MONTHYEARML23283A0312023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 9: IST Program Refueling Outage Justifications Rev. 4 NRC-23-0063, Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 12023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1 ML23283A0342023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 11: IST Program Valve Basis Revision 1 ML23283A0322023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 10: IST Program Technical Positions Revision 2 ML23283A0302023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 8: IST Program Cold Shutdown Justifications Rev. 4 ML23283A0292023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 7: IST Program Relief Request Revision 3 ML23283A0282023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 6: IST Check Valve Condition Monitoring Plans Rev. 3 ML23283A0272023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 5: IST Valve Scope Table Revision 4 ML23283A0262023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 4: IST Valve Testing Program (Revision 3) ML23283A0232023-10-0909 October 2023 Inservice Testing Program Fourth Ten-Year Interval ML23283A0252023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 3: IST Pump Scope Table (Revision 4) ML23283A0242023-10-0909 October 2023 Inservice Testing Program for Pumps and Valves - Part 2: IST Pump Testing Program (Revision 3) NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-20-0064, Inservice Inspection Summary Report2020-11-0303 November 2020 Inservice Inspection Summary Report NRC-20-0012, Submittal of Valve Relief Requests VRR-010 and VRR-011 for the Inservice Testing Program Fourth 10-Year Interval2020-01-24024 January 2020 Submittal of Valve Relief Requests VRR-010 and VRR-011 for the Inservice Testing Program Fourth 10-Year Interval NRC-19-0047, Submittal of Valve Relief Requests for the Inservice Testing Program Fourth 10-Year Interval2019-06-14014 June 2019 Submittal of Valve Relief Requests for the Inservice Testing Program Fourth 10-Year Interval NRC-19-0025, Submittal of Valve Relief Requests for the Inservice Testing Program Fourth 10-Year Interval2019-05-29029 May 2019 Submittal of Valve Relief Requests for the Inservice Testing Program Fourth 10-Year Interval NRC-19-0015, Submittal of Pump Relief Requests for the Inservice Testing Program Fourth 10-Year Interval2019-03-27027 March 2019 Submittal of Pump Relief Requests for the Inservice Testing Program Fourth 10-Year Interval NRC-19-0016, Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Fourth Ten-year Interval2019-02-28028 February 2019 Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Fourth Ten-year Interval NRC-19-0010, Inservice Inspection Summary Report for Activities Performed at DTE Electric Company'S (DTE) Fermi 2 Nuclear Power Plant During the 19th Refueling Outage in Fall 20182019-01-23023 January 2019 Inservice Inspection Summary Report for Activities Performed at DTE Electric Company'S (DTE) Fermi 2 Nuclear Power Plant During the 19th Refueling Outage in Fall 2018 NRC-17-0081, Supplement to Revised Relief Request No. RR-A37, Revision 1, for the Inservice Inspection Program Third 10-Year Interval2017-12-0808 December 2017 Supplement to Revised Relief Request No. RR-A37, Revision 1, for the Inservice Inspection Program Third 10-Year Interval NRC-17-0047, Inservice Inspection Summary Report2017-07-17017 July 2017 Inservice Inspection Summary Report ML16189A2182016-06-29029 June 2016 BWR Vessel and Internals Project - Vessel Internals Inspection Summaries for Fall 2015 Outages NRC-16-0001, Request for Relief from ASME OM Code 5-Year Test Interval2016-03-16016 March 2016 Request for Relief from ASME OM Code 5-Year Test Interval ML16053A1852016-02-22022 February 2016 Inservice Inspection Summary Report for 17th Refueling Outage in Fall 2015 NRC-15-0027, Submittal of Inservice Testing Program Relief Request PRR-012 for Quarterly Test of Core Spray Pumps2015-03-0505 March 2015 Submittal of Inservice Testing Program Relief Request PRR-012 for Quarterly Test of Core Spray Pumps NRC-14-0024, Inservice Inspection Summary Report2014-07-0202 July 2014 Inservice Inspection Summary Report NRC-13-0040, Submittal of Inservice Testing Program Relief Request PRR-011, for the Third Ten-Year Interval2013-08-0707 August 2013 Submittal of Inservice Testing Program Relief Request PRR-011, for the Third Ten-Year Interval NRC-12-0052, Inservice Inspection Summary Report2012-08-0101 August 2012 Inservice Inspection Summary Report ML12272A0552012-05-18018 May 2012 Inservice Testing Program, Third Ten-Year Interval, Third Interval Start - February 17, 2010 NRC-11-0006, Inservice Inspection Summary Report During Refueling Outage 142011-02-23023 February 2011 Inservice Inspection Summary Report During Refueling Outage 14 NRC-10-0033, Response to Request for Additional Information Regarding Relief Requests PRR-002 and PRR-003 for the Inservice Testing Program Third Ten-Year