UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
February 2, 2016
Mr. David R. Vineyard
Site Vice President
Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA 31513
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL
EXAMINATION 05000321/2016301 AND 05000366/2016301
Dear Mr. Vineyard:
In a telephone conversation on January 20, 2016, between Mr. E. Jones, Plant Nuclear
Operations Instructor, and Mr. J. Viera, Operations Engineer, arrangements were made for the
administration of licensing examinations at Edwin I. Hatch Nuclear Plant during the weeks of
June 20 and 27, 2016. The written examination is scheduled to be administered during the
week of July 4, 2016. The on-site preparatory week is scheduled for the week of May 23, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors." The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by March 22, 2016. Mr. J. Viera provided the written examination outline to your staff in
June 2015. The written examinations, operating tests, and supporting reference materials
identified in Attachment 3 to ES-201 will be due by April 21, 2016. Pursuant to Title 10, Section
55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the examinations and tests before they are
submitted to the Commission for review and approval. All materials shall be complete and
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examination and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with ES-402, and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests until the examination results are final.
D. Vineyard
2
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 2,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments on any aspect of this collection of
information, including suggestions for reducing the burden, to the Information and Records
Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, or by Internet electronic mail to infocollectsresource@nrc.gov; and to the Desk Officer,
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management
and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRCs Rules of Practice, a copy of this letter will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRCs Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at
http://www.nrc.gov/reading-rm/adams.html.
D. Vineyard
3
Thank you for your cooperation in this matter. Mr. E. Jones has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet
E-mail: Joseph.Viera@nrc.gov), or me at (404) 997-4551, (Internet E-mail:
Gerald.McCoy@nrc.gov).
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos. 50-321, 50-366
cc: Distribution via Listserv
_____________
SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
SIGNATURE
JXV4
GJM1
NAME
JVIERA
MCCOY
DATE
2/1/2016
2/2/2016
2/ /2016
2/ /2016
2/ /2016
2/ /2016
2/ /2016
E-MAIL COPY?
YES
NO
YES
NO YES
NO
YES
NO
YES
NO YES
NO
YES
NO