Letter Sequence Other |
---|
|
|
MONTHYEARDCL-15-031, Proposed Commitment for Response to NRC Request for Additional Information Regarding Submittal Date of the Integrated Analysis, National Fire Protection Association Standard 8052015-02-25025 February 2015 Proposed Commitment for Response to NRC Request for Additional Information Regarding Submittal Date of the Integrated Analysis, National Fire Protection Association Standard 805 Project stage: Response to RAI ML15280A2842015-10-20020 October 2015 Summary of Meeting with Pacific Gas & Electric to Discuss Diablo Canyon, Units 1 and 2 Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition), Project stage: Meeting ML15358A0022015-12-23023 December 2015 Request for Additional Information Email (Follow-up Pra), Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: RAI DCL-15-156, Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 and Supplement2015-12-31031 December 2015 Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 and Supplement Project stage: Supplement DCL-16-014, Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2016-01-28028 January 2016 Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) Project stage: Supplement ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations Project stage: Request ML16040A0702016-02-0909 February 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - State Comments on the License Amendment Federal Register Notice Project stage: Other ML16035A4412016-04-14014 April 2016 Issuance of Amendment Nos. 225 and 227, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) Project stage: Approval 2015-02-25
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24285A1902024-10-0808 October 2024 Email - Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Environmental Assessment ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24250A0502024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML24291A1322024-09-0505 September 2024 E-mail to California Department of Public Health for Diablo Canyon ISFSI License Renewal Environmental Assessment ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24135A1562024-05-13013 May 2024 July 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML24060A0022024-02-28028 February 2024 (External Sender) Pre-Sub Mittal EWS Participants List E-mail ML24045A1972024-02-0606 February 2024 Tribal Consultation Request ML24033A3062024-02-0101 February 2024 Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension ML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mothers for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition 2024-09-06
[Table view] |
Text
NRR-PMDAPEm Resource From: Regner, Lisa Sent: Tuesday, February 09, 2016 8:44 AM To: 'Cochran, Justin@Energy' Cc: Pascarelli, Robert; Lingam, Siva
Subject:
RE: Diablo Canyon 1 and 2 - State Comments on the License Amendment Federal Register Notice (CAC Nos. MF2333 and MF2334)
Mr. Cochran, Good Morning! When the NRC publishes an initial notice that we are reviewing a request and that weve made a no significant hazards consideration determination, its usually 30 days following the notice in the Federal Register, but the staff will normally respond to comments within the hearing period (usually 60 days).
Comments from the State, however, are handled a bit differently than the public. Im guessing that Mr. Lingam sent you the below email for your comments since the NRC expects to issue the Diablo Canyon NFPA-805 amendments in the next few weeks. We dont have a set comment period for the State, our regulations say within a timely manner of the State notification of impending issuance of the licensing action.
You are certainly within an appropriate time frame for this amendment. Since Mr. Lingam is on leave, I am happy to take your comments. Weve received some weather here in DC today and Im working at home. If youd like to discuss by phone, I can be reached through the NRC Operator at 301-415-7000, ask for Lisa Regner at home.
Let me know if you have any other questions I can help with.
Have a great day, Lisa Regner Lisa Regner Sr. Project Manager, LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1906 Lisa.Regner@nrc.gov From: Cochran, Justin@Energy tin.Cochran@energy.ca.gov
Sent: Monday, February 08, 2016 7:43 PM To: Regner, Lisa Cc: Lingam, Siva
Subject:
[External_Sender] Diablo Canyon 1 and 2 - State Comments on the License Amendment Federal Register Notice (CAC Nos. MF2333 and MF2334)
Good day Lisa, In reference to the highlighted item below, when does the comment period close?
Pacific Gas and Electric Company submitted a license amendment application dated June 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML131960159), as supplemented by letters dated October 3, 2013; September 29, October 27, October 29, November 26, and December 31, 2014; February 25, February 25, May 7, October 15, and December 31, 2015; and January 28, 2016 (ADAMS Accession Nos. ML13277A457, ML14272A470, ML14300A706, ML14302A804, ML14332A120, 1
ML14365A377, ML15056A774, ML15056A776, ML15127A649, ML15300A005, ML15365A534, and ML16028A494, respectively), for Diablo Canyon Power Plant (DCPP), Units 1 and 2 requesting NRC approval.
The amendment requests approval to transition the DCPP fire protection program to a risk-informed, performance-based program based on National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition (NFPA 805), in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Paragraph 50.48(c). NFPA 805 allows the use of performance-based methods such as fire modeling and risk-informed methods such as fire probabilistic risk assessment to demonstrate compliance with the nuclear safety performance criteria.
No significant hazards consideration was published in the Federal Register on December 26, 2013 (78 FR 78408) for the above described license amendment. Please provide your comments, if any, on the issuance of the above described license amendment.
Thank you for your time and consideration.