Interval2010-04-22022 April 2010 Response to Request for Additional Information Regarding Relief Requests PRR-002 and PRR-003 for the Inservice Testing Program Third Ten-Year Interval NRC-10-0004, Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Third Ten-year Interval2010-01-20020 January 2010 Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Third Ten-year Interval NRC-08-0012, Inservice Inspection Summary Report for 20072008-02-15015 February 2008 Inservice Inspection Summary Report for 2007 NRC-06-0054, Inservice Inspection Summary Report2006-08-0202 August 2006 Inservice Inspection Summary Report NRC-05-0023, Request to Use Later Edition and Addenda of the ASME OM Code for Pressure Relief Valve Testing2005-04-15015 April 2005 Request to Use Later Edition and Addenda of the ASME OM Code for Pressure Relief Valve Testing NRC-05-0010, Inservice Inspection Summary Report for 20042005-02-25025 February 2005 Inservice Inspection Summary Report for 2004 NRC-03-0061, Inservice Inspection Summary Report2003-08-0808 August 2003 Inservice Inspection Summary Report NRC-02-0012, Detroit Edison'S Submittal of Inservice Inspection Summary Report for Fermi 22002-02-28028 February 2002 Detroit Edison'S Submittal of Inservice Inspection Summary Report for Fermi 2 2023-08-31
[Table view] Category:Letter
MONTHYEARIR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05
[Table view] |
Text
Keith J. Poison Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4849 Fax: 734.586.4172 Email: poisonk@dteenergy.com DTE Energy-February 22, 2016 10 CFR 50.55a NRC-16-0007 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Inservice Inspection Summary Report Enclosed is the Summary Report of the Inservice Inspection (ISI) activities performed at DTE Electric Company's (DTE) Fermi 2 Nuclear Power Plant during the 17 th Refueling Outage in Fall 2015. This report represents a partial summary of the ISI activities for the third Ten-Year Inspection Interval that began on May 2, 2009 and is scheduled for completion on May 1, 2019.
This report is being submitted in accordance with Code Case N532-4 on the Form OAR-1, Owner's Activity Report.
Should you have any questions or require additional information, please contact Mr. Alan I. Hassoun of my staff at (734) 586-4287.
Sincerely, Keith J. Polson Site Vice President
USNRC NRC-16-0007 Page 2
Enclosure:
Form OAR-1 Owner's Activity Report cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III M. Wilson - Authorized Nuclear Inservice Inspector (ANII)
Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)
M. Moore - Chief Inspector Michigan Department of Labor & Economic Growth Bureau of Construction Codes and Fire Safety - Boiler Division
Enclosure to NRC-16-0007 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Form OAR-1 Owner's Activity Report
-. ~ ~ ~Feriii Nu.cer Power',Station FomOAR1 Owner's Actiity Reor Report Number RF-17 OAR-1 Plant Ferml NPP 6400 North Dixie Hwy, Newport, MI 48166 (Name and Address of Plant)
Unit No. 2 Commercial Service Date 1/23/1988 Refueling Outage No. 17 (if applicable)
Current inspection Interval Third (1st, 2nd, 3rd, 4th, other)
Current inspection Period Second (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition with 2003 Addenda Date and Revision of inspection plans 11/12/2015, Revision 10 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Code Case used: N-460, N-532-4, N-586-1, N-613-1, N-639, N-685, N-702, N-716-1 (If applicable)
CERTIFICATE OF CONFORMANCE I certify that (a)the statements made inthis report are correct; (b)the examinations and tests meet the Inspection Plan as required by the ASME RF-17 Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of conform to the requirements of Section XI. (Refueling Outage Number)
Signed Marc A. Brooks ISI Program Owner 1'm lJt Date__
Owners or Owner's Designee, tile CERTIFICATE OF INSERVICE INSPECTION State or I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Province of Michigan and employed by HSB CT of One State St., Hartford CT have inspected the items described inthis Owner's ActivityReport, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
the repair/replacement activities By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
ice__-_-
_______ ______ Commissions NB9486, M1610, A B IN N S Inspector's Signature National Board, State, Province, and Endorsements Date 1/26/2016 ScheduleWorks V. 8.1 Page 1 - 1
RF17 Owners Activity Report Attachment TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description B-A, B1.12 Upper Shell Course Longitudinal Evaluation of embedded construction Seam Weld "Upjohn" sub-vert welding slag flaw Weld 1-308B not associated with a service induced degradation mechanism. The flaw is acceptable in accordance with ASME Section XI as a pre-existing construction indication per IWB-3112(b) and additionally was evaluated to have no postulated growth or structural impact using IWB-3600 type analytical evaluation.
RF17 OAR-i1Attachment Page 1
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number Division 2 Residual Heat Replacement section of 24" pipe in response to a 11/6/15 15-038 3 Removal Service Water Reoval Serie Wag failed ultrasonic WO 42565783 Return Line Piping examination Replacement section of Division 1 Emergency 10" pipe in response to a 15-039 3 Equipment Service Water failed ultrasonic 10/28/15WO 42565798 Return Line Piping examination RF17 OAR-i Attachment Page 2
Keith J. Poison Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4849 Fax: 734.586.4172 Email: poisonk@dteenergy.com DTE Energy-February 22, 2016 10 CFR 50.55a NRC-16-0007 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Inservice Inspection Summary Report Enclosed is the Summary Report of the Inservice Inspection (ISI) activities performed at DTE Electric Company's (DTE) Fermi 2 Nuclear Power Plant during the 17 th Refueling Outage in Fall 2015. This report represents a partial summary of the ISI activities for the third Ten-Year Inspection Interval that began on May 2, 2009 and is scheduled for completion on May 1, 2019.
This report is being submitted in accordance with Code Case N532-4 on the Form OAR-1, Owner's Activity Report.
Should you have any questions or require additional information, please contact Mr. Alan I. Hassoun of my staff at (734) 586-4287.
Sincerely, Keith J. Polson Site Vice President
USNRC NRC-16-0007 Page 2
Enclosure:
Form OAR-1 Owner's Activity Report cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III M. Wilson - Authorized Nuclear Inservice Inspector (ANII)
Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)
M. Moore - Chief Inspector Michigan Department of Labor & Economic Growth Bureau of Construction Codes and Fire Safety - Boiler Division
Enclosure to NRC-16-0007 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Form OAR-1 Owner's Activity Report
-. ~ ~ ~Feriii Nu.cer Power',Station FomOAR1 Owner's Actiity Reor Report Number RF-17 OAR-1 Plant Ferml NPP 6400 North Dixie Hwy, Newport, MI 48166 (Name and Address of Plant)
Unit No. 2 Commercial Service Date 1/23/1988 Refueling Outage No. 17 (if applicable)
Current inspection Interval Third (1st, 2nd, 3rd, 4th, other)
Current inspection Period Second (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition with 2003 Addenda Date and Revision of inspection plans 11/12/2015, Revision 10 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Code Case used: N-460, N-532-4, N-586-1, N-613-1, N-639, N-685, N-702, N-716-1 (If applicable)
CERTIFICATE OF CONFORMANCE I certify that (a)the statements made inthis report are correct; (b)the examinations and tests meet the Inspection Plan as required by the ASME RF-17 Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of conform to the requirements of Section XI. (Refueling Outage Number)
Signed Marc A. Brooks ISI Program Owner 1'm lJt Date__
Owners or Owner's Designee, tile CERTIFICATE OF INSERVICE INSPECTION State or I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Province of Michigan and employed by HSB CT of One State St., Hartford CT have inspected the items described inthis Owner's ActivityReport, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
the repair/replacement activities By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
ice__-_-
_______ ______ Commissions NB9486, M1610, A B IN N S Inspector's Signature National Board, State, Province, and Endorsements Date 1/26/2016 ScheduleWorks V. 8.1 Page 1 - 1
RF17 Owners Activity Report Attachment TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description B-A, B1.12 Upper Shell Course Longitudinal Evaluation of embedded construction Seam Weld "Upjohn" sub-vert welding slag flaw Weld 1-308B not associated with a service induced degradation mechanism. The flaw is acceptable in accordance with ASME Section XI as a pre-existing construction indication per IWB-3112(b) and additionally was evaluated to have no postulated growth or structural impact using IWB-3600 type analytical evaluation.
RF17 OAR-i1Attachment Page 1
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number Division 2 Residual Heat Replacement section of 24" pipe in response to a 11/6/15 15-038 3 Removal Service Water Reoval Serie Wag failed ultrasonic WO 42565783 Return Line Piping examination Replacement section of Division 1 Emergency 10" pipe in response to a 15-039 3 Equipment Service Water failed ultrasonic 10/28/15WO 42565798 Return Line Piping examination RF17 OAR-i Attachment Page 2