ML16089A399

From kanterella
Jump to navigation Jump to search
Submittal of Operating Tests and Supporting Reference Materials - 2014-301 Section 14
ML16089A399
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/27/2014
From: Lane N
Virginia Electric & Power Co (VEPCO)
To: Mccree V
NRC/RGN-II
References
14-080A
Download: ML16089A399 (7)


Text

VIRGINIA ELEcTRIC AND PowER CoMPANy RICHMOND, VIRGINIA 23261 May 27, 2014 Victor McCree, Regional Administrator Serial No.

14-080A United States Nuclear Regulatory Commission Region II SS&L/KAM Marquis One Tower Docket Nos.

50-280 245 Peachtree Center Ave., NE, Suite 1200 50-281 Atlanta, Georgia 30303-1 257 License Nos, DPR-32 DPR-37

Dear Mr. McCree,

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 SUBMITTAL OF OPERATING TESTS AND SUPPORTING REFERENCE MATERIALS NRC letter dated February 6, 2014, Notification of Licensed Operator Initial Examination

- Surry Power Station, requested transmittal of operating tests and supporting reference materials to support the initial reactor operator and senior reactor operator tests scheduled for the weeks of July 21 and July 28, 2014.

This letter is to inform you that the operating tests and supporting reference materials, indentified in NUREG-1021, were transmitted on May 17, 2014 and received by Mr. David Lanyi, NRC Chief Examiner, on May 19, 2014.

In addition, the following supporting documents were included in the transmittal:

Form ES-201-3, Examination Security Agreement Form ES-301-2, Control Room/In-Plant Systems Outline Form ES-301-3, Operating Test Quality Checklist Form ES-301-4, Simulator Scenario Quality Checklist Form ES-301-5, Transient and Event Checklist Form ES-301-6, Competencies Checklist ES-401-4, Record of Rejected Knowledge and Abilities ES-401-6, Written Examination Quality Checklist ES-D1, Scenario Outlines ES-D2, Required Operator Actions We request that the materials submitted to the NRC be withheld from public disclosure until after the operator examinations have been administered.

If you have any questions or require additional information, please contact Mr. Paul Orrison or Mr. Mike Meyer at (757) 365-2835.

Sincerely, N. L. Lane Site Vice President Surry Power Station Commitments made by this letter: None

Serial No. 14-080A Submittal of Operating Tests and Reference Materials Docket Nos. 50-280/50-281 Page2of2 cc:

Mr. M. T. Widmann, Chief Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1 257 Mr. David Lanyi Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1 257 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 14, 2014 Victor McCree, Regional Adminstrator Serial Number 14-080D United States Nuclear Regulatory Commission Region II SS&L/KAM Marquis One Tower Docket Nos. 50-280 245 Peachtree Center Ave., NE, Suite 1200 50-281 Atlanta, Georgia 30303-1257 License Nos. DPR-32 DPR-37

Dear Mr. McCree,

VIRGINIA ELECTRIC AND POWER COMPANY SURRY STATION UNITS 1 AND 2 SUBMITTAL OF FINAL OPERATING AND WRITTEN EXAMINATION Following completion of Initial License Examination preparation week held from June 30 through July 3, 2014, NRC Inspector Mr. David Lanyi requested transmittal of the Final Operating and Written Examinations by July 15, 2014 for examinations scheduled during the weeks of July 21 and July 28, 2014. This letter is to inform you that the Final Operating and Written Examinations were transmitted on July 10, 2014, and received by Mr. David Lanyi, NRC Chief Examiner, on July 11,2014.

In addition, the following supporting documents were included in the transmittal:

Form ES-201 -3, Examination Security Agreement Form ES-301-1, Administrative Topics Outline Form ES-301-2, Control Room/In-Plant Systems Outline Form ES-301-3, Operating Test Quality Checklist Form ES-301-4, Simulator Scenario Quality Checklist Form ES-301-5, Transient and Event Checklist Form ES-301-6, Competencies Checklist Form ES-401-4, Record of Rejected Knowledge and Abilities Form ES-401-6, Written Examination Quality Checklist ES-D-1, Scenario Outlines ES-D2, Required Operator Actions

Serial No. 14-080D Docket Nos. 50-280/50-281 Page 2 of 3 We request that the materials submitted to the NRC be withheld from public disclosure until after the operator examinations have been administered.