Best Regards, Justin Cochran, Ph.D.
Nuclear Policy Advisor &
Emergency Coordinator California Energy Commission 1516 Ninth Street Sacramento, CA 95814 Office: 916-657-4353 Fax: 916-654-4475 justin.cochran@energy.ca.gov 2
Hearing Identifier: NRR_PMDA Email Number: 2648 Mail Envelope Properties (06567e8dc8be406b95f24cc8fc64ae2d)
Subject:
RE: Diablo Canyon 1 and 2 - State Comments on the License Amendment Federal Register Notice (CAC Nos. MF2333 and MF2334)
Sent Date: 2/9/2016 8:43:41 AM Received Date: 2/9/2016 8:43:42 AM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:
"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>
Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None
"'Cochran, Justin@Energy'" <Justin.Cochran@energy.ca.gov>
Tracking Status: None Post Office: HQPWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 3659 2/9/2016 8:43:42 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
NRR-PMDAPEm Resource From: Regner, Lisa Sent: Tuesday, February 09, 2016 8:44 AM To: 'Cochran, Justin@Energy' Cc: Pascarelli, Robert; Lingam, Siva
Subject:
RE: Diablo Canyon 1 and 2 - State Comments on the License Amendment Federal Register Notice (CAC Nos. MF2333 and MF2334)
Mr. Cochran, Good Morning! When the NRC publishes an initial notice that we are reviewing a request and that weve made a no significant hazards consideration determination, its usually 30 days following the notice in the Federal Register, but the staff will normally respond to comments within the hearing period (usually 60 days).
Comments from the State, however, are handled a bit differently than the public. Im guessing that Mr. Lingam sent you the below email for your comments since the NRC expects to issue the Diablo Canyon NFPA-805 amendments in the next few weeks. We dont have a set comment period for the State, our regulations say within a timely manner of the State notification of impending issuance of the licensing action.
You are certainly within an appropriate time frame for this amendment. Since Mr. Lingam is on leave, I am happy to take your comments. Weve received some weather here in DC today and Im working at home. If youd like to discuss by phone, I can be reached through the NRC Operator at 301-415-7000, ask for Lisa Regner at home.
Let me know if you have any other questions I can help with.
Have a great day, Lisa Regner Lisa Regner Sr. Project Manager, LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1906 Lisa.Regner@nrc.gov From: Cochran, Justin@Energy tin.Cochran@energy.ca.gov
Sent: Monday, February 08, 2016 7:43 PM To: Regner, Lisa Cc: Lingam, Siva
Subject:
[External_Sender] Diablo Canyon 1 and 2 - State Comments on the License Amendment Federal Register Notice (CAC Nos. MF2333 and MF2334)
Good day Lisa, In reference to the highlighted item below, when does the comment period close?
Pacific Gas and Electric Company submitted a license amendment application dated June 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML131960159), as supplemented by letters dated October 3, 2013; September 29, October 27, October 29, November 26, and December 31, 2014; February 25, February 25, May 7, October 15, and December 31, 2015; and January 28, 2016 (ADAMS Accession Nos. ML13277A457, ML14272A470, ML14300A706, ML14302A804, ML14332A120, 1
ML14365A377, ML15056A774, ML15056A776, ML15127A649, ML15300A005, ML15365A534, and ML16028A494, respectively), for Diablo Canyon Power Plant (DCPP), Units 1 and 2 requesting NRC approval.
The amendment requests approval to transition the DCPP fire protection program to a risk-informed, performance-based program based on National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition (NFPA 805), in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Paragraph 50.48(c). NFPA 805 allows the use of performance-based methods such as fire modeling and risk-informed methods such as fire probabilistic risk assessment to demonstrate compliance with the nuclear safety performance criteria.
No significant hazards consideration was published in the Federal Register on December 26, 2013 (78 FR 78408) for the above described license amendment. Please provide your comments, if any, on the issuance of the above described license amendment.
Thank you for your time and consideration.
Best Regards, Justin Cochran, Ph.D.
Nuclear Policy Advisor &
Emergency Coordinator California Energy Commission 1516 Ninth Street Sacramento, CA 95814 Office: 916-657-4353 Fax: 916-654-4475 justin.cochran@energy.ca.gov 2
Hearing Identifier: NRR_PMDA Email Number: 2648 Mail Envelope Properties (06567e8dc8be406b95f24cc8fc64ae2d)
Subject:
RE: Diablo Canyon 1 and 2 - State Comments on the License Amendment Federal Register Notice (CAC Nos. MF2333 and MF2334)
Sent Date: 2/9/2016 8:43:41 AM Received Date: 2/9/2016 8:43:42 AM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:
"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>
Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None
"'Cochran, Justin@Energy'" <Justin.Cochran@energy.ca.gov>
Tracking Status: None Post Office: HQPWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 3659 2/9/2016 8:43:42 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: