with enclosures Chief Operations Branch NRG, without enclosures NRG Senior Resident Inspector, Byron Station, without enclosures Letter enclosure distribution as follows:

Cynthia D. Pederson, without enclosures Enclosures listed below will be hand delivered to Michael Bielby, Chief Examiner, NRG Region Ill:

  • RO I SRO Composite Examination with references attached

Byron Generating Station Exelon Generation 4450 North German Church Rd Byron, IL 61010-9794 www exeloncorp com January 11, 2016 LTR: BYRON 2016-0002 File: 1.10.0101 (1 D.101)

Cynthia D. Pederson Regional Administrator - Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Submittal of Integrated Initial License Training Examination Materials

Dear Ms. Pederson:

Enclosed are the examination materials Byron Generating Station is submitting in support of the initial license exam scheduled March 14-25, 2016 at Byron Generating Station.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures and Integrated Plant Operation Scenario guides.

These examination materials have been developed in accordance with NUREG-1021, Revision 10, "Operator Licensing Examination Standards." Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the Integrated Examination Outline in order to improve balance and content. A list of outline changes and justifications is included. These changes improve examination quality and are in compliance with NUREG-1021, Revision 10, "Operator Licensing Examination Standards."

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021, Revision 10, Section E-201, please ensure these materials are withheld from public disclosure until after the examinations are complete.

LTR: BYRON 2016-0002 January 11, 2016 Cynthia D. Pederson Page 2 Should you have any questions concerning this letter, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (815) 406-2800. For questions concerning examination materials, please contact Mr. Robert F. Peterson, Senior Ops Training Instructor, at (815) 406-3209.

Respectfully,

~£----

Mark E. Kanavos Site Vice President Byron Generating Station MEK/RFP/AC/sg Enclosures cc: Michael Bielby, Chief Examiner, NRG Region Ill, with enclosures Chief Operations Branch NRG, without enclosures NRG Senior Resident Inspector, Byron Station, without enclosures Letter enclosure distribution as follows:

Cynthia D. Pederson, without enclosures Enclosures listed below will be hand delivered to Michael Bielby, Chief Examiner, NRG Region Ill:

  • RO I SRO Composite Examination with references attached