If you have any questions or require additional information, please contact Mr. Paul Orrison oLMr. Mike Meyer at (757) 365-2835.

/aL Site Vice ident Surry Power Station Commitments made by this letter: None.

Serial No. 14-080D Docket Nos. 50-280/50-281 Page 3 of 3 copy:

Mr. Malcolm T. Widmann Chief, Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 8, 2014 Victor McCree, Regional Administrator Serial No.

14-080E United States Nuclear Regulatory Commission SPS LIC/KAM R0 Region II Docket Nos.

50-280 Marquis One Tower 50-28 1 245 Peachtree Center Ave. NE, Suite 1200 License Nos.

DPR-32 Atlanta, Georgia 30303-1257 DPR-37

Dear Mr. McCree,

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 WRITTEN AND OPERATING EXAMINATION COMMENTS In accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Section ES-402, Virginia Electric and Power Company submits the following information concerning the Reactor Operator and Senior Reactor Operator Initial Operating and Written Examinations administered at Surry Power Station from July 21, 2014 through August 1,2014.

There are no post-exam comments concerning the Surry Reactor Operator and Senior Reactor Operator Initial Operating and Written Examinations.

If you have any question or require additional information, please contact Mr. Paul Orrison or Mr. Mike Meyer at (757)-365-2835.

Very truly yours, N. L. Lane Site Vice President Surry Power Station Commitments: None

Serial No. 14-080E Written and Operating Examination Comments Docket Nos. 50-280 50-281 Page 2 of 2 copy:

Mr. M. T. Widman, Chief Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave. NE, Suite 1200 Atlanta, Georgia 30303-1 257 Mr. David Lanyi, Chief Examiner Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave. NE, Suite 1200 Atlanta, Georgia 30303-1257 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station

VIRGINIA ELEcTRIC AND PowER CoMPANy RICHMOND, VIRGINIA 23261 May 27, 2014 Victor McCree, Regional Administrator Serial No.

14-080A United States Nuclear Regulatory Commission Region II SS&L/KAM Marquis One Tower Docket Nos.

50-280 245 Peachtree Center Ave., NE, Suite 1200 50-281 Atlanta, Georgia 30303-1 257 License Nos, DPR-32 DPR-37

Dear Mr. McCree,

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 SUBMITTAL OF OPERATING TESTS AND SUPPORTING REFERENCE MATERIALS NRC letter dated February 6, 2014, Notification of Licensed Operator Initial Examination

- Surry Power Station, requested transmittal of operating tests and supporting reference materials to support the initial reactor operator and senior reactor operator tests scheduled for the weeks of July 21 and July 28, 2014.

This letter is to inform you that the operating tests and supporting reference materials, indentified in NUREG-1021, were transmitted on May 17, 2014 and received by Mr. David Lanyi, NRC Chief Examiner, on May 19, 2014.

In addition, the following supporting documents were included in the transmittal:

Form ES-201-3, Examination Security Agreement Form ES-301-2, Control Room/In-Plant Systems Outline Form ES-301-3, Operating Test Quality Checklist Form ES-301-4, Simulator Scenario Quality Checklist Form ES-301-5, Transient and Event Checklist Form ES-301-6, Competencies Checklist ES-401-4, Record of Rejected Knowledge and Abilities ES-401-6, Written Examination Quality Checklist ES-D1, Scenario Outlines ES-D2, Required Operator Actions We request that the materials submitted to the NRC be withheld from public disclosure until after the operator examinations have been administered.

If you have any questions or require additional information, please contact Mr. Paul Orrison or Mr. Mike Meyer at (757) 365-2835.

