Response to Regulatory Issue Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees, Revision 1
ML16062A294
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/26/2016
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16062A293 List:
References
102-07202-TNW/DCE, RIS-2015-16
Download: ML16062A294 (4)


Text

10 CFR 50.90 Palo Verde Nuclear Generating Station 5801 S. Wintersburg Road Enclosure 2 contains PROPRIETARY Tonopah, AZ 85354 information to be withheld under 10 CFR 2.390 102-07202-TNW/DCE February 26, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51 and NPF-74 Response to Regulatory Issue Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees, Revision 1 Regulatory Issue Summary (RIS) 2015-16, Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees, dated January 15, 2016, requested licensees to provide information regarding the licensing actions that are planned to be submitted to the NRC staff for review over the next 2 calendar years and power uprate applications planned over the next 5 years. The requested information is strictly voluntary. The NRC staff plans to use the information in allocating its resources for licensing reviews.

Arizona Public Service Company (APS) supports the objective of the RIS in promoting early communication with the NRC staff regarding planned licensing activities. Enclosure 1 of this letter provides estimated licensing actions over the next 2 calendar years for the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 and Enclosure 2 of this letter provides estimated power uprate licensing actions over the next 5 calendar years.

APS requests that the contents of Enclosure 2 be withheld from public disclosure, pursuant to 10 CFR 2.390. The NRC has waived the affidavit requirements on its own initiative as documented in the RIS, since the response to the survey contains business-sensitive information, the disclosure of which is likely to cause competitive harm and should, therefore, be classified as proprietary information.

The enclosures reflect the current target dates for the APS submittals. These target dates are subject to change. Also, operational considerations may result in the addition of licensing actions that are not currently itemized in the enclosures.

A copy of this letter and enclosures is being provided to Tracy Orf, Division of Operating Reactor Licensing, Technical Assistant.

Enclosure 2 of this document contains SUNSI information. The transmittal document is decontrolled when Enclosure 2 is detatched.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

102-07202-TNW/DCE ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Response to RIS 2015-16, Revision 1 Page 2 No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael Dilorenzo, Licensing Section Leader, at (623) 393-3495.

Sincerely, Digitally signed by Weber, Thomas Weber, Thomas N(Z00499)

DN: cn=Weber, Thomas N(Z00499)

Reason: I am approving this N(Z00499) document Date: 2016.02.26 18:31:31 -07'00' Thomas N. Weber Nuclear Regulatory Affairs Department Leader TNW/DCE - Table of Estimated Licensing Actions for PVNGS Units 1, 2 and 3 - Table of Estimated Power Uprate Licensing Actions for PVNGS Units 1, 2 and 3 cc:

M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS L. J. Klos NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS T. Orf NRC Technical Assistant, Division of Operating Reactor Licensing Digitally signed by Elkinton, Elkinton, Delbert Delbert C(Z34657)

DN: cn=Elkinton, Delbert C(Z34657)

C(Z34657) Reason: By Direction Date: 2016.03.02 09:59:53 -07'00'

Enclosure 1 Table of Estimated Licensing Actions for PVNGS Units 1, 2 and 3

Enclosure 1 Table of Estimated Licensing Actions for PVNGS Units 1, 2 and 3 Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3; Dockets 50-528, 50-529. and 50-530 Proposed Submittal Date Proposed Submittal Can the NRC MM/YYYY (for items Date Outage staff make the Proprietary expected to be Outage Licensing Action (Quarter/Calendar Related? information Comments Information TSTF submitted within 1 year) Related Plant Name and Type Year) (if precise (Yes or No) public? (Yes (include any (Yes or No)

Number, Licensing Action Description/Title and Date Unit Number(s) [Please select from date is not [Please or No) associated [Please if any YYYY ( for items (MM/DD/Y drop list] available) select from [Please select contingencies) select from expected to be YYY)

[Please select from drop list] from drop drop list]

submitted beyond the drop list] list]

second year)

