LR-N16-0014, Implementation Schedule Change for License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)
| ML16034A265 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 02/03/2016 |
| From: | Jamila Perry Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LAR S14-03, LR-N16-0014 | |
| Download: ML16034A265 (2) | |
Text
FEB
. 3 2016 LR-N16-0014 LAR S14-03 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311 10 CFR 50.90
Subject:
Implementation Schedule Change for License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors during Mode 6 (Refueling)
References
- 1. PSEG letter to NRC, "License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors during Mode 6 (Refueling)," dated March 9, 2015 (ADAMS Accession No. ML15068A359)
In the Reference 1 letter, PSEG Nuclear LLC (PSEG) submitted a license amendment request (LAR) for Salem Nuclear Generating Station (Salem), Units 1 and 2. The proposed amendment would isolate unborated water sources and permit use of Gamma-Metrics Post-Accident neutron monitors during Mode 6 (Refueling).
PSEG requested NRC approval of the proposed LAR by March 9, 2016, to support planned modifications to replace the existing source range and intermediate range nuclear instrumentation during the Unit 1 Spring 2016 refueling outage ( 1 R24 ). PSEG has re-assessed the work scope for the Salem 1 R24 outage and determined that the replacement of the source range and intermediate detectors is going to be moved from the 1 R24 outage to the Fall 2017 refueling outage (1 R25). Based on this decision, PSEG is updating the implementation schedule requested in Reference 1.
PSEG is requesting a 120-day implementation period to allow for implementation to extend beyond the 1 R24 refueling outage.
Page 2 LR-N16-0014 There are no regulatory commitments contained in this letter.
10 CFR 50.90 If you have any questions or require additional information, please contact Mr. Brian Thomas at 856-339-2022.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on Respectfully, fEB
. S 2016 (date)
::p:.:?-
Site Vice President Salem Nuclear Generating Station cc:
Mr. D. Dorman, Administrator, Region I, NRC Ms. C. Parker, NRC Project Manager, Salem NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator
FEB
. 3 2016 LR-N16-0014 LAR S14-03 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311 10 CFR 50.90
Subject:
Implementation Schedule Change for License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors during Mode 6 (Refueling)
References
- 1. PSEG letter to NRC, "License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors during Mode 6 (Refueling)," dated March 9, 2015 (ADAMS Accession No. ML15068A359)
In the Reference 1 letter, PSEG Nuclear LLC (PSEG) submitted a license amendment request (LAR) for Salem Nuclear Generating Station (Salem), Units 1 and 2. The proposed amendment would isolate unborated water sources and permit use of Gamma-Metrics Post-Accident neutron monitors during Mode 6 (Refueling).
PSEG requested NRC approval of the proposed LAR by March 9, 2016, to support planned modifications to replace the existing source range and intermediate range nuclear instrumentation during the Unit 1 Spring 2016 refueling outage ( 1 R24 ). PSEG has re-assessed the work scope for the Salem 1 R24 outage and determined that the replacement of the source range and intermediate detectors is going to be moved from the 1 R24 outage to the Fall 2017 refueling outage (1 R25). Based on this decision, PSEG is updating the implementation schedule requested in Reference 1.
PSEG is requesting a 120-day implementation period to allow for implementation to extend beyond the 1 R24 refueling outage.
Page 2 LR-N16-0014 There are no regulatory commitments contained in this letter.
10 CFR 50.90 If you have any questions or require additional information, please contact Mr. Brian Thomas at 856-339-2022.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on Respectfully, fEB