Sincerely, N. L. Lane Site Vice President Surry Power Station Commitments made by this letter: None

Serial No. 14-080A Submittal of Operating Tests and Reference Materials Docket Nos. 50-280/50-281 Page2of2 cc:

Mr. M. T. Widmann, Chief Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1 257 Mr. David Lanyi Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1 257 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 14, 2014 Victor McCree, Regional Adminstrator Serial Number 14-080D United States Nuclear Regulatory Commission Region II SS&L/KAM Marquis One Tower Docket Nos. 50-280 245 Peachtree Center Ave., NE, Suite 1200 50-281 Atlanta, Georgia 30303-1257 License Nos. DPR-32 DPR-37

Dear Mr. McCree,

VIRGINIA ELECTRIC AND POWER COMPANY SURRY STATION UNITS 1 AND 2 SUBMITTAL OF FINAL OPERATING AND WRITTEN EXAMINATION Following completion of Initial License Examination preparation week held from June 30 through July 3, 2014, NRC Inspector Mr. David Lanyi requested transmittal of the Final Operating and Written Examinations by July 15, 2014 for examinations scheduled during the weeks of July 21 and July 28, 2014. This letter is to inform you that the Final Operating and Written Examinations were transmitted on July 10, 2014, and received by Mr. David Lanyi, NRC Chief Examiner, on July 11,2014.

In addition, the following supporting documents were included in the transmittal:

Form ES-201 -3, Examination Security Agreement Form ES-301-1, Administrative Topics Outline Form ES-301-2, Control Room/In-Plant Systems Outline Form ES-301-3, Operating Test Quality Checklist Form ES-301-4, Simulator Scenario Quality Checklist Form ES-301-5, Transient and Event Checklist Form ES-301-6, Competencies Checklist Form ES-401-4, Record of Rejected Knowledge and Abilities Form ES-401-6, Written Examination Quality Checklist ES-D-1, Scenario Outlines ES-D2, Required Operator Actions

Serial No. 14-080D Docket Nos. 50-280/50-281 Page 2 of 3 We request that the materials submitted to the NRC be withheld from public disclosure until after the operator examinations have been administered.

If you have any questions or require additional information, please contact Mr. Paul Orrison oLMr. Mike Meyer at (757) 365-2835.

/aL Site Vice ident Surry Power Station Commitments made by this letter: None.

Serial No. 14-080D Docket Nos. 50-280/50-281 Page 3 of 3 copy:

Mr. Malcolm T. Widmann Chief, Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 8, 2014 Victor McCree, Regional Administrator Serial No.

14-080E United States Nuclear Regulatory Commission SPS LIC/KAM R0 Region II Docket Nos.

50-280 Marquis One Tower 50-28 1 245 Peachtree Center Ave. NE, Suite 1200 License Nos.

DPR-32 Atlanta, Georgia 30303-1257 DPR-37

Dear Mr. McCree,

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 WRITTEN AND OPERATING EXAMINATION COMMENTS In accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Section ES-402, Virginia Electric and Power Company submits the following information concerning the Reactor Operator and Senior Reactor Operator Initial Operating and Written Examinations administered at Surry Power Station from July 21, 2014 through August 1,2014.

There are no post-exam comments concerning the Surry Reactor Operator and Senior Reactor Operator Initial Operating and Written Examinations.

If you have any question or require additional information, please contact Mr. Paul Orrison or Mr. Mike Meyer at (757)-365-2835.

Very truly yours, N. L. Lane Site Vice President Surry Power Station Commitments: None

Serial No. 14-080E Written and Operating Examination Comments Docket Nos. 50-280 50-281 Page 2 of 2 copy:

Mr. M. T. Widman, Chief Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave. NE, Suite 1200 Atlanta, Georgia 30303-1 257 Mr. David Lanyi, Chief Examiner Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave. NE, Suite 1200 Atlanta, Georgia 30303-1257 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station