Revise TS 3.3.7 Degraded Voltage Relay PVNGS 1, 2, 3 License Amendment Apr-16 (02) April - June 2016 No Yes Regulatory Commitment No Time Delay Setting Adopt TSTF-523, Generic Letter PVNGS 1, 2, 3 License Amendment 523 Jun-16 (02) April - June 2016 No Yes Regulatory Commitment No 2008-01, Managing Gas Accumulation Revise TSs to permit use of Next Exact Outage Date TBD PVNGS 1, 2, 3 License Amendment Jun-16 (02) April - June 2016 Yes Yes No Generation Fuel in October 2018 Exemption to 10 CFR 50.46 per 10 CFR Exact Outage Date TBD PVNGS 1, 2, 3 Exemptions 50.12 to permit use of Next Generation Jun-16 (02) April - June 2016 Yes Yes No in October 2018 Fuel Adopt TSTF-426: Revise or Add Actions to PVNGS 1, 2, 3 License Amendment 426 Nov-16 (04) Oct - Dec 2016 No Yes No Preclude Entry into LCO 3.0.3 Adopt TSTF-493: Implement in TS for as-found and as-left set-points per TSTF-493, PVNGS 1, 2, 3 License Amendment 493 Clarify Application of Setpoint 2017 (05) Jan - March 2017 No Yes Regulatory Commitment No Methodology for Limiting Safety System Settings Submit 4th Interval ASME Section XI 3rd ISI intervals expire PVNGS 1, 2, 3 Relief Request 2017 (05) Jan - March 2017 No Yes No Inservice Inspection (ISI) Relief Requests in 2018 Adopt 10 CFR 50.69, Risk-informed categorization and treatment of structures, PVNGS 1, 2, 3 License Amendment 2017 (07) July - Sept 2017 No Yes No systems and components for nuclear power reactors Adopt TSTF-545: TS Inservice Testing PVNGS 1, 2, 3 License Amendment 545 2017 (07) July - Sept 2017 No Yes No (IST) Program Removal Revise TS 5.5.16 to adopt integrated leak PVNGS 1, 2, 3 License Amendment rate testing (Type A Test) 15 year interval 2017 (08) Oct - Dec 2017 No Yes Next ILRT in 2025 No permanently

10 CFR 50.90 Palo Verde Nuclear Generating Station 5801 S. Wintersburg Road Enclosure 2 contains PROPRIETARY Tonopah, AZ 85354 information to be withheld under 10 CFR 2.390 102-07202-TNW/DCE February 26, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51 and NPF-74 Response to Regulatory Issue Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees, Revision 1 Regulatory Issue Summary (RIS) 2015-16, Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees, dated January 15, 2016, requested licensees to provide information regarding the licensing actions that are planned to be submitted to the NRC staff for review over the next 2 calendar years and power uprate applications planned over the next 5 years. The requested information is strictly voluntary. The NRC staff plans to use the information in allocating its resources for licensing reviews.

Arizona Public Service Company (APS) supports the objective of the RIS in promoting early communication with the NRC staff regarding planned licensing activities. Enclosure 1 of this letter provides estimated licensing actions over the next 2 calendar years for the Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 and Enclosure 2 of this letter provides estimated power uprate licensing actions over the next 5 calendar years.

APS requests that the contents of Enclosure 2 be withheld from public disclosure, pursuant to 10 CFR 2.390. The NRC has waived the affidavit requirements on its own initiative as documented in the RIS, since the response to the survey contains business-sensitive information, the disclosure of which is likely to cause competitive harm and should, therefore, be classified as proprietary information.

The enclosures reflect the current target dates for the APS submittals. These target dates are subject to change. Also, operational considerations may result in the addition of licensing actions that are not currently itemized in the enclosures.

A copy of this letter and enclosures is being provided to Tracy Orf, Division of Operating Reactor Licensing, Technical Assistant.

Enclosure 2 of this document contains SUNSI information. The transmittal document is decontrolled when Enclosure 2 is detatched.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

102-07202-TNW/DCE ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Response to RIS 2015-16, Revision 1 Page 2 No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael Dilorenzo, Licensing Section Leader, at (623) 393-3495.

