ML16116A073
| ML16116A073 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 03/23/2016 |
| From: | Bielby M Operations Branch III |
| To: | Exelon Generation Co |
| References | |
| Download: ML16116A073 (1) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Examination Level:
RO SRO Operating Test Number: Byron 2016301 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations R, D Evaluate Rema 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management. 4.3/4.6 Bank Conduct of Operations R, P, D Minimum Shift staffing 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. 2.9/3.9 2013 NRC Equipment Control R, M Initiate LCOAR 2.2.23 Ability to track Technical Specification limiting conditions for operations. 3.1/4.6 Modified from 2014 NRC Radiation Control R, D Review Release package 2.3.6 Ability to approve release permits. 2.0/3.8 Bank Emergency Plan R, M Classify event and fill out NARS form 2.4.41 Knowledge of the emergency action level thresholds and classifications. 2.9/4.6 Modified from 2014 NRC NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Examination Level:
RO SRO Operating Test Number: Byron 2016301 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations R, D Evaluate Rema 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management. 4.3/4.6 Bank Conduct of Operations R, P, D Minimum Shift staffing 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. 2.9/3.9 2013 NRC Equipment Control R, M Initiate LCOAR 2.2.23 Ability to track Technical Specification limiting conditions for operations. 3.1/4.6 Modified from 2014 NRC Radiation Control R, D Review Release package 2.3.6 Ability to approve release permits. 2.0/3.8 Bank Emergency Plan R, M Classify event and fill out NARS form 2.4.41 Knowledge of the emergency action level thresholds and classifications. 2.9/4.6 Modified from 2014 NRC NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)