Sincerely, Digitally signed by Weber, Thomas Weber, Thomas N(Z00499)

DN: cn=Weber, Thomas N(Z00499)

Reason: I am approving this N(Z00499) document Date: 2016.02.26 18:31:31 -07'00' Thomas N. Weber Nuclear Regulatory Affairs Department Leader TNW/DCE - Table of Estimated Licensing Actions for PVNGS Units 1, 2 and 3 - Table of Estimated Power Uprate Licensing Actions for PVNGS Units 1, 2 and 3 cc:

M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS L. J. Klos NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS T. Orf NRC Technical Assistant, Division of Operating Reactor Licensing Digitally signed by Elkinton, Elkinton, Delbert Delbert C(Z34657)

DN: cn=Elkinton, Delbert C(Z34657)

C(Z34657) Reason: By Direction Date: 2016.03.02 09:59:53 -07'00'

Enclosure 1 Table of Estimated Licensing Actions for PVNGS Units 1, 2 and 3

Enclosure 1 Table of Estimated Licensing Actions for PVNGS Units 1, 2 and 3 Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3; Dockets 50-528, 50-529. and 50-530 Proposed Submittal Date Proposed Submittal Can the NRC MM/YYYY (for items Date Outage staff make the Proprietary expected to be Outage Licensing Action (Quarter/Calendar Related? information Comments Information TSTF submitted within 1 year) Related Plant Name and Type Year) (if precise (Yes or No) public? (Yes (include any (Yes or No)

Number, Licensing Action Description/Title and Date Unit Number(s) [Please select from date is not [Please or No) associated [Please if any YYYY ( for items (MM/DD/Y drop list] available) select from [Please select contingencies) select from expected to be YYY)

[Please select from drop list] from drop drop list]

submitted beyond the drop list] list]

second year)

Revise TS 3.3.7 Degraded Voltage Relay PVNGS 1, 2, 3 License Amendment Apr-16 (02) April - June 2016 No Yes Regulatory Commitment No Time Delay Setting Adopt TSTF-523, Generic Letter PVNGS 1, 2, 3 License Amendment 523 Jun-16 (02) April - June 2016 No Yes Regulatory Commitment No 2008-01, Managing Gas Accumulation Revise TSs to permit use of Next Exact Outage Date TBD PVNGS 1, 2, 3 License Amendment Jun-16 (02) April - June 2016 Yes Yes No Generation Fuel in October 2018 Exemption to 10 CFR 50.46 per 10 CFR Exact Outage Date TBD PVNGS 1, 2, 3 Exemptions 50.12 to permit use of Next Generation Jun-16 (02) April - June 2016 Yes Yes No in October 2018 Fuel Adopt TSTF-426: Revise or Add Actions to PVNGS 1, 2, 3 License Amendment 426 Nov-16 (04) Oct - Dec 2016 No Yes No Preclude Entry into LCO 3.0.3 Adopt TSTF-493: Implement in TS for as-found and as-left set-points per TSTF-493, PVNGS 1, 2, 3 License Amendment 493 Clarify Application of Setpoint 2017 (05) Jan - March 2017 No Yes Regulatory Commitment No Methodology for Limiting Safety System Settings Submit 4th Interval ASME Section XI 3rd ISI intervals expire PVNGS 1, 2, 3 Relief Request 2017 (05) Jan - March 2017 No Yes No Inservice Inspection (ISI) Relief Requests in 2018 Adopt 10 CFR 50.69, Risk-informed categorization and treatment of structures, PVNGS 1, 2, 3 License Amendment 2017 (07) July - Sept 2017 No Yes No systems and components for nuclear power reactors Adopt TSTF-545: TS Inservice Testing PVNGS 1, 2, 3 License Amendment 545 2017 (07) July - Sept 2017 No Yes No (IST) Program Removal Revise TS 5.5.16 to adopt integrated leak PVNGS 1, 2, 3 License Amendment rate testing (Type A Test) 15 year interval 2017 (08) Oct - Dec 2017 No Yes Next ILRT in 2025 